
Ground screw testing in Fareham
JustBases offers ground screw testing in Fareham as a separate service for homeowners and project teams. We can test suitable trial supports or existing screws, including another installer's foundation, using the agreed pull, compression or lateral method. You receive recorded findings for the foundation assessment without needing to purchase an installation.
Test the required loading direction
Testing provides information about the response of an installed screw when a defined force is applied. The useful test follows the foundation requirement: the load direction, its sequence and the movement to be measured need to be chosen for that assessment.
We discuss the practical work alongside the requirement set by the responsible designer or other appointed assessor. They establish the loads and acceptance criteria, while the agreed programme identifies the supports to be tested and the evidence to supply.
Uplift testing
Pull testing applies force upwards. It examines resistance to lifting and records the screw's response through the specified loading. The findings are identified to the tested support and arrangement for consideration in the uplift assessment.
Learn more: Uplift testingCompression testing
A direct compression test applies downward loading and measures the resulting movement. A compression value calculated using pull-test evidence has a different basis; where an applicable method is agreed, the calculation is identified separately in the results.
Learn more: Compression testingLateral testing
This test applies sideways force. The required direction, loading height and connection form part of the setup, so the measured lateral response answers the check that has been specified for the foundation.
Learn more: Lateral testingGuide prices for a Fareham testing programme
Use the testing guide to discuss a budget, then ask us to quote the actual programme. The quotation defines the chosen tests, positions and attendance, including the agreed site arrangement, reporting and travel. Particular calculations or requested records need to be identified while that scope is settled.
Two torque services are available on their own agreed terms, both priced on application. Installation monitoring records turning resistance during driving. Specialist torsional testing examines the response to a separately applied twisting load. Booking a physical load test does not automatically include either service.
Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.
- Pull test (tensile or uplift test)
- From £496
- Load test (compression test)
- From £992
- Lateral test (sideways load)
- From £486
- Installation torque monitoring
- Price on application
- Specialist torsional load test
- Price on application
Each additional test
Each extra charge applies to an additional test of the same type, at the same location on the same day. The first test of each type is priced separately.
- Pull test (tensile or uplift test)
- £160 extra
- Load test (compression test)
- £320 extra
- Lateral test (sideways load)
- £155 extra
No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.
Discuss your foundation check
The reason for testing and the full postcode are enough for the first discussion. Say what is already on site and whether the supports carry a frame or building. We can then explain the further information and decisions needed to price suitable work.
Use this form, send Craig a WhatsApp message or call 01202 039753. Available screw records, photographs or a designer's request can be shared now or later; they are not a complete-pack requirement before contact.
Request your free quote
Give us your contact details and a short description of the testing you need. You can ask before the technical requirements are complete.
Your enquiry
Ground screw testing in Fareham
From the request to the written findings
We turn the assessment request into a defined visit, with its safe arrangement and reporting agreed beforehand. Preparation by other people is coordinated with that scope rather than left until the test date.
Set the test brief
Confirm the foundation question, screw information and proposed locations. The responsible assessor defines the loading and criteria, including what response is to be recorded and when the test should stop.
Arrange the test position
Review the available connection and the area needed to apply and resist the load. Settle access, any enabling work and the competent support arrangements for an existing structure before attendance.
Apply and record the loading
Carry out the agreed test method and loading stages at the selected positions. Record the applied forces and response, together with relevant observations about the test arrangement and conditions.
Provide the agreed evidence
Supply the written test record and any project calculations included in the scope. The results are then available to the designer or other appointed assessor for the foundation decision.
Suitable existing foundations and trial supports
The useful starting point for an existing foundation is the question being asked about it. Pass on the requested check and explain what the screws currently support. We can discuss whether suitable loading evidence can be obtained, including where another installer supplied the foundation, and what the assessor needs to know about the product.
Once the required supports are identified, we assess a suitable test connection and loading arrangement. A frame or floor may need preparation by the people responsible for it. Keep its fixings intact while the request is assessed; any exposure, unloading, temporary support and reinstatement must be planned and assigned before testing.
For a new proposal, a trial is a separately planned part of the design work. Its screw and position should be selected to answer the designer's question. Confirm who installs that trial and how the findings will be reviewed before ordering dependent foundation work.
What the written report covers
Agree the required document with the testing programme. The written report provides the recorded findings for the identified test points, with the methods, loading and response made clear. Project load calculations are supplied where included in the scope. This lets the recipient follow what was examined and use the information for the commissioned assessment.
Where a report includes calculated compression capacity, its method and assumptions must be stated and applicable to the project. A derived value is distinguished from a directly measured downward-load response. The responsible assessor decides whether the evidence meets the foundation requirements; the testing report is not a full structural design, whole-building certificate or automatic building-control approval.
Getting ready for testing around Fareham
Use the quotation discussion to bring the site arrangements and assessment together. Tell us about any planned work that depends on the result, then agree when the chosen supports will be ready to test. This leaves time for the findings to be considered as well as for the visit itself.
A named project contact can coordinate the preparation and access once these have been agreed. Give the full address and explain any continuing activity around the working area, including an occupied building. We confirm the space and safe arrangements for the selected method before attendance; photographs can help explain the site during that discussion.
For a new foundation, Fareham ground screw installation sets out the separate installation service. The Fareham base page explains other base options, and our Hampshire service areas help you check other locations. You can book testing separately.
Fareham and nearby testing areas
We welcome testing requests in Fareham and the nearby Solent communities below. Please send the full site postcode and purpose so the test, access and travel can be agreed for that address.
PO14, PO15, PO16 and PO17 provide local district references, with nearby PO12, PO13, PO6, SO31 and SO32 sites also considered. Ask about another adjoining address if needed; the quotation confirms the actual attendance and work.
- Fareham town and adjoining areas: town centre, Fareham Park, Fort Fareham, Broadlaw, Uplands, Fareham Common, Catisfield, Wallington, Downend, Cams, Funtley, Welborne, Knowle and Old Knowle.
- Portchester and nearby places: Portchester, Wicor, Portsdown Hill, South Boarhunt, North Boarhunt and Southwick; adjoining Portsmouth enquiries include Port Solent, Paulsgrove, Wymering, Cosham, Drayton and Farlington.
- Titchfield and the Stubbington area: Titchfield, Titchfield Common, Titchfield Park, Segensworth, Stubbington, Crofton, Hill Head, Peel Common, Chilling and Brownwich.
- Locks Heath and the Hamble-side communities: Locks Heath, Park Gate, Sarisbury, Sarisbury Green, Swanwick, Lower Swanwick, Burridge, Warsash and Hook.
- Whiteley and adjoining villages: Whiteley, North Whiteley, Curbridge, Curdridge, Wickham, Shedfield, Shirrell Heath, Waltham Chase and Swanmore.
- Nearby Solent communities: Lee-on-the-Solent, Bridgemary, Rowner, Holbrook, Brockhurst, Elson, Hardway, Alverstoke and Gosport. Southampton and Eastleigh projects can also be discussed.
Feedback on Craig’s earlier work
Feedback on Craig’s earlier groundwork and customer service.
"Craig and the team are absolutely fantastic. From courtesy, to standard of work, to tidiness — everything exceeded expectations. The job was arranged, booked and done extremely quickly and we are very happy with the results. Nothing was too much trouble, and communication was easy."
"Craig and his crew were excellent from the first communication, quote, timing of work and quality of work. Highly recommended."
Testing questions answered
These answers explain how to arrange suitable evidence and what the agreed test does for the project.
Who can ask you to carry out ground screw testing?
We welcome requests from property owners, building suppliers, installers and other project teams. Testing is available independently of installation, including suitable screws fitted by another company. Tell us what the evidence will be used for so the right requirement and practical arrangement can be established.
What if my designer has already requested a particular test?
Send the request when convenient. It helps identify the force direction, required loads, criteria and reporting. We review the practical arrangement for that work before quoting. If anything still needs clarification, it can be settled with the responsible project contact before attendance.
Can testing take place before all the foundation screws are installed?
Yes, a suitable trial can supply information while the design remains under consideration. The designer establishes what it needs to show and which screw and position to use. Coordinate the trial installation and allow time to assess the findings before the remaining foundation work depends on them.
What is physically measured in a direct compression test?
The test applies force downwards and records the screw's response as required by the brief, including movement under that loading. It concerns the identified screw and arrangement. The written scope should say that direct compression measurements are required where that is the evidence needed.
Why is the lateral test connection part of the brief?
The way the sideways force reaches the screw affects the behaviour being examined. The connection, loading direction and application height therefore need to suit the required check. Those details are agreed with the test requirements and assessed for a safe practical arrangement.
Can an installed frame stay attached during testing?
That depends on the intended test and the existing structural arrangement. Its loads, stability and the available connection need assessment before the work is agreed. Keep the structure intact for the enquiry; any disconnection, unloading or temporary support must have a competent plan and clear responsibility.
How should the test positions be identified?
A drawing or simple marked layout can help show which supports are being discussed. Use any existing installation references if available, and explain what each position supports. The agreed programme and written record need to identify the tested locations so the assessor can relate the findings to the foundation.
Can I enquire if the original installation records are missing?
Yes. Explain what you know and why a test is being considered. We discuss the information needed for the proposed method and for the assessor to use the results. Further identification may be necessary, but missing paperwork does not prevent the first conversation.
When do I need to arrange installation torque monitoring?
Arrange it as part of planning the installation if the turning-resistance record is required. The measurement is taken during driving, so a later physical test does not reproduce that installation history. Monitoring is a separately specified service, priced on application.
What does specialist torsional testing add?
It investigates response to an applied twisting action under an agreed test method. That is different from recording the resistance encountered during installation and from loading vertically or sideways. Share the actual requirement so it can be assessed and quoted separately; specialist torsional testing is price on application.
Can an uplift result be used to calculate compression capacity?
Only through an agreed assessment method that applies to the screw and relevant project information. The calculation needs its evidence and assumptions identified, and its result must be described as derived. A directly applied downward test remains a distinct service when that measurement is required.
Can the report be prepared for the person assessing my foundation?
Tell us who needs it and what they have requested when commissioning the tests. We agree the test record and any calculation or formatting requirement within the quotation. The recipient can then consider that defined evidence; further professional review or certification needs to have its own agreed responsibility.
Does a completed test settle the approval of the building?
It supplies evidence about the work within the test scope. The responsible designer and any relevant approval body still need to assess the complete proposal. An engineer-signed structural assessment, whole-building certificate or building-control acceptance is not automatically provided by the test or its report.
What is the difference between making an enquiry and booking a visit?
You can enquire with the reason for testing and postcode while the project is still being clarified. Before a visit is booked, we agree what will be tested, the loading and criteria, the safe setup and preparation, and the reporting and price. That lets everyone know what the attendance is intended to deliver.
What does each additional ground screw test cost?
At the same location on the same day, each additional compression test costs £320 extra, each additional pull, tensile or uplift test costs £160 extra, and each additional lateral test costs £155 extra. These fixed charges are for further tests of the same type. The first test of each type is priced separately, using the starting price for your location. The extra-test charges stay the same in every location.
Request a Fareham test quote
Tell us the testing purpose and postcode. Craig can discuss the requested work and the next information needed, then confirm a written scope and price before the visit.
