Detail of an installed ground screw

Ground screw testing in Aldershot

JustBases offers standalone ground screw testing in Aldershot, including suitable trial screws and existing supports fitted by other installers. Pull, compression and lateral tests investigate different loading directions. We discuss the evidence you need and quote the appropriate work separately from a foundation installation.

Pull, compression and lateral ground screw tests

Testing makes the response to an agreed applied load available for the foundation decision. Start with the question being investigated: a designer may need evidence for a proposed support, or an existing installation may require a specified check. We agree the appropriate procedure, selected supports and information to record with the responsible specifier.

The three physical methods below apply force in different directions. The combination required follows the project, with the test loads, limits and assessment criteria established before attendance.

Aldershot testing prices and scope

Use the testing guides to discuss a budget for the evidence required. The quotation identifies the methods, number and locations of supports, attendance, agreed preparation and written results. Access, travel and any trial installation or additional reporting requirements are settled with that scope.

Where the product, ground evidence and calculation method allow it, compression capacity may be derived from pull-test evidence. That is a calculated result on its stated basis. A direct compression test instead measures response under an applied downward load; specify which evidence is required when the test programme is agreed.

Installation torque monitoring and specialist torsional testing are separate, price-on-application services. Monitoring records turning resistance during screw insertion. A torsional test applies a defined twisting action. Each needs its own agreed procedure and quotation; neither is automatically part of the physical tests shown here.

Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.

Installation torque monitoring
Price on application
Specialist torsional load test
Price on application

Each additional test

Each extra charge applies to an additional test of the same type, at the same location on the same day. The first test of each type is priced separately.

Pull test (tensile or uplift test)
£160 extra
Load test (compression test)
£320 extra
Lateral test (sideways load)
£155 extra

No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.

Discuss a ground screw test with Craig

Tell us the purpose of the check and the postcode. If you have been asked for testing, explain who needs the results and share their request when convenient. We can establish what needs clarifying for the quotation without asking you to assemble a technical pack before contacting us.

Request your free quote

Tell us what you would like the testing to establish and the postcode. If someone has requested a particular test, you can send their instructions when available.

Your enquiry

Ground screw testing in Aldershot

Please provide either an email address or a phone number.

Add site photos, video or a drawing (optional)

Upload up to 5 photos or a short video of your site to help us provide an accurate quote.

0/5 files. JPG, PNG, WebP, PDF, MP4, MOV accepted — up to 100MB each.

Free, no-obligation quote. Your details are used to respond to this enquiry; see our privacy policy.

Agreeing the investigation and test visit

The planned test connects the project's question to a procedure that can be carried out safely at the chosen supports. Its acceptance requirements and responsibilities are agreed before the visit.

Establish the required check

The responsible designer or specifier identifies what needs investigating, the selected positions and the loads and criteria to apply. We confirm the test procedure and written information required for that assessment.

Confirm safe access to the selected supports

The physical setup needs suitable access to the screw and connection, space for the agreed loading arrangement and safe working conditions. Any existing structure, preparation or temporary support is considered before the work is booked.

Carry out the procedure and supply the findings

The agreed loading and observations are recorded for the tested supports. We provide the commissioned results and report, identifying any calculations separately so the responsible assessor can use the evidence appropriately.

Testing existing supports safely

An existing foundation can be considered for a separate test even when another contractor supplied it. The key practical issue is how the agreed load can reach the selected screw. Explain what is attached and show the connection from a safe, accessible position, so the review addresses the installed arrangement.

Keep the building and supports undisturbed while the procedure is reviewed. Where the test requires a connection released, load removed or temporary support, the person responsible for the structure must establish the safe provisions. Our quoted scope identifies the test work and any separately arranged preparation before attendance.

The results and written testing report

Use the report to review the particular check that was commissioned. It records the loading reached and response observed, allowing the responsible assessor to compare the findings with the specified requirement. Relevant limits or interruptions to the procedure are included with that outcome.

The report distinguishes physical measurements from calculated assessments. For a pull-derived compression value, it gives the applicable method and assumptions, keeping that calculation separate from a direct compression measurement.

Arranging your Aldershot test

If the results are needed for a project decision, tell us when that decision is due. We can discuss the proposed visit and reporting programme as the test scope is settled. The quotation makes clear what is being commissioned and any information or preparation needed before attendance.

For a new foundation as well as testing, see Aldershot ground screw installation. The town services page explains the other base choices. For work elsewhere, browse the Hampshire service towns.

Aldershot and nearby communities

We welcome enquiries from Aldershot town centre, North Town, Manor Park, Rowhill, Wellington, the Aldershot Park area and Wellesley, including residential addresses around the garrison.

Nearby Surrey enquiries are welcome from Ash, Ash Wharf, Ash Vale, Ash Green and Tongham, and from Farnham, Badshot Lea, Weybourne, Hale, Heath End, Upper Hale, Lower Hale, Sandy Hill, Folly Hill, The Bourne, Wrecclesham and Rowledge.

We also discuss projects in Runfold, Seale, The Sands, Normandy, Flexford, Wyke, Christmas Pie, Willey Green and Pinewoods, and around Farnborough, North Camp, Cove, Southwood, Mytchett, Frimley Green and Deepcut.

Other nearby places include Fleet, Church Crookham, Crookham Village, Ewshot, Crondall, Dogmersfield and Elvetham Heath, with enquiries welcome from Zebon Copse, Netherhouse Moor and Hareshill.

Useful postcode examples are GU11 and GU12 around Aldershot, with GU12 also used in Ash and Ash Vale; GU9 and GU10 towards Farnham and neighbouring villages; GU14 for Farnborough; GU16 around Mytchett and Frimley Green; GU3 for Normandy; and GU51 or GU52 around Fleet and Church Crookham. Give us the full site address and postcode so we can agree the work, access and travel for that enquiry.

Feedback on Craig’s earlier work

Feedback on Craig’s earlier groundwork and customer service.

"Craig and the team are absolutely fantastic. From courtesy, to standard of work, to tidiness — everything exceeded expectations. The job was arranged, booked and done extremely quickly and we are very happy with the results. Nothing was too much trouble, and communication was easy."
— Verified CustomerMyBuilder · SO · Cobble edge and gravel strip
"Craig and his crew were excellent from the first communication, quote, timing of work and quality of work. Highly recommended."
— Verified CustomerCheckatrade · BH20 · Garage base

Aldershot ground screw testing questions

Can I discuss testing before I know which check is needed?

Yes. Explain the decision you are trying to make or the request you have received, with the postcode. We can discuss the enquiry and identify what the responsible designer or specifier needs to clarify. The selected procedure, loads and assessment criteria must be agreed for the work, but you do not need to supply them all to start a conversation.

Will you consider screws fitted by another installer?

Yes, where the supports and proposed test arrangement are suitable. Existing product details and installation records help us understand the work, so send what you have when available. We discuss access and the requested investigation before quoting. Testing another company's screws is commissioned as its own service, with the report limited to the agreed evidence.

How do I choose between pull, compression and lateral testing?

Each investigates a different force direction. The choice follows the loads and evidence the foundation assessment needs, so the responsible specifier should identify the required methods. We can discuss that request and the practical setup. A project may need one method or several, and the agreed programme states which tests are included.

What does a direct compression test establish?

It records the selected support's response as a downward load is applied through the agreed setup. The specified loading sequence and movement observations provide evidence for comparison with the project's criteria. The result relates to that test arrangement and support; the responsible assessor decides how it contributes to the foundation design.

When is a compression figure calculated from a pull test?

That route is considered when an applicable calculation method is supported by the screw product and relevant ground evidence. Its assumptions and basis must be stated. It derives a compression value from pull evidence rather than measuring downward response. If the project requires a direct compression test, that physical procedure needs to be commissioned expressly.

How is uplift investigated during a pull test?

The agreed procedure applies an upward force to the selected screw and records its response as loading progresses. The project specifies what loading and observations are required and how the evidence will be assessed. Connection and setup details form part of that procedure, allowing the recorded findings to be interpreted for the uplift check being requested.

What space is needed for lateral testing?

We assess the space around the selected support for the agreed horizontal-loading arrangement. Access to the connection and nearby structures or features that need to remain are part of that review. Describe the position or send photographs when available. The required force direction and procedure then inform the safe setup and any preparation to include in the quotation.

Can a trial be arranged before the main screw installation?

A suitable trial can investigate a proposed screw and foundation requirement before the wider work is settled. Agree the question with the person specifying the foundation, then discuss the trial with us. The quotation identifies the test work and responsibilities for obtaining and fitting the trial supports, site preparation and what happens to those supports afterwards.

Who sets the test loads and decides whether a result meets the requirement?

The responsible designer or specifier establishes the required loading, test positions and acceptance criteria for the project. JustBases confirms the practical procedure and provides the commissioned testing evidence. The appropriate assessor then uses the findings against those requirements. If your request is incomplete, we can identify the points to clarify before the work is booked.

What if the screws already support a building?

Tell us about the attached structure when enquiring, including how the supports and connections can be reached. Its carried loads and stability must be considered in the safe test arrangement. Leave the structure and connections unchanged while that is reviewed. Any necessary release or temporary support needs appropriate approval and an agreed responsible party before testing can proceed.

Can insertion torque be monitored on the testing visit?

Insertion monitoring records turning resistance while a screw is being installed, so it must be coordinated with that installation stage. An existing support's loading test does not recreate its original insertion record. Ask about monitoring before the relevant screws are fitted; it is a separately scoped, price-on-application service rather than an automatic addition to a later test.

Is a specialist torsional test the same as torque monitoring?

No. A torsional test applies an agreed twisting load to investigate rotational behaviour. Monitoring observes resistance during insertion. If rotational testing is required, share the request so the procedure, connection and recording can be considered for a separate price-on-application quotation. It is distinct from pull, compression and lateral testing as well as from installation monitoring.

Does a test report approve the whole building foundation?

The report records the work commissioned and its results, including any stated calculation basis. Complete-foundation approval also involves the support layout, frame, connections, building loads and other relevant design matters. Those remain with the responsible designer or assessor. Tell us about a required report format or approval process at quotation stage so the testing contribution is clear.

What do you need to price a testing enquiry?

Start with the purpose and postcode, and tell Craig what stage the project has reached. We can discuss the work while any test instructions or product records are being obtained. The quotation is developed from the agreed methods, supports, attendance and reporting scope, with preparation and access considered before booking. Photos and drawings are welcome but optional initially. At the same location on the same day, each additional compression test costs £320 extra, each additional pull, tensile or uplift test costs £160 extra, and each additional lateral test costs £155 extra. These fixed charges are for further tests of the same type; the first test of each type is priced separately.

Ask for your testing quotation

Call Craig on 01202 039753 or send your testing purpose and postcode through the form. We can discuss the required check, develop the scope and provide a written quotation for the agreed work.