
Ground screw testing in Brighton and Hove
JustBases offers standalone ground screw testing in Brighton and Hove for trial supports and suitable existing foundations. You can ask about screws supplied or installed by another company. We agree the loading, safe site arrangements and report around the evidence your project needs.
Ground screw tests we offer
A physical test provides a record of how a selected screw responds when an agreed force is applied. That information can support a design decision, inform trial work or help review an existing foundation. The purpose of the enquiry determines which loading direction and measurements are useful.
We welcome enquiries from owners, suppliers, installers and project teams. If you have been asked for a particular test, share the request when available. You can also describe the building and the question to be resolved before a formal testing brief is ready.
Pull-out testing
Loading pulls upwards on the screw to investigate its response to uplift. The agreed forces and measured behaviour provide evidence for the identified support and test arrangement.
Learn more: Pull-out testingCompression testing
A direct test presses down on the installed screw and records its movement under the specified loading. It provides measured downward-load evidence for the project team to assess against its requirements.
Learn more: Compression testingLateral testing
A sideways test investigates lateral movement. We discuss the force direction, connection and working space needed, then agree a suitable arrangement for the requested evidence.
Learn more: Lateral testingGround screw testing prices in Brighton and Hove
The guide shows starting fees for the physical loading methods. A written quote follows the actual programme: test positions, required loading and readings, access, preparation, attendance and reporting. Tell us about a deadline for the findings so it can be considered with the visit arrangements.
Installation torque monitoring and specialist torsional testing are separate services, each price on application. Monitoring measures turning resistance during installation. A torsional test applies an agreed twisting load to examine response. We establish which service is required and what records it should produce before pricing the work.
Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.
- Pull test (tensile or uplift test)
- From £522
- Load test (compression test)
- From £1,044
- Lateral test (sideways load)
- From £512
- Installation torque monitoring
- Price on application
- Specialist torsional load test
- Price on application
Each additional test
Each extra charge applies to an additional test of the same type, at the same location on the same day. The first test of each type is priced separately.
- Pull test (tensile or uplift test)
- £160 extra
- Load test (compression test)
- £320 extra
- Lateral test (sideways load)
- £155 extra
No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.
Ask about a ground screw test
Send the postcode and the reason for testing, with a brief description of whether screws are proposed, exposed or already supporting a structure. Documents and photographs are welcome if you have them, but an outline is enough to enquire. Call 01202 039753 or message Craig on WhatsApp to talk through the request.
Request your free quote
Explain why testing is needed and where the screws are. We can discuss the available information together.
Your enquiry
Ground screw testing in Brighton & Hove
How ground screw testing works
The visit is planned to produce the agreed information safely. We discuss the test requirements and practical preparation before confirming attendance, with reporting and interpretation responsibilities established for the commission.
Agree the test requirements
We identify the supports to be tested, force directions and required measurements. Loading sequence, test loads and acceptance criteria are agreed with the responsible designer where applicable. We also establish the report recipient and any required calculations or specific records.
Prepare the site and connection safely
The proposed loading needs a suitable attachment and a safe means of providing the opposing force. Access to the position, available working room and existing structural loads are assessed. Any preparation and the party responsible for it are confirmed before the visit.
Carry out the test and supply the report
The agreed loading is applied and the relevant response recorded. We supply the test results, a written report and the load calculations included in the agreed scope. The designer or project team can then review those findings against the requirements for the foundation.
Testing existing screws and trial installations
For an existing installation, tell us the screw details you know, their positions and what is attached above them. Records from the original installer can help identify the arrangement. If paperwork is limited, begin with a description and safely visible photos so we can discuss the assessment needed.
A floor or frame over the heads affects the test connection and preparation. Leave structural fixings intact during the enquiry. Any opening-up, temporary support or reinstatement must be planned with those responsible for the structure, taking account of the loads already carried and the force proposed during testing.
Trial supports can be tested while a new foundation scheme is being developed. The designer should identify what the trial needs to establish and how the selected positions relate to the proposed work. Schedule time to review the findings before the remaining installation or building assembly is committed.
What your test report tells you
The written report identifies the agreed test and presents the relevant recorded loading and response. Its context includes the tested support, position and arrangement. Tell us in advance if your engineer or another recipient needs a particular format, set of records or calculation so the deliverables can be confirmed.
A calculated compression capacity based on pull-test data needs an applicable agreed method and is identified as derived information. A direct compression test physically applies a downward force and records the response. Installation torque monitoring is recorded separately as information obtained during installation.
The responsible designer assesses results against the project's criteria and wider support requirements, including the frame and connections. The report contributes evidence within the agreed test scope. Whole-building approval or an engineer-signed document has its own requirements and should be raised when the work is commissioned.
Arranging testing in Brighton and Hove
Provide the full site address and the entrance that will be available. Describe the route from unloading to the supports, including gates, passages, steps and any restrictions on entry. For a shared garden or managed property, identify the contact who can agree access and the working area.
A test setup needs space around the selected screw as well as a route to it. We discuss nearby walls, buildings or retained features and the safe connection before agreeing the visit. Any preparation by another installer should be coordinated with that arrangement, with the test positions ready for the agreed attendance.
If new supports are also required, our Brighton and Hove installation page explains that service. You can explore other methods in the city overview and the local coverage in our East Sussex guide. Testing can remain a separate commission.
Areas we cover around Brighton and Hove
Enquire from Brighton centre, Hove, Portslade, Portslade Village, Mile Oak, Aldrington, Hangleton, Knoll, West Blatchington, West Hove, Wish, Westbourne, Poets' Corner, Hove Park, Goldsmid, Brunswick, Adelaide, Regency, Seven Dials, West Hill and North Laine.
Other city neighbourhoods include Preston Park, Withdean, Westdene, Patcham, Hollingbury, Hollingdean, Fiveways, Round Hill, Hanover, Elm Grove, Queen's Park, Kemptown, Bevendean, Moulsecoomb, Coldean, Stanmer, Whitehawk, Brighton Marina, Black Rock, Roedean, Ovingdean, Woodingdean, Rottingdean and West Saltdean.
For a surrounding address in Falmer, Saddlescombe, Newtimber, Poynings, Pyecombe, Fulking, Clayton, Keymer, Hassocks, Ditchling, Kingston near Lewes, Iford, Swanborough, East Saltdean, Telscombe Cliffs, Telscombe Village, Peacehaven, Fishersgate, Southwick or Shoreham-by-Sea, ask us to check availability and travel for the particular job.
BN1, BN2, BN3 and BN41 are useful city postcode districts. We need the full postcode and address to confirm the work location and arrangements, including for a nearby village not listed. Our East Sussex guide brings together the Brighton and Hove services.
Feedback on Craig’s earlier work
Feedback on Craig’s earlier groundwork and customer service.
"Craig and the team are absolutely fantastic. From courtesy, to standard of work, to tidiness — everything exceeded expectations. The job was arranged, booked and done extremely quickly and we are very happy with the results. Nothing was too much trouble, and communication was easy."
"Craig and his crew were excellent from the first communication, quote, timing of work and quality of work. Highly recommended."
Frequently asked questions
Answers to help you commission a useful test and prepare for the visit.
Can you test screws supplied and fitted by another company?
Yes, you can enquire about that installation as a standalone testing commission. We review the available product information, existing connections and practical access before agreeing a test. Tell us what the foundation is intended to support and why evidence is required, with further records supplied when available.
How do the three physical loading methods differ?
Pull-out testing acts upwards, compression testing acts downwards and lateral testing acts sideways. Each measures behaviour under the specified direction of force. The project's loading requirements determine which evidence is needed, and we agree the relevant method or programme with the responsible team before booking attendance.
When should trial screws be tested?
Arrange the discussion early enough for the results to inform the foundation decision. A trial needs a purpose, selected positions and agreed measurements, followed by time for review. That can allow the designer to consider the findings before the complete support arrangement and subsequent building work proceed.
Can I begin without a finished testing specification?
Yes. Explain the site, building and reason you are considering testing. We can identify what information and project involvement are needed next. The loads, method and reporting requirements must be confirmed before the test, but a completed engineering brief is not required for your first enquiry.
Who establishes the required loads and acceptance criteria?
They are agreed for the project, with the responsible designer involved where applicable. The brief should identify direction, sequence and the response to be assessed so the test has a clear purpose. Those requirements also guide the later interpretation of the reported results.
What does installation torque monitoring record?
It records resistance to turning while a screw is being installed. Discuss the required monitoring in advance so the installation stage and records can be arranged. It is a price-on-application service, with the information interpreted for the actual screw and project alongside any other evidence required.
What happens in a specialist torsional test?
An agreed twisting load is applied to investigate the screw's response. The requirement, connection and measurements are established before the work is priced. This is distinct from monitoring during installation and from the three direct loading directions described above. Specialist torsional testing is price on application.
Can a foundation be tested when a frame is already attached?
The existing connection and structural loads need assessment alongside the proposed test arrangement. Share safely visible details and describe what is above the supports. Keep the structure intact while enquiring; any access work, temporary support or alteration must be agreed with the responsible parties before testing is confirmed.
What if I only have limited information about the existing screws?
Tell us what you know and why the test is needed. Original invoices, installation notes or the supplier's details may help identify the product later. We can discuss the assessment and any further information required to establish a suitable connection and useful testing scope.
What room is needed for the test equipment?
That depends on the force, connection and reaction arrangement agreed for the test. We assess working space around the selected support and the route for equipment. Photos showing nearby structures and restrictions help that discussion. Access permissions and any preparation need to be settled before attendance.
What can affect the price of the testing programme?
The number of positions, loading directions, required readings and reporting all influence the commission. Connections, preparation and access can change the practical work involved too. Your written quotation defines the agreed visit and deliverables, so you can coordinate other contractors and understand what the price covers. At the same location on the same day, each additional compression test costs £320 extra, each additional pull, tensile or uplift test costs £160 extra, and each additional lateral test costs £155 extra. These fixed charges are for further tests of the same type; the first test of each type is priced separately.
What will I receive after the test?
We provide recorded results, a written test report and the load calculations agreed for the project. The report should identify the test context so the recipient can understand the findings. Discuss any particular document format, additional record or sign-off requirement before commissioning, allowing the reporting scope to be confirmed.
How do compression calculations relate to a direct downward test?
An applicable agreed calculation can derive compression information from pull-test results and relevant project details. It is identified as calculated evidence. A direct compression test instead applies downward load and records the physical response. Confirm which evidence the recipient requires when the test scope is discussed.
How are the findings used before the project continues?
The responsible designer or project team reviews the results against the agreed criteria and complete foundation requirements. A test report supplies evidence for that review; approval of the structure, connections and any authority submission involves the wider design. Plan time for that decision before the next construction stage.
What happens next
Send a testing enquiry, call 01202 039753 or message Craig on WhatsApp. We establish the test and report requirements, confirm a written price and agree the site arrangements before arranging the work.
