Detail of an installed ground screw

Ground screw testing in Andover

Arrange ground screw testing in Andover to obtain the measurements your project needs. JustBases considers trial supports and suitable existing screws, including those installed by another company. Testing can be commissioned on its own.

Ground screw tests we offer

Testing applies a controlled load and records how the selected screw responds. The load direction, test position and measurements are chosen to answer the project's question. We discuss the required evidence and reporting with you, using the designer's brief where one has already been prepared.

You can enquire while the details are being developed. Tell us whether this concerns a proposed foundation, screws already in place or a change to the building they support. We then establish the method and site arrangements before confirming attendance.

Pull-out testing

An upward load is applied to assess the screw's response to uplift. The agreed loading stages and measured movement provide evidence about the tested support under that direction of force.

Learn more: Pull-out testing

Lateral testing

A sideways load is applied in the specified direction, with movement recorded through the agreed programme. This can provide evidence where horizontal forces are relevant to the foundation design.

Learn more: Lateral testing

Ground screw testing prices in Andover

The starting fees below help you plan a test enquiry. A quotation is prepared for the actual programme: the methods, test points, loads, site setup and reporting required. Share any deadline so the visit and report can be considered together.

Installation torque monitoring and specialist torsional testing are separate, each price on application. Monitoring records turning resistance as a screw goes in; a torsional test applies a defined twisting load. Tell us which information has been requested, or send the request so its purpose can be clarified.

Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.

Installation torque monitoring
Price on application
Specialist torsional load test
Price on application

Each additional test

Each extra charge applies to an additional test of the same type, at the same location on the same day. The first test of each type is priced separately.

Pull test (tensile or uplift test)
£160 extra
Load test (compression test)
£320 extra
Lateral test (sideways load)
£155 extra

No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.

Ask about a ground screw test

Give us the site postcode and what you need the testing to establish. Existing test instructions, screw details or photos are welcome if available, but a description is enough to start. Call 01202 039753 or message Craig on WhatsApp to discuss the requirement.

Request your free quote

Tell us where the screws are and what you need to find out. We can help establish the next step from a short description.

Your enquiry

Ground screw testing in Andover

Please provide either an email address or a phone number.

Add site photos, video or a drawing (optional)

Upload up to 5 photos or a short video of your site to help us provide an accurate quote.

0/5 files. JPG, PNG, WebP, PDF, MP4, MOV accepted — up to 100MB each.

Free, no-obligation quote. Your details are used to respond to this enquiry; see our privacy policy.

How ground screw testing works

A useful test starts with an agreed purpose and a practical way to carry it out. We establish the brief, access and deliverables before the visit, including the responsibilities for preparing the selected supports.

Confirm the test and reporting brief

Identify the screws, directions, required loads and measurements. The responsible designer or project brief establishes the acceptance criteria where these are required. We agree the written report and any calculations to be supplied.

Agree access and safe preparation

Review the approach, available working space and condition of the selected support heads. Establish a suitable connection and loading arrangement, with any necessary exposure or other preparation planned safely before attendance.

Apply the loads and record the findings

Carry out the agreed loading programme and record the response against the identified test points. The report sets out the method, results and agreed calculations so they can be considered for the stated project purpose.

Testing existing screws and trial installations

We can consider a testing-only commission for screws fitted by another installer. Product information, installation records and the planned or existing building arrangement help establish what is being tested. Send whatever information you already hold; we identify the further detail needed to confirm a suitable programme.

Existing screws need a safe connection and enough room for the agreed loading setup. A frame, deck or completed building may affect how the test point can be reached and isolated. Show the visible arrangement and discuss it with us before changing anything. Any necessary exposure, temporary support or alteration must be planned and allocated to the appropriate people.

Trial supports can help obtain evidence while the foundation design is being developed. Agree their purpose, positions and relationship to the proposed work with the designer, allowing time for the results to inform the next decision. Tell us if the main installation or building delivery is already scheduled.

For a project that also needs new supports, our Andover ground screw installation service covers the foundation and frame options. The installation and test programme can be discussed together, with their respective work and records clearly identified.

What your test report tells you

The agreed written report identifies the test points, loading method and measured response, together with the relevant test details and any commissioned load calculations. Make the intended recipient and use clear when enquiring, so the reporting scope can be established before testing.

Direct compression measurements come from applying a downward test load. Where an agreed method permits a compression assessment to be derived from other evidence, the calculation and basis must be identified as derived. Ask for the method your designer requires so the quotation and report provide the appropriate evidence.

Acceptance criteria belong to the project brief and responsible designer. They allow the recorded movement and loading to be assessed against a defined requirement. Test results can inform decisions about the foundation; the wider structural design, connections and any approval requirements need their own agreed responsibilities.

Installation torque information can be useful alongside other records. Its relationship to performance needs a justified project method; it is distinct from directly loading the screw upwards, downwards or sideways. If the requested evidence concerns resistance to twisting, ask specifically about specialist torsional testing and its reporting scope.

Arranging testing in Andover

Provide the full postcode and explain the site entrance if the work area is reached from a different road or through a managed gate. A contact who can arrange entry, show the selected screws and authorise use of the space helps us plan the visit.

Photos of the route and visible support heads are useful. Include steps, narrow approaches and the space around the proposed test points. We confirm the working area needed for the method and agree any preparation before a date is arranged. You can send these details as the enquiry progresses.

Tell us when the findings are needed and whether another contractor's work depends on them. Agree who will prepare the supports, who will receive the report and how any design decisions will be handled. This helps coordinate the test with the wider project.

Our Andover service overview explains the other foundation options if the project is still being planned. For work in another town, use the Hampshire guide or ask us about the actual site address.

Areas we cover around Andover

We welcome enquiries from Andover town centre, Millway, Harroway, Winton, St Mary's, Picket Twenty, Picket Piece, Andover Down, Walworth, East Anton, Augusta Park, The Chariots and Saxon Heights. Nearby places include Charlton, Enham Alamein, Smannell, Little London, Finkley and Woodhouse.

Contact us about Penton Mewsey, Penton Grafton, Weyhill, Clanville, Appleshaw, Ragged Appleshaw, Redenham, Fyfield, Kimpton, Thruxton, East Cholderton, Amport, Monxton, Abbotts Ann, Little Ann, Anna Valley, Upper Clatford, Red Rice and Goodworth Clatford.

We also discuss work in Hatherden, Little Hatherden, Wildhern, Charlton Down, Tangley, Hurstbourne Tarrant, Ibthorpe, Upton, St Mary Bourne, Stoke, Hurstbourne Priors, Longparish, Wherwell, Cottonworth, Fullerton, Chilbolton, Barton Stacey, Upper Bullington, Lower Bullington, Grateley, Quarley, Over Wallop and Nether Wallop.

SP10 and SP11 help locate Andover-area enquiries, with nearby SO20 addresses also welcome. Share the complete postcode so we can confirm the site and practical arrangements, including for a village not named here. See our Hampshire service guide for other towns.

Feedback on Craig’s earlier work

Feedback on Craig’s earlier groundwork and customer service.

"Craig and the team are absolutely fantastic. From courtesy, to standard of work, to tidiness — everything exceeded expectations. The job was arranged, booked and done extremely quickly and we are very happy with the results. Nothing was too much trouble, and communication was easy."
— Verified CustomerMyBuilder · SO · Cobble edge and gravel strip
"Craig and his crew were excellent from the first communication, quote, timing of work and quality of work. Highly recommended."
— Verified CustomerCheckatrade · BH20 · Garage base

Frequently asked questions

Practical information about commissioning a test and using the results.

Can you test ground screws installed by someone else?

We can consider them for standalone testing. Tell us what products were fitted, where they are and what needs to be established. Available installation information and photos help us assess the connection and setup. We confirm whether the proposed test can be carried out safely and provide the evidence required.

How do I know which direction needs testing?

It depends on the forces relevant to the foundation and the information the project needs. Pull-out, compression and lateral methods examine upward, downward and sideways loading respectively. Share a designer's request if you have one, or describe the purpose so the required brief can be clarified before a method is agreed.

Can a programme include more than one type of test?

Yes, the brief can include several methods or selected supports where the project calls for them. The test positions, order, loads and reporting need to be coordinated, including whether the programme could affect later tests or use of a support. We quote the combined work once those requirements are established.

When should trial screws be tested?

Arrange the discussion while the proposed foundation is being developed, allowing time for results to inform the design. The designer should establish what the trial locations and supports need to represent. Tell us about the main installation date so testing, reporting and the subsequent decision can be sequenced sensibly.

Who decides the test loads and acceptance criteria?

They should come from the responsible designer or agreed project specification. Required loads, loading stages, movements and assessment criteria need to relate to the intended use of the evidence. We establish the test and reporting scope around that brief before carrying out the work.

Can I enquire before I have a written test specification?

Yes. Explain why testing has been requested, the site location and what stage the project has reached. We can discuss the next information needed, including who will define the loads and interpret the results. Technical documents are helpful when available, rather than a condition of first contact.

What if the screw heads are beneath a frame or building?

Show us the arrangement as it stands, using photos of safely visible parts and any existing drawings. Access to the head, room for the loading setup and the loads already carried all matter. Discuss preparation with us before altering a connection; any exposure or temporary support needs a safe, agreed plan.

How much room is needed to carry out a test?

That depends on the method, loads and suitable setup at the selected support. Photos showing the surrounding space and route into the site help with the initial review. We confirm the practical working area and any preparation once the test requirements and available arrangements have been assessed.

What information does installation torque monitoring provide?

It records the turning resistance during screw installation. That can support the installation record and an appropriately justified assessment method. It is a separate service from directly applying and measuring a test load. Ask about it before installation so the required monitoring and record can be scoped; pricing is on application.

What is a specialist torsional test?

It applies an agreed twisting load and records the screw's response for the stated purpose. This is different from observing the turning resistance while a screw is driven into place. Share the requested test detail and product information so the specialist arrangement and report can be considered. Torsional testing is price on application.

What do you need to price a testing visit?

Start with the location, purpose and whether the screws are trial or existing supports. As the scope develops, the test methods, positions, loads, access, preparation and report requirements establish the work involved. Tell us about any required deadline and send the designer's instructions when available. At the same location on the same day, each additional compression test costs £320 extra, each additional pull, tensile or uplift test costs £160 extra, and each additional lateral test costs £155 extra. These fixed charges are for further tests of the same type; the first test of each type is priced separately.

What will the written report include?

We agree its contents before testing, including identification of the supports, the method and measured results. Any requested load calculations and their basis should be part of that reporting scope. Tell us who needs to use the document so the information required for their assessment can be established in advance.

How do direct and derived compression results differ?

A direct result records the response while a downward load is applied to the screw. A derived compression assessment is calculated from other evidence using an agreed applicable method, and must be identified on that basis. Confirm which your designer requires so the proposed test and report match the purpose.

How are the results used in the foundation design?

The responsible designer considers the reported evidence against the project loads and agreed criteria, alongside the support layout, connections and other relevant information. Confirm who will make that assessment and any subsequent design decision. We establish the testing and reporting deliverables clearly so they fit that process.

What happens next

Start a testing enquiry, call 01202 039753 or message Craig on WhatsApp. We discuss the question, confirm the method and practical requirements, then quote the agreed testing and report. Attendance follows once the scope and safe site arrangements are in place.