JustBases offers standalone ground screw testing in Petersfield, including suitable trial supports and existing screws installed by other companies. We provide pull, direct compression and lateral testing, with recorded results, a written test report and the calculations agreed for your project.
Physical tests for three load directions
A physical test applies an agreed force and measures how the selected screw responds. The required force direction follows the foundation question: lifting, downward bearing or sideways resistance. We discuss the purpose and practical setup before confirming the testing programme.
These are three distinct physical methods. The project may need one or a combination, as specified by the person responsible for assessing the foundation.
Upward pull
A controlled upward load is applied to examine response to uplift. The recorded findings relate to the selected screw and conditions of that test, providing evidence for the specified upward-loading requirement.
Learn more: Upward pullDownward compression
The screw is physically loaded downwards and movement is measured under that loading. This gives direct compression evidence. A compression value obtained through calculation is identified separately from this measured downward response.
Learn more: Downward compressionSideways lateral test
The load acts horizontally in the direction agreed for the test. We record the response under that action, with the connection and loading arrangement selected for the lateral requirement.
Learn more: Sideways lateral testTesting prices and the agreed work
The price guides identify the three physical test services. A written quote defines the programme you are commissioning: the required methods and points, practical site arrangements, attendance and the evidence to be supplied. Say whether testing is needed before a foundation decision or to examine fitted supports.
Installation torque monitoring is POA. It records turning resistance while the screw is driven, so it must be arranged for that stage. Specialist torsional load testing is also POA but applies a separate twisting action; it is not the installation record. Both require their own agreed scope and are not automatically included with other testing or foundation work.
Compression calculations from pull-test evidence can be commissioned where a suitable method applies and is agreed for the project. The calculated value and its assumptions are kept distinct from a direct physical compression result. Tell us if the assessment specifically requires measured downward response.
Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.
- Pull test (tensile or uplift test)
- From £506
- Load test (compression test)
- From £1,012
- Lateral test (sideways load)
- From £496
- Installation torque monitoring
- Price on application
- Specialist torsional load test
- Price on application
Each additional test
Each extra charge applies to an additional test of the same type, at the same location on the same day. The first test of each type is priced separately.
- Pull test (tensile or uplift test)
- £160 extra
- Load test (compression test)
- £320 extra
- Lateral test (sideways load)
- £155 extra
No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.
Ask about the evidence you need
Start with the site postcode and what prompted the request. You might be arranging tests for your own building or helping an installer or designer obtain evidence. Craig can discuss the service and identify the next information needed.
If you have an email asking for a test, a foundation drawing or previous records, send them when convenient. A complete test schedule is agreed before attendance, but it is not a condition of asking for help.
Request your free quote
Give us your contact details and a short description of the testing you need. You can ask before the technical requirements are complete.
Your enquiry
Ground screw testing in Petersfield
What happens when you commission testing
Testing is planned so the resulting information can be used for the intended assessment. The quotation and site arrangements are confirmed before the work proceeds.
Establish the purpose
We discuss the foundation, the decision needing evidence and the stage the work has reached. This identifies the relevant project contact and the requirements still to be confirmed.
Confirm method and preparation
The loading directions, selected supports and assessment criteria are established with the responsible team. We agree a safe way to carry out the tests and allocate any site preparation, reporting and calculation work in the scope.
Test the selected supports
The agreed loads are applied using the planned setup and the required response is recorded. The record reflects the work actually completed, including any restriction that affects use of the results.
Provide the agreed evidence
We supply the recorded results, written report and commissioned load calculations. The responsible assessor reviews that information for the foundation decision and any subsequent work.
Trial screws and installed foundations
You can commission a trial without placing an order for the full foundation. The person developing the design confirms what the trial needs to establish. We agree who will supply and install the trial support, and when it will be ready for testing.
A connection carrying a building must remain intact during the enquiry. Any opening-up, unloading, disconnection or temporary support needed for a test requires competent planning and a clear responsibility. Testing is arranged once the safe preparation for that particular foundation has been agreed.
Using the results for the foundation decision
The written findings give the project team a record of the testing commissioned and the response obtained. Use them with the original request: the person assessing the foundation needs to decide whether the observed behaviour meets the requirements they set and what work can follow.
Keep the report with the foundation information it concerns. If the proposed building or supporting arrangement changes, ask the responsible assessor to review whether the evidence still answers the revised requirement. Findings at selected points need to be considered in that wider foundation assessment.
The test report is not approval of the whole structure. It does not replace the design of the building, frame and connections or grant Building Control acceptance. Agree any additional professional input the project needs separately from the testing service.
Arranging the test at your property
Once the quotation covers the testing you need, agree the visit with us and the person arranging the site preparation. Let us know who will provide entry and confirm that the selected supports will be ready. If the requirement changes before attendance, share the revised request so we can check the work and price with you.
Testing can remain a separate order. If foundations also need to be installed, see Petersfield ground screw installation. Our Petersfield base services explain the other groundwork options, and you can check nearby Hampshire service areas.
Testing around Petersfield and nearby villages
Enquire with the full site postcode for testing in the places below. GU31 and GU32 are useful around Petersfield, with GU33 around Liss, GU34 towards Privett and PO8 towards Clanfield. We agree the travel, access and test setup for the actual property and requested work.
Petersfield
The town centre and the Bell Hill, Woodbury Avenue, Tilmore, Ramshill, Heath, Causeway and Broadway Park areas.
Sheet, Steep and Stroud
Sheet, Steep, Steep Marsh and Stroud, including enquiries from the surrounding lanes and properties.
The Meon-side villages
Langrish, Ramsdean, Bordean and East Meon; also West Meon, which is in Winchester’s district rather than East Hampshire.
Froxfield and neighbouring places
Froxfield, Froxfield Green, High Cross, Privett, Colemore and Priors Dean.
Liss and nearby villages
Liss, West Liss, Liss Forest and Hill Brow; Greatham, Hawkley and Empshott.
Buriton and the villages beyond
Buriton, Nursted, Weston and Ditcham, together with Chalton and Clanfield. Use the full address for hamlets close to the county boundary.
Towards Rogate and Harting
Durleighmarsh, Rogate, Rake, South Harting, East Harting, West Harting and Nyewood; Ryefields, Foxcombe, Hucksholt and Eckensfield. Rogate and Harting are in West Sussex, while Rake straddles the Hampshire border, so we use the property address when agreeing the work.
Feedback on Craig’s earlier work
Feedback on Craig’s earlier groundwork and customer service.
"Craig and the team are absolutely fantastic. From courtesy, to standard of work, to tidiness — everything exceeded expectations. The job was arranged, booked and done extremely quickly and we are very happy with the results. Nothing was too much trouble, and communication was easy."
"Craig and his crew were excellent from the first communication, quote, timing of work and quality of work. Highly recommended."
Petersfield testing questions
If you have been asked for evidence but are unsure what to book, send us the question you received. The detailed programme can be clarified after the first enquiry.
What if I have only been asked for a ground screw test without more detail?
Send that request and explain the building or foundation it concerns. We can discuss which measurements may be relevant and who needs to confirm them. The responsible designer or assessor establishes the detailed loading and criteria before the work is booked.
Can another installer arrange testing through JustBases?
Yes. Installers and other project teams can commission testing as a separate service, including for suitable third-party screws. Tell us who is responsible for the foundation and the evidence required. The quotation identifies the test work and any preparation or installation provided elsewhere.
Can a programme include both uplift and compression tests?
It can be discussed where the assessment needs evidence in both directions. Pull testing loads upwards; direct compression physically loads downwards. We establish which points and arrangements are appropriate and quote the agreed work, rather than treating one direction as a substitute for the other.
What should the designer specify for a lateral test?
The sideways direction, relevant loading and assessment criteria need to be clear. The connection arrangement and where the force is applied also matter to the behaviour being examined. We review a safe practical setup for that requirement before attendance.
Which existing documents are useful when developing the quote?
A support layout, screw product details, installation records and the request for testing can help establish the work. Send what you already have without delaying the first enquiry. We explain whether more information is needed to arrange the test or make its findings useful to the assessor.
Can testing be planned before the final screw installation is ordered?
Yes, a trial can be commissioned to inform the proposed foundation. The designer needs to define what decision it should support and the relevant trial arrangement. Allow for the findings to be considered before committing later work that depends on them.
Who sets the loading and the limits for the test?
The responsible assessor defines the requirements to be examined and the criteria for judging the response. These are agreed with the test programme and safe method. If the request is still incomplete, we clarify those matters before testing.
Can you test when a floor already covers the screw heads?
That needs a review of the existing structure and how the chosen point could be reached and loaded safely. Show what is visible and tell us what the screws support. Any opening or structural preparation must be competently planned and allocated; do not expose or release a loaded connection for the initial enquiry.
Can the building contractor proceed while the results are being assessed?
The person responsible for the construction and foundation decision must confirm which work can proceed. Tell us about the programme when arranging testing so the visit and reporting can be coordinated. Completion of a test alone does not authorise loading or concealment of the supports.
Are torque monitoring and torsional testing the same service?
No. Monitoring captures turning resistance as the screw is installed and must be arranged for that operation. A specialist torsional test applies an agreed twisting action as a separate test. Each is POA and separately commissioned; neither is automatically included with a physical pull, compression or lateral test.
Can compression capacity be calculated without a direct downward test?
An applicable agreed calculation method may derive compression evidence from pull results and the required project information. Its assumptions and basis need to be identified for the assessment. It is reported as a calculated value; if measured downward behaviour is required, commission direct compression testing.
Does the test report include a certificate for the finished building?
The service supplies the recorded findings and written report, with calculations within the agreed scope. Whole-building certification and statutory acceptance are wider matters for the responsible professionals and approval process. Any additional review or certification must have its own clearly agreed responsibility.
How do test quantities and visits affect a quotation?
The programme needs to identify the supports, methods and attendances being supplied, together with reporting and calculations. Different setups or stages may change the practical work. Tell us the complete requirement so the quote describes what is included and any separately arranged preparation.
Can installation and testing be discussed in the same enquiry?
Yes. Explain both the foundation you need and why testing is being considered, using the site postcode. We can discuss how the stages fit together, while identifying the installation, trial preparation, testing and evidence as the relevant parts of the written scope.
What does each additional ground screw test cost?
At the same location on the same day, each additional compression test costs £320 extra, each additional pull, tensile or uplift test costs £160 extra, and each additional lateral test costs £155 extra. These fixed charges are for further tests of the same type. The first test of each type is priced separately, using the starting price for your location. The extra-test charges stay the same in every location.
Contact Craig about testing
Call 01202 039753, use WhatsApp or the form above with the postcode and testing purpose. Craig can explain how to develop the enquiry into an agreed scope and written price.
You can contact us for a proposed foundation or suitable existing screws, including another installer’s work. Drawings and previous records are welcome when available, not required for the first conversation.