Ground screw testing in Bognor Regis
JustBases takes standalone ground screw testing enquiries in Bognor Regis, Felpham, Aldwick, Bersted and surrounding villages. We can consider suitable trial and existing supports, including screws from another installer, and agree the testing and reporting for your project.
Tests for different foundation loads
Testing helps a project team assess how a selected screw responds when force is applied. The direction matters: a foundation may need evidence for lifting, downward support or sideways movement. We can discuss the required assessment with you and the person responsible for the foundation.
A useful test is defined around the decision it will support. The required loads and movement criteria, relevant screw and loading arrangement are established before the visit. You can enquire in ordinary terms while those technical requirements are being worked out.
Upward pull testing
An upward force is applied to examine uplift resistance. The load and movement at the tested support are recorded, providing evidence for the agreed upward requirement and its assessment.
Learn more: Upward pull testingDownward compression testing
A direct compression test pushes down on the support and measures its response. We can also discuss compression calculations from pull-test data where a suitable method is agreed. The report identifies which values came from downward testing and which were derived.
Learn more: Downward compression testingSideways lateral testing
A lateral test investigates response to horizontal loading. The specified direction and connection position are considered with the required force, so the recorded movement relates to the intended sideways assessment.
Learn more: Sideways lateral testingTesting prices and the work quoted
The guides below provide a starting budget by test method. We agree what is to be tested and how many positions are required, then consider preparation, access and the reporting scope. Any separate visits or work by others need to be clear in the quotation.
Torque-related work has separate price-on-application scopes. Installation monitoring records resistance to turning while driving the screw. Specialist torsional testing applies a twisting load as its own assessment. Both must be expressly agreed, and neither is automatically supplied with installation or a physical load-testing visit.
Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.
- Pull test (tensile or uplift test)
- From £508
- Load test (compression test)
- From £1,016
- Lateral test (sideways load)
- From £498
- Installation torque monitoring
- Price on application
- Specialist torsional load test
- Price on application
Each additional test
Each extra charge applies to an additional test of the same type, at the same location on the same day. The first test of each type is priced separately.
- Pull test (tensile or uplift test)
- £160 extra
- Load test (compression test)
- £320 extra
- Lateral test (sideways load)
- £155 extra
No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.
Ask us about the evidence you need
Start with the reason for testing and the site postcode. If you have been asked for a report, you can forward that request without turning it into a technical brief yourself. We discuss what is already known and which instructions need confirming for the work.
Use this form, call 01202 039753 or message Craig on WhatsApp. Drawings and screw records can be supplied as available. We can quote testing separately for a suitable foundation even where another company handled installation.
Request your free quote
Tell us what you need to find out and the postcode. We can help clarify the testing work with you.
Your enquiry
Ground screw testing in Bognor Regis
Agreeing and carrying out a testing visit
The quotation connects the requested evidence with a practical visit. We establish the responsibilities and safe arrangements before loading any support.
Define the requested assessment
We discuss the foundation and the question being investigated. The responsible designer establishes the loads and criteria, and the selected screws are identified for the test schedule. Methods, calculations and the written report are confirmed within the commissioned work.
Confirm the safe working arrangement
The load needs a suitable connection and sufficient working space at the support. We review the proposed access with the site team, particularly where a floor or other structure is attached. Any preparation, temporary support and responsibilities for enabling work are settled before attendance.
Apply the agreed tests and supply the evidence
The chosen supports are loaded through the specified arrangements and their response is recorded. You receive the test results, written report and project-specific load calculations in the agreed scope, ready for the responsible project team to review.
Testing before or after building installation
The construction stage helps determine what can be reached for testing. If the screws are exposed, coordinate the test before the floor restricts the selected connections. If the building is already above them, describe the support and accessible space as it stands. Keep its structural members and fixings in place while the proposed work is assessed; any opening-up, unloading or temporary support requires a safe agreed method and responsibility for reinstatement.
A trial takes place for a specified foundation question before the main work is settled. Its product and position should be established with the designer, with time to use the findings in the next decision. We also clarify the supply and fitting of the trial support and what happens to it afterwards. Suitable third-party screws can be tested, and the quotation defines our testing work independently of any installation contract.
Your test report and foundation assessment
The assessment criteria give the recorded response its meaning for the project. Your designer considers the loading and movement shown in the report alongside the complete foundation and building requirements. The tested supports and arrangements are identified so this review concerns the actual evidence supplied. Whole-structure approval remains separate from the testing service.
We supply the written results with the agreed project-specific load calculations. Where compression is calculated from pull data, the applicable method and its assumptions explain how the derived value was reached. Direct compression evidence instead comes from physical downward loading. The report distinguishes these routes, allowing the reader to understand both the observations and the basis of the calculations used.
Booking testing in the Bognor Regis area
Before confirming the visit, identify who will have the work area ready and who can authorise access. We discuss the selected positions with that contact so the preparation and testing appointment fit together. Shared entrances, occupied buildings and other work on site should be taken into account when agreeing the arrangements.
Tell us when the findings will be needed, as well as any preferred attendance date. A test may be one stage within a larger construction programme, so the time for preparing the site and using the report needs to be allowed for. Provide the complete address and directions to the working entrance when booking; the first enquiry can still be just the purpose and postcode.
Nearby testing enquiry areas
We welcome enquiries from central Bognor Regis, Hotham, Marine, Orchard, Pevensey, Hatherleigh, South Bersted, North Bersted and Shripney.
Nearby Aldwick areas include Rose Green, West Meads, Aldwick Bay, Craigweil, Aldwick Felds, Aldwick Park, Willowhale, St Richards, Barrack Lane, Gossamer Lane, Fernhurst Gardens and the Aldwick Street and Fish Lane neighbourhoods. We also welcome Pagham, Nyetimber and Lagness enquiries.
The surrounding area includes Felpham, Blake's Mead, Summerley, Flansham and Flansham Park; Middleton-on-Sea, Elmer and Ancton; and Yapton, Bilsham, Ford, Climping and Atherington.
Ask about Barnham, West Barnham, Eastergate, Westergate, Woodgate, Lidsey, Nyton, Norton and Aldingbourne, together with Walberton, Binsted, Fontwell, Slindon, Tortington, Crossbush and Arundel.
We also take enquiries from Runcton, North Mundham, South Mundham, Hunston, Colworth, Merston, Drayton, Oving, Shopwyke, Tangmere and nearby Chichester.
PO21 and PO22, with nearby PO20, BN18 and BN17 addresses, are useful postcode examples. Send the complete address and postcode so the service, visit and travel can be confirmed for the actual property. Our West Sussex service areas page lists other towns. Ask us about an unlisted nearby property too.
Feedback on Craig’s earlier work
Feedback on Craig’s earlier groundwork and customer service.
"Craig and the team are absolutely fantastic. From courtesy, to standard of work, to tidiness — everything exceeded expectations. The job was arranged, booked and done extremely quickly and we are very happy with the results. Nothing was too much trouble, and communication was easy."
"Craig and his crew were excellent from the first communication, quote, timing of work and quality of work. Highly recommended."
Ground screw testing FAQs
Can I contact you with an incomplete testing request?
Yes. Explain why testing has been requested and where the site is. We can discuss the work before you have a final schedule or drawings, and help identify what the responsible designer needs to confirm. Forwarding any message you received is useful, but a plain description is enough to begin.
Can the homeowner book while an engineer specifies the tests?
You can arrange the enquiry and quotation with us while the engineer establishes the requirements. Make clear who is specifying the evidence and who will use the report. Their loads and assessment criteria must be settled for the test, with the practical work and reporting agreed before booking attendance.
How is the loading direction decided?
It follows the force the foundation needs to resist and the evidence required for its assessment. Pull-out testing addresses uplift, compression concerns downward loading and lateral testing examines sideways response. Share the project question so we can discuss the method or combination that needs to be specified.
What helps identify another installer's screws?
Send the product reference, any installation information and a support plan if available. These help establish what is present and how the proposed test could connect to it. We can consider suitable third-party foundations without an installation purchase, and discuss missing information as the testing scope is developed.
Who chooses how many positions are tested?
The responsible designer determines the extent of evidence required for the foundation question. We then discuss access and practical arrangements for those selected supports. Identifying them clearly in the instructions helps the quotation and report relate to the same planned work, including any separately agreed additional tests.
Can a trial support become part of the finished foundation?
That is a design and work-scope decision to settle when arranging the trial. The proposed product, location and test need to be appropriate for the investigation and any intended later use. Confirm who supplies and fits it, and agree the treatment of the support once the result has been reviewed.
What if the supports are covered by a floor?
Describe which connections can be seen safely and how the floor is supported. Testing needs suitable access and room for the intended loading arrangement. Keep the structure intact while this is assessed; any work to expose or unload a connection, with temporary support and reinstatement where needed, must be agreed beforehand.
What is recorded during an upward pull test?
The applied upward load and the movement of the selected screw are recorded through the agreed test. These observations help assess uplift resistance for the loading and arrangement used. The designer relates that evidence to the required criteria and the foundation it is intended to inform.
Why does the connection matter in lateral testing?
The sideways force enters the screw through a particular connection and at a defined position. That is part of the assessment being requested, so it needs to be understood with the loading direction and required response. We plan the test arrangement around those instructions to obtain relevant horizontal load evidence.
Are calculated and directly measured compression interchangeable?
They are different evidence routes. A direct compression test records response to downward loading; a calculation uses appropriate pull-test inputs through an agreed method applicable to the screw and site. Confirm which route the project requires before commissioning. The calculation basis and assumptions are included where derived compression is supplied.
What does monitoring during screw installation provide?
It provides a record of the resistance to turning while the screw is driven. Arrange that monitoring before installation if it is required for the project. It is price on application and separately scoped, rather than automatically included, and supplies different information from applying a later direct load to the support.
How do I request a twisting assessment?
Ask about specialist torsional testing and share the rotational requirement as it becomes available. This applies a twisting load under its own agreed arrangement, distinct from installation monitoring and sideways lateral loading. The specialist scope is individually quoted, price on application, and is not automatically included in other testing.
Can you address a particular reporting requirement?
Tell us who requested the evidence and share any required format or witnessing instruction before the quotation is finalised. The service supplies results, a written report and project-specific load calculations within the agreed commission. We confirm what documentation is included and identify any additional specialist or certification work separately.
What happens if the findings need further consideration?
The designer reviews the evidence against the project requirements and decides the appropriate next step. That may involve further information, a changed foundation proposal or additional agreed testing. The report is evidence for that review, not automatic approval of the full building; follow-on work has its own scope and price.
What does each additional ground screw test cost?
At the same location on the same day, each additional compression test costs £320 extra, each additional pull, tensile or uplift test costs £160 extra, and each additional lateral test costs £155 extra. These fixed charges are for further tests of the same type. The first test of each type is priced separately, using the starting price for your location. The extra-test charges stay the same in every location.
Discuss the testing quotation
Explain your testing request, call Craig on 01202 039753 or message through WhatsApp. We can talk through the evidence needed and confirm a written scope for the visit and report.