Call, message or send the form
Tell Craig about the boardwalk or walkway, approximate size and postcode. You do not need a finished specification to start.

Specialist foundation installation
We install ground screw foundations for raised boardwalks and pedestrian walkways, including routes across wet ground. Where your project calls for concrete pads, footings or landings, we can quote those too.
50+ years
Family groundwork experience
Full 10-year
Written JustBases guarantee
Call Craig directly
Friendly practical advice
One clear price
Written foundation scope
Start with what you want to build
A dry path can turn into a muddy crossing after heavy rain. A raised boardwalk lets people pass above it without having to build up the entire route. For nature reserves, schools, estates and commercial grounds, we install the foundations beneath the walkway, ready for the agreed timber or steel frame.
Check the ground at representative points, not just at the entrance. Soft or organic layers, obstructions and uneven ground can affect the product choice and support layout.
Explore the details →Consider seasonal flooding and whether flowing water can wash soil away from the supports. Deck levels, clearances and any drainage measures belong in the agreed design.
Explore the details →Agree who will use the route and whether it must accommodate groups or maintenance equipment. The designer sets the support positions, loads, lateral restraint and connections to the frame.
Explore the details →Where a route is intended for public use, agree clear width, gradients, passing space, wet grip, safe edges and transitions with the walkway designer. Foundation levels affect how the finished route meets both approaches.
Explore the details →Three easy steps
Getting started is simple. We will guide you through the choices and explain any information needed before installation.
Tell Craig about the boardwalk or walkway, approximate size and postcode. You do not need a finished specification to start.
We discuss the site and suitable foundations, identify any supplier information needed and provide a clear written quotation.
Our team marks out and installs the agreed foundation, with the required checks before the next stage of your project.
Choose the foundation, not the complication
These are the methods worth assessing for this application. The structure, support plan and actual ground determine the right choice—not a one-size-fits-all specification.
Installed ground screws
We install specified ground screws as individual supports for the walkway frame. This can keep excavation localised and avoid concrete curing for the screw-supported sections. Screw length, spacing, connection and any required tests depend on the ground and the approved design, not the length of the route alone.
Worth considering for: Raised pedestrian routes over wet grass, reed beds or uneven ground where the design and site checks support screw foundations
Ask about this option →Concrete
We can quote separately for specified concrete pads, footings, landings or end supports. Concrete can suit particular connections or transitions, including on projects where screws support the main run. Soft ground still needs assessment; a concrete pad is not an automatic fallback where screws are unsuitable.
Worth considering for: Specified pads, landings and transition points with suitable bearing, excavation and access
Ask about this option →Clear prices, agreed scope
Specialist foundations need a quotation matched to the structure, ground and installation scope. A generic garden-building price would not reliably represent this project. Call Craig with your idea and postcode to get started.
No VAT is added to the guide prices shown.
Get your exact written priceView the full base price guideIts loads, footprint and accepted support arrangement.
Ground conditions, levels, buried services and practical access.
Specified materials, installation and any agreed testing or supporting frame.
Clear inclusions, responsibilities and timing before work is booked.
Easy to start, free to ask
You do not need drawings or a finished specification before getting in touch. Send what you have and Craig will explain the useful next step.
Helpful details, if available
Talk to Craig
Craig will listen to what you are planning and help establish the foundation information that matters.
We aim to answer within 24 hours, including weekends. If we cannot reply over the weekend, we will respond on the next business day.
Just give us your contact details and a short description of what you want to build. We will guide you through the rest.
Your enquiry
Boardwalk and walkway foundation installation
Planned around its use
We start by looking at ground screws. On a suitable site, they can support a route at individual points without excavating a continuous foundation or waiting for concrete to cure. That can be useful when access is narrow or there is vegetation and wet ground to protect. The installation route still needs planning so equipment can reach the work without unacceptable disturbance.
Wet ground is not all the same. Peat, soft silt or made ground can vary over a short distance. The project team needs to know what sits beneath the soft layer, how water moves through the site and how the frame handles sideways forces. We work with the designer on the installation details and can discuss site-specific ground screw testing where required.
The foundation installation and any agreed supporting frame are set out in the written quote. The walkway design, walking surface, ramps, handrails and guarding are separate unless the quote specifically includes them. You can start with a sketch, approximate route length and width, postcode and a few photos.
Discuss your project with Craig →Check the ground at representative points, not just at the entrance. Soft or organic layers, obstructions and uneven ground can affect the product choice and support layout.
Consider seasonal flooding and whether flowing water can wash soil away from the supports. Deck levels, clearances and any drainage measures belong in the agreed design.
Agree who will use the route and whether it must accommodate groups or maintenance equipment. The designer sets the support positions, loads, lateral restraint and connections to the frame.
Where a route is intended for public use, agree clear width, gradients, passing space, wet grip, safe edges and transitions with the walkway designer. Foundation levels affect how the finished route meets both approaches.
Share the narrowest access point and proposed working area. Ground protection, delivery access and seasonal restrictions can affect how the foundations are installed.
The design should account for moisture, corrosion, inspection access and intended service life. A standard screw or coating should not be assumed suitable for every wet or exposed setting.
When the design and ground are suitable
A screw-only foundation avoids pouring and curing concrete, reducing one source of weather-related delays. Unsafe access, flooding, frozen or unsuitable ground can still mean postponing installation.
Localised supports can reduce excavation and spoil compared with extensive concrete foundations. Clearance, pre-drilling, service trenches and machinery access may still disturb the site.
Using less concrete and moving less spoil can reduce material use and transport. Retaining vegetation may benefit habitats, but trees and wildlife still need protection. Steel manufacture and the full project design matter to any carbon comparison.
Before installation
For a raised public route, agree responsibilities for the walkway design, accessibility, drainage and maintenance before fixing foundation levels. Active Travel England's rural access guidance is a useful starting point for the wider route, rather than a specification for the supports beneath it.
Ask the landowner and project team to check permissions before work starts. In England, work near a main river, flood defence or in a floodplain can require an Environment Agency permit; ordinary watercourses have different consent routes. A designated site such as an SSSI can require separate consent. Choosing screws does not remove these checks.
JustBases quotes the agreed foundation and groundwork. Product installation, specialist connections, commissioning and third-party design remain outside our scope unless the written quotation expressly includes them.
Genuine customer feedback
Our full written guarantee covers installation workmanship and the foundation materials we supply, subject to your quotation. These genuine reviews describe Craig’s earlier work, with the original job types, dates, postcodes and sources shown below.
"I couldn't recommend Craig highly enough! Communication prior to the job was outstanding even considering our ever changing goal posts. Craig and his team turned up exactly at the agreed time, were well presented, friendly and professional. The cleanliness, attention to detail and quality of the job was outstanding."
— Verified Customer
Checkatrade · BH16 · 2020-05-27
Work listed by the source: Log cabin foundation
"Good standard of workmanship. Friendly and efficient. Prompt response for estimate and fitted into our timescale. Will be using the firm in future and thoroughly recommend them."
— Verified Customer
Checkatrade · SP6 · 2019-09-16
Work listed by the source: Concrete base for new summerhouse
"Craig and his team were very professional throughout the job. They worked tirelessly and extremely hard. The job involved digging up a thick reinforced concrete base. Then creating a whole new base with precision engineering in preparation to accept a new building on top. The result was an excellent job all round."
— Verified Customer
Checkatrade · BH24 · 2021-11-30
Work listed by the source: Building foundations and landscaping
Our service area
For this application, tell Craig the postcode and we will check suitable installation options and travel requirements across our listed towns.
Straight answers before you decide
Still unsure? Send Craig a short enquiry and we will help with the next step.
Level, secure foundations for enclosed cycle hubs, open shelters and anchor-rated cycle stands.
Explore this application →Manufacturer-led foundations for individual pods and multi-unit rural accommodation sites.
Explore this application →Firm, drained foundations for static horse and livestock shelters in paddocks and fields.
Explore this application →An outline of the project and your postcode are enough to start.