
Ground screw testing in Worthing
JustBases provides ground screw testing in Worthing, including pull, compression and lateral tests. We can test suitable trial screws before the foundation is finalised, or accessible existing screws, including installations by another contractor. Tell us what you need to establish and we will help define the testing scope.
Choose the loading direction your design needs
A ground screw can be required to resist loads in different directions. The test programme should follow the loads and movement limits relevant to your project, so each result answers an identified design question. Your engineer or foundation designer can specify the direction, positions and criteria; if those instructions are still being prepared, tell us what stage you have reached.
Physical testing records the response to an applied load. Installation torque monitoring and specialist torsional testing are different services, described in the price section below.
Pull testing
An upward load checks how a screw resists being pulled out of the ground. This can provide evidence for an uplift requirement, with the applied load and measured movement recorded through the agreed sequence. See how the test is arranged and what information it provides.
Learn more: Pull testingCompression testing
A downward load examines the screw's response when carrying weight. Agree whether the project needs a direct compression test or can use an applicable derived method with its stated assumptions. The basis used must be clear to the person checking the design.
Learn more: Compression testingLateral testing
A sideways load investigates the response to a horizontal force. Loading height, connection detail and measurement arrangement matter because they affect how the screw is being tested. The programme should match the condition the designer wants to assess.
Learn more: Lateral testingGround screw testing prices and scope
The guide prices below give a starting point for the physical test services. A quotation defines the number and type of tests, where they will take place, the agreed loading and recording requirements, and any preparation needed to reach the screws. Send the site postcode so travel and access can be included in the scope.
Installation torque monitoring measures the turning resistance as a screw is driven into the ground. A specialist torsional test instead applies a twisting load under an agreed test arrangement. Both services are price on application and neither is automatically included with a pull, compression or lateral test. Where torque information is proposed as design evidence, the applicable method and interpretation must be agreed.
Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.
- Pull test (tensile or uplift test)
- From £515
- Load test (compression test)
- From £1,030
- Lateral test (sideways load)
- From £504
- Installation torque monitoring
- Price on application
- Specialist torsional load test
- Price on application
Each additional test
Each extra charge applies to an additional test of the same type, at the same location on the same day. The first test of each type is priced separately.
- Pull test (tensile or uplift test)
- £160 extra
- Load test (compression test)
- £320 extra
- Lateral test (sideways load)
- £155 extra
No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.
Tell Craig what you need to check
You can start with a short message: where the screws are and why you need testing. For example, you may be investigating a proposed foundation or have been asked for evidence about an existing installation. Craig can then discuss the information needed for a useful quotation.
Use the form, call 01202 039753, or send a WhatsApp message using the button. Plans, photographs and existing records can follow when available; you do not need to assemble a technical pack before making contact.
Request your free quote
Give us your contact details and a short description of the testing you need. You can ask before the technical requirements are complete.
Your enquiry
Ground screw testing in Worthing
From the testing brief to the written record
Agreeing the purpose before the visit makes the work more useful. The test method, preparation and report should all relate to the decision the results are intended to support.
Agree what will be measured
Identify the relevant loading direction and the screws or trial positions to be assessed. The designer's test loads, loading sequence and acceptance criteria help define the work. Confirm who will review the results and whether the project needs a witnessed test.
Prepare the test location
Review screw access, surrounding space and any structure already supported by the installation. Agree enabling work and a safe test arrangement before the visit, including any temporary support or separation that a competent person needs to plan.
Apply the agreed load and record movement
Carry out the specified sequence and record the load and movement at the agreed stages. Note the test location, screw identification and relevant conditions so the measurements can be traced back to the item tested.
Provide the record for review
Supply the agreed written test record for the designer or other nominated recipient. They can compare the results with the project criteria and decide whether the foundation detail can proceed or needs further work.
Trials and existing installations
A trial screw allows testing to contribute before the final foundation arrangement is settled. Its location and specification should be chosen for the evidence needed: the designer may want to examine a proposed support position, investigate more than one part of the site, or compare an alternative detail. Agree the role of the trial screw after testing as part of that brief.
Existing screws can also be considered, including those fitted by someone else. Useful starting information includes any installation record, screw identification, layout and photographs of the heads and connections. Where records are incomplete, explain what is known; the suitability and limits of the proposed test can then be discussed.
If a building or frame is already attached, testing must account for the supported structure and the effect of applying the test load. Access alone does not settle that question. Any necessary temporary support, disconnection and reinstatement must be designed and allocated before work starts. Leave those arrangements to the people responsible for the structure rather than removing connections to obtain a quote.
Tell us whether the test needs to happen before building delivery, as part of a designer's investigation, or during other foundation work. That timing helps organise the visit and the information required without making physical testing an automatic part of every installation.
What the results can support
A useful record identifies the test, not just a final load figure. The agreed reporting scope can include the screw and location, test direction, loading stages, measured movement and any relevant observations. It should also make clear how the measurements were obtained so the reviewer can understand the basis of the result.
For compression, distinguish a directly applied downward test from an applicable derived assessment. A derived result relies on a specified relationship or method and its assumptions; it should be described that way rather than presented as a direct compression measurement. Confirm that the proposed evidence suits the design requirement before commissioning it.
The responsible designer interprets the results against the loads, movement limits and safety provisions for the project. They also consider the rest of the load path: the building and floor, supporting frame, connections, screws and ground. A test of selected screws does not certify the complete building, establish every connection's capacity or automatically secure building-control approval.
If the measurements lead to a changed screw detail or further investigation, the designer can set the next requirement. A follow-up test can then be quoted against that revised brief, with any differences from the first arrangement clearly identified.
Arranging your Worthing testing visit
Include the full address when arranging the work, together with the route to the test area and anything that affects access to the screw heads. Photographs from the entrance through to the foundation can help explain the space available. If another contractor or designer needs to attend, tell us so the programme and responsibilities can be coordinated.
For a new project, ground screw installation in Worthing explains the foundation and frame options. Our Worthing base services also cover concrete, paving and timber-on-post alternatives if the foundation method is still open.
You can check where we work in West Sussex for the wider area. For testing, describe the requirement at your actual site so we can confirm the visit and scope in the quotation.
Worthing and nearby testing locations
We welcome testing enquiries from Worthing and the surrounding places listed below. Please send the site postcode and location of the screws so the practical arrangements can be confirmed.
Worthing addresses include BN11, BN12, BN13 and BN14. Nearby enquiries may also use BN15, BN16, BN17, BN42, BN43, BN44 or RH20. These districts help identify an address; availability and the testing visit are confirmed for the particular site. If your address is nearby but not listed, you can still ask.
- Worthing areas: town centre, East Worthing, West Worthing, Goring-by-Sea, Goring Hall, Durrington, West Durrington, Broadwater, Tarring, West Tarring, Salvington, High Salvington, Findon Valley, Offington, Northbrook, Heene, Gaisford, Selden, Marine, Castle, Castle Goring, Highdown, Teville Gate and South Farm Road.
- Ferring, Angmering and adjoining places: Ferring, Angmering, East Preston, Kingston, Kingston Gorse, Rustington, Littlehampton, Lyminster, Crossbush and Poling.
- Findon, Washington and nearby villages: Findon village, Nepcote, Clapham, Patching, Washington, Heath Common, Wiston, Buncton, Ashington, Storrington and Sullington.
- Sompting, Lancing and Adur-area places: Sompting, Cokeham, Peverel, Lancing, North Lancing, South Lancing, Mash Barn, Widewater, Coombes, Shoreham-by-Sea and Southwick.
- Steyning and the adjoining villages: Steyning, Bramber, Upper Beeding and Botolphs.
Feedback on Craig’s earlier work
Feedback on Craig’s earlier groundwork and customer service.
"Craig and the team are absolutely fantastic. From courtesy, to standard of work, to tidiness — everything exceeded expectations. The job was arranged, booked and done extremely quickly and we are very happy with the results. Nothing was too much trouble, and communication was easy."
"Craig and his crew were excellent from the first communication, quote, timing of work and quality of work. Highly recommended."
Ground screw testing questions
These answers explain how to start an enquiry and what to agree with the people responsible for the foundation design.
Can you test ground screws without installing a new foundation?
Yes. Testing can be a separate commission for suitable trial or existing screws, including screws installed by another contractor. We need to establish what is being tested, why the evidence is needed and whether a safe, meaningful test arrangement can be made. Start with that purpose and the site postcode; existing records can help define the scope.
When is a trial screw useful?
A trial can provide measured evidence while the foundation design is still being developed. The designer selects a position and specification suited to the question being investigated and sets the required loading and movement criteria. Agree whether the trial screw will remain, be incorporated into an approved arrangement or require other work after the test.
How do I know whether to ask for pull, compression or lateral testing?
Use the direction of the load the foundation must resist. Pull testing applies an upward force, compression concerns downward loading and lateral testing applies force sideways. A project may need evidence in more than one direction. Your designer can identify those requirements; if you have only been told to obtain a test, share that instruction so the correct scope can be clarified.
What needs to be specified for a lateral test?
The brief should identify the direction and height of the applied force, the screw and connection arrangement, the loading sequence and the movement to be measured. Those details make the result relevant to the intended support condition. The designer's acceptance criteria are also needed to judge the response, rather than treating any recorded sideways load as a general capacity.
What existing installation information should I send?
Send whatever you have: a screw layout, product identification, installation notes, available torque records and photographs can all be useful. Explain which records relate to which screws if that is known. Missing documents can be discussed at the enquiry stage, although they may affect the test that can be planned and the conclusions available to the designer.
Can testing take place while a building is attached?
That requires a specific review of the supported structure, connections and intended test load. Temporary support or separation may be necessary, and responsibility for that work must be agreed with competent people before testing. Do not dismantle the foundation to prepare an initial enquiry; describe the arrangement and send photographs if available.
Does every screw have to be tested?
The test programme determines the number and selection of screws. That may be influenced by the design loads, site information, installation records and the purpose of the investigation. A result belongs to the screw and arrangement tested; the designer decides how it can be used within the wider foundation assessment and whether additional tests are needed.
Who decides the test load and whether the result is acceptable?
The responsible engineer or foundation designer should set or approve the loading programme and acceptance criteria for the intended use. The testing scope then follows those instructions. Providing a measured result and accepting a foundation design are different tasks, so confirm who will receive and interpret the record when arranging the work.
Is installation torque monitoring the same as a load test?
No. Installation monitoring records the turning resistance encountered while the screw is being driven. Pull, compression and lateral tests examine response to an applied physical load in the agreed direction. Using torque information to support design requires an applicable agreed interpretation; it is not an automatic replacement for the physical test evidence a project calls for. Monitoring is price on application.
What is a specialist torsional test?
It is a separately specified test that applies a twisting load to assess the screw's response under that arrangement. It is distinct from recording insertion torque during installation, and from the three directional load tests. Tell us why torsional evidence is required so the method, preparation and reporting can be discussed. This specialist service is price on application.
Will a compression result always come from a direct downward test?
The proposed method must be stated. A direct compression test applies downward loading and measures the response. Where a derived method is applicable, its relationship, assumptions and suitability for the project need agreement and should be identified in the report. Ask for the basis required by your designer so the quotation covers the right evidence.
What will I receive after the test?
The quotation should define the written record, including the test identification, loading and measurement information required for the project. Confirm the intended recipient and any report format or witnessing requirement in advance. The record supports design review within its stated scope; it is not a certificate for the complete building or an automatic approval of all foundation components.
What happens if the designer needs more evidence afterwards?
Share the designer's comments and the specific further question to be answered. They may require another position, direction, loading arrangement or revised foundation detail. Additional work can be scoped and priced against those requirements, with the connection to the earlier results recorded. Agree any changes before a repeat visit is arranged.
What do you need to quote for a Worthing testing visit?
Begin with the postcode and a plain explanation of the purpose, including whether the screws are trials, existing and exposed, or already supporting a structure. We can then ask for the relevant screw information, access detail and designer's instructions. Drawings are useful when available, but they are not a condition of making the first enquiry.
What does each additional ground screw test cost?
At the same location on the same day, each additional compression test costs £320 extra, each additional pull, tensile or uplift test costs £160 extra, and each additional lateral test costs £155 extra. These fixed charges are for further tests of the same type. The first test of each type is priced separately, using the starting price for your location. The extra-test charges stay the same in every location.
Request a ground screw test
Send your testing enquiry with the purpose and postcode. Mention whether the screws are planned, accessible on site or already connected to a structure, and Craig can discuss the next step.
