Ground screw testing in Taunton
JustBases offers standalone ground screw testing in Taunton, from suitable trial screws to accessible existing foundations installed by other contractors. Pull, compression and lateral tests provide evidence of the response under the agreed loading, with recorded results and a written report for the project assessment.
Pull, compression and lateral tests
Testing helps answer a defined foundation question by measuring how a selected screw behaves under load. The useful record connects the force applied with the resulting movement, using a method and loading sequence appropriate to the assessment.
Uplift, downward and sideways forces need their own consideration. Your responsible designer or appointed assessor specifies the relevant test requirements and criteria, and reviews how the results apply to the proposed foundation.
Pull testing
Upward loading examines the screw's resistance to lifting. The agreed test measures its response as the uplift load is applied, providing evidence at the identified screw and location.
Learn more: Pull testingCompression testing
A direct compression test examines behaviour while the load acts downwards. Load and movement measurements help the assessor consider the required vertical support; an agreed calculated assessment is recorded on its separate basis.
Learn more: Compression testingLateral testing
A lateral test looks at response to a sideways force. The specified loading height, direction and connection arrangement matter to the measurement, so they are agreed with the purpose of the check.
Learn more: Lateral testingTesting prices and the agreed visit
The guide sets out the main test options. We provide a written price after establishing the test positions, loading directions and sequence, access arrangements and report requirements. Mention any contractor or delivery programme the testing needs to fit.
Installation torque monitoring and specialist torsional testing are both priced on application. Monitoring captures turning resistance as the screw is driven; a torsional test separately examines behaviour under an applied twisting load. They are separately agreed services and are not automatically bundled with the physical load tests.
Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.
- Pull test (tensile or uplift test)
- From £519
- Load test (compression test)
- From £1,037
- Lateral test (sideways load)
- From £508
- Installation torque monitoring
- Price on application
- Specialist torsional load test
- Price on application
Each additional test
Each extra charge applies to an additional test of the same type, at the same location on the same day. The first test of each type is priced separately.
- Pull test (tensile or uplift test)
- £160 extra
- Load test (compression test)
- £320 extra
- Lateral test (sideways load)
- £155 extra
No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.
Enquire about the evidence you need
A first enquiry can simply give the purpose of the test and postcode. If you have screw details, photographs or a request from your designer, add them when convenient. Call 01202 039753 or use the form and WhatsApp options to begin.
Request your free quote
Give us your contact details and a short description of the testing you need. You can ask before the technical requirements are complete.
Your enquiry
Ground screw testing in Taunton
From a test request to recorded results
We establish the requirements before attendance so the work can be carried out safely and produce the intended evidence. Agreeing the test and reporting scope also helps the other people on the project plan their next actions.
Establish the test requirement
We discuss the foundation's stage and the question being investigated. The appropriate project assessor defines the required loads, directions, measurements, test locations and acceptance criteria.
Agree the safe site arrangement
Access to the relevant screw and the space for the loading arrangement are considered. Any connected structure, service or enabling work is addressed before the visit is agreed.
Apply the specified loading
The agreed loading sequence is carried out at the selected positions. The response is recorded alongside the applied loads, with observations that are relevant to interpreting the measurements.
Supply the record for assessment
Results are issued in the agreed written report, identifying the tested positions and method. The designer or appointed assessor uses that record to review the foundation and any further work required.
Choosing a programme for trial or existing screws
An existing installation can be considered even when another contractor fitted it. Start by explaining why evidence is needed now: for a proposed building, a change to the project or a request from the person assessing the foundation. The screw details and a layout help establish what can be examined and whether the planned test will answer that question.
For a foundation still being developed, agree who will provide and fit the trial screws as part of planning the programme. Their specification and locations need to suit the assessment. If a trial screw is intended to become a permanent support, its suitability after testing is a decision for the responsible designer, not an automatic part of booking the visit.
The programme identifies the individual positions to be tested and the access each requires. Where a building already rests on the screws, preparation may involve more than clearing a route: the connected structure must remain safely supported. Any necessary exposure, unloading or temporary support is planned with competent people before attendance.
Reading the loading and movement together
The response under load is the useful evidence. Read the recorded force alongside the movement at that stage of the test, with the loading sequence and observations in view. The project's assessor compares those measurements with the agreed requirements; that is what allows a finding to inform a foundation decision.
The report identifies where and how the work was carried out so the measurements can be traced to the tested screws. It should also make clear any difference between the planned programme and the work actually completed. Its conclusions relate to that evidence and scope; separate design checks and any required approval remain necessary for the building.
A compression figure obtained by calculation has a different basis from movement measured during downward loading. Where an applicable calculation is agreed, the report identifies the supporting test evidence, method and assumptions. Tell us if the assessment requires direct compression measurements so the commissioned work supplies that evidence.
Preparing for a Taunton testing visit
Give us the actual site location and describe how the relevant screw positions are reached. Gates, steps, overhead restrictions, occupied areas and nearby work can affect the arrangements. The required working space and preparation are confirmed once the test method is understood.
Let us know who needs the report and any intended decision date. If trial screws or other site preparation are being arranged by another contractor, establish when that work will be ready. Travel, attendance and reporting form part of the agreed quotation.
For foundations still to be installed, Taunton ground screw installation explains the support and frame options. You can keep testing as a separate instruction or discuss both services together with their respective scopes defined.
Our Taunton base service describes the other foundation methods, and the Somerset service-area page shows other listed towns. You can ask about a testing visit without choosing an installation method first.
Taunton-area testing enquiries
Send the testing purpose and full postcode for a site in Taunton or the surrounding places below. We consider TA1/TA2 addresses, nearby TA3/TA4 locations and the Burrowbridge TA7 fringe, confirming the test arrangement, access and travel for that address.
- Taunton neighbourhoods: town centre, Blackbrook, Holway, Comeytrowe, Galmington, Lambrook, Halcon, Lane, Manor, Tangier, North Town, Priorswood, Obridge, Lyngford, Pyrland, Nerrols, Maidenbrook, Staplegrove, Victoria, Vivary, Wellsprings, Rowbarton, Wilton and Sherford.
- Bishop's Hull and the Oake villages: Bishop's Hull, Rumwell, Stonegallows, Shutewater, Upcott, Barr, Norton Fitzwarren, Oake, Hillfarrance, Hillcommon, Heathfield, Bradford on Tone and Nynehead.
- Cheddon and West Monkton surroundings: Cheddon Fitzpaine, Upper Cheddon, Rowford, Waterleaze, Summerleaze, West Monkton, Monkton Heathfield, Bathpool, Gotton, Goosenford, Coombe, Overton, Kingston St Mary, Nailsbourne and Dodhill.
- Bishops Lydeard and adjoining villages: Bishops Lydeard, Cothelstone, Cotford St Luke, Ash Priors, Halse, Combe Florey, West Bagborough, Lydeard St Lawrence, Tolland, Fitzhead and Milverton.
- Trull and Pitminster communities: Trull, Staplehay, Canonsgrove, Cutsey, Daws Green, Dipford, Sweethay, Kibbear, Pitminster, Blagdon Hill, Angersleigh, Fosgrove, Poundisford, Culmhead, Chelmsine, Fulwood, Howleigh, Sellicks Green, Haygrass, Duddlestone and Corfe.
- Stoke St Mary and the Neroche villages: Stoke St Mary, Orchard Portman, Thurlbear, Staple Fitzpaine, Bickenhall, Curland, Hatch Beauchamp and West Hatch.
- Ruishton, Creech and the eastern villages: Ruishton, Henlade, Lower Henlade, Thornfalcon, Creech St Michael, Creech Heathfield, Charlton, Ham, Adsborough, Langaller, Walford, Durston, Lower Durston, North Curry, Knapp, Newport, Lillesdon, Wrantage, Helland, East Lyng, West Lyng, Stoke St Gregory, Curload, Meare Green, Huntham and Burrowbridge.
Feedback on Craig’s earlier work
Feedback on Craig’s earlier groundwork and customer service.
"Craig and the team are absolutely fantastic. From courtesy, to standard of work, to tidiness — everything exceeded expectations. The job was arranged, booked and done extremely quickly and we are very happy with the results. Nothing was too much trouble, and communication was easy."
"Craig and his crew were excellent from the first communication, quote, timing of work and quality of work. Highly recommended."
Questions about ground screw testing
A clear test brief helps turn the visit into useful evidence for the foundation assessment.
Is testing available without a JustBases installation order?
Yes. You can commission testing separately for suitable trial screws or an existing foundation, including screws supplied and fitted by another business. Tell us what you need to establish and the postcode. The proposed screw, access and test method are assessed before the work is confirmed.
When might a trial test be useful?
It can provide evidence while a proposed foundation is being developed, before all the supports are installed. The designer chooses the relevant screw and location and specifies what the trial should establish. The findings can then inform the design and any further testing required for the planned foundation.
Does one test direction cover all the foundation loads?
Each direction examines a different response. An upward pull concerns uplift, a downward test compression and a sideways test lateral behaviour. The required design evidence determines which tests are specified, together with any applicable calculations. Agree the necessary directions and criteria as part of the brief.
Why does the loading arrangement matter in a lateral test?
Applying force further above a screw connection changes the bending action being examined. The test therefore needs a defined loading height and direction, with a connection suitable for the intended check. Your assessor specifies the arrangement and the response to be measured; we establish whether it can be carried out safely at the selected position.
Which existing screw records should I look for?
A layout, product identification, installed dimensions and any installation or torque records can all help. Share what you already have without dismantling connections to obtain more information. We discuss missing details and whether they affect the test scope or the designer's ability to use the results.
What should I do if the screws are already supporting a building?
Send an explanation of the building and the reason for testing, with photographs if they are easy to take safely. You do not need to remove a frame connection to start the discussion. We first establish whether the proposed test is feasible, including who would arrange any necessary unloading or temporary support. That preparation must be agreed and carried out competently before the test proceeds.
How many screws need to be tested?
Your assessor specifies the number and locations in the test brief. The selection needs to supply evidence for the decision being made, including separate checks where different parts of the foundation warrant them. We quote the resulting programme. A result belongs to the position and arrangement tested; applying it to untested supports requires the assessor's judgement.
How are test loads and acceptance criteria established?
They come from the project's assessment requirements, with the responsible designer or other appointed competent assessor defining them. The loading sequence and measurements must suit that purpose. Agreeing the criteria before attendance allows the completed record to be compared against a clear requirement.
What is the role of installation torque monitoring?
It measures resistance to rotation while the screw is being driven into position. That can be useful installation evidence when specified, but it differs from measuring movement under a later applied load. Any capacity relationship used with the torque record needs a justified method applicable to the foundation.
Is specialist torsional testing another name for monitoring torque?
No. A specialist torsional test applies a twisting action to examine the resulting response; monitoring observes turning resistance during installation. Both services are priced on application and need their own scope. Neither should be assumed to be included because a pull, compression or lateral test has been booked.
How do I request the right compression evidence?
Tell us whether your assessor needs measurements from a downward-load test or will accept a specified calculation using other test evidence. We agree the appropriate service on that basis. A calculated result is only appropriate where the method applies to the project, with its evidence and assumptions stated; it is reported as derived rather than as a directly measured downward response.
Who decides whether the test results are sufficient?
The designer or other appointed assessor makes that decision for the project, using the report and the requirements they set. If a building-control body or another reviewer needs particular evidence, establish that requirement when the testing is planned. Our report documents the commissioned tests; it is not a certificate approving the whole building or a substitute for the remaining design checks.
What happens if the response differs from what was expected?
The measured response is reported even when it does not support the intended next step. The assessor considers what it means before work proceeds on the strength of that result. They may request more information or a revised foundation proposal; we can discuss any resulting test requirement separately. A different support arrangement or a return visit is not automatically included in the original commission.
What must I have ready for the first discussion?
The reason for testing and site postcode are enough to begin. Mention whether the screws are trials or already part of a foundation, and share any available request from the project team. The technical brief, safe arrangement and reporting scope are settled before booking rather than demanded in the first message.
What does each additional ground screw test cost?
At the same location on the same day, each additional compression test costs £320 extra, each additional pull, tensile or uplift test costs £160 extra, and each additional lateral test costs £155 extra. These fixed charges are for further tests of the same type. The first test of each type is priced separately, using the starting price for your location. The extra-test charges stay the same in every location.
Discuss your Taunton test
Explain what needs to be measured and where the foundation is. We can discuss the required information, agree the work and provide a written quotation before arranging attendance.