Ground screws before installation

Ground screw installation in Bognor Regis

Get ground screws installed for a suitable framed building in Bognor Regis, Felpham, Aldwick, Bersted or a nearby village. JustBases offers installed foundations with the frame by others or the stated timber-frame package, with steel and non-standard arrangements individually quoted.

Screws and frames beneath your garden building

For a compatible building, ground screws let you concentrate foundation work at its support positions. This can mean less full-area digging and material removal than preparing a continuous base, with no poured-concrete curing stage at those supports. The completed screws carry the agreed structural frame or floor above them.

The foundation is developed with that floor in mind. We discuss where the loads enter the frame, the connections to the screw heads and who supplies each part. A suitable timber or steel arrangement can then be agreed with the building supplier or responsible designer.

Garden rooms

Garden rooms

Support the room's structural floor in the places its design requires. Insulation, floor depth and the doorway affect the finished height, so the foundation and floor should be planned as one arrangement.

Learn more: Garden rooms
Sheds

Sheds

Where the shed includes an appropriate floor, its bearing instructions can be used to define the support beneath it. We discuss the frame and fixings so the floor has the support intended by its maker.

Learn more: Sheds
Summerhouses

Summerhouses

A raised platform can carry a compatible summerhouse, with its actual outline and entrance established before set-out. The support plan follows that shape and the floor above it.

Learn more: Summerhouses
Workshops

Workshops

The workspace needs a floor suitable for the equipment and activity inside. Tell us about heavy items and fixing positions so the supporting frame and foundation can be considered for those requirements.

Learn more: Workshops
Log cabins

Log cabins

Use the cabin's supporting layout to coordinate the screws with its bearers and floor. We agree what will be ready at handover and which floor and building work follows with your supplier.

Learn more: Log cabins
Browse 74 application guides

Ground screw foundation guide prices

The two guide options separate the foundation from the frame supply. Choose installed screws with the frame by others, or the stated timber frame installed with the screws. We confirm how the actual building is supported before agreeing your written price.

A steel frame or a different frame specification is individually quoted. Preparation, access and the required foundation height also contribute to the work. If clearance, removal, testing or monitoring is wanted, it is identified in the quotation so the supply and responsibilities are clear.

Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.

Building sizeInstalled ground screwsFrame by othersInstalled screws + timber frame
8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² From £1,249From £1,746
10' x 8' 3m x 2.4m 80 ft² / 7.43 m² From £1,355From £1,852
12' x 10' 3.6m x 3m 120 ft² / 11.15 m² From £1,482From £1,958
16' x 10' 4.8m x 3m 160 ft² / 14.86 m² From £1,587From £2,169
20' x 10' 6m x 3m 200 ft² / 18.58 m² From £1,693From £2,593

No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.

Start with the building you want

You can ask about screws before ordering the building or arranging its drawings. Give us the intended use and postcode, then share the model or approximate size if already known. Craig can help you understand the support options and what needs settling next.

Call 01202 039753, send a WhatsApp message or use this form. We discuss the installation and any frame work, arrange the useful site checks and provide the agreed scope and price in writing.

Request your free quote

Tell us what you would like to build and the postcode. You can start while choosing the building.

Your enquiry

Ground screw installation in Bognor Regis

Please provide either an email address or a phone number.

Add site photos, video or a drawing (optional)

Upload up to 5 photos or a short video of your site to help us provide an accurate quote.

0/5 files. JPG, PNG, WebP, PDF, MP4, MOV accepted — up to 100MB each.

Free, no-obligation quote. Your details are used to respond to this enquiry; see our privacy policy.

Installing the foundation for the agreed floor

The purpose of the installation is to leave the supports ready for the floor and frame that have been agreed. Clear dimensions, levels and connection responsibilities make that handover practical.

Set out the foundation with the frame details

We establish the building position and support arrangement from the required loads and bearing details. Site assessment informs the screw specification and preparation. The frame and its connections determine where the supports are marked and the head levels required.

Install the specified supports

With access and service-check responsibilities confirmed, the screws are installed at the agreed positions. The foundation heads are arranged for the frame connection, with installation work following the specified layout and levels.

Illustration of a framed building supported by ground screws

Complete the included frame and records

We check the completed support arrangement and finish the frame work included in our quotation. Agreed installation records are handed over, with any required testing or acceptance addressed before dependent floor and building work proceeds.

Making the site ready for the supports

Explain how the proposed building sits within the garden. Its entrance, nearby paths and the floor supplied with the model help establish the useful foundation height. The supporting frame also needs to be considered where levels change, including the arrangement of exposed parts and any access beneath the floor.

Tell us about features that could affect installation: known services, retained trees, an old slab or previous construction. We can discuss what needs checking and what preparation is appropriate before positions are confirmed. Clearance and disposal are included where agreed, with service and other site responsibilities settled before work starts.

Access is assessed for the actual installation. Describe the route from the entrance to the building position, noting steps, turns or a shared passage. An existing photograph can help us discuss what can be done and whether a visit is useful. You do not need to remove a fence or clear a base to make that first enquiry.

For a building that needs continuous concrete support, see concrete base installation in Bognor Regis. The local base overview explains paving and timber-post options too.

Testing and installation records

Your project may call for evidence before the foundation specification is settled or after supports are installed. We can coordinate separately agreed ground screw testing in Bognor Regis with the programme. Pull-out, compression and lateral tests apply upward, downward and sideways loads to assess the relevant response.

If turning resistance during driving must be recorded, ask for installation torque monitoring. Specialist torsional testing instead applies a twisting load under a separate arrangement. These are different scopes, each price on application, and neither is automatically part of installation or physical load testing. The quotation identifies the requested evidence and work.

Coordinating your Bognor Regis building project

Confirm the foundation handover with the building company before fixing assembly dates. Establish who supplies the floor, frame and connecting parts, and ask for its support instructions. If you are comparing buildings nearby, Outside Interests has a timber-building showroom at 2 Barnham Road, Barnham PO22 0ES. Ask about the current display before visiting and obtain the requirements for your selected model.

For the building's property checks, Arun's planning guidance explains the local route, including planning history and constraints. Its conservation-area map can be checked for the actual address, with building control considered separately. A site in Chichester district uses Chichester's planning service; National Park planning applications go to the Park authority. You can discuss your foundation with us alongside those enquiries.

Our Bognor Regis base services bring the alternatives together. Find the wider approved town list under West Sussex service areas.

Ground screw installation around Bognor Regis

We welcome enquiries from central Bognor Regis, Hotham, Marine, Orchard, Pevensey, Hatherleigh, South Bersted, North Bersted and Shripney.

Nearby Aldwick areas include Rose Green, West Meads, Aldwick Bay, Craigweil, Aldwick Felds, Aldwick Park, Willowhale, St Richards, Barrack Lane, Gossamer Lane, Fernhurst Gardens and the Aldwick Street and Fish Lane neighbourhoods. We also welcome Pagham, Nyetimber and Lagness enquiries.

The surrounding area includes Felpham, Blake's Mead, Summerley, Flansham and Flansham Park; Middleton-on-Sea, Elmer and Ancton; and Yapton, Bilsham, Ford, Climping and Atherington.

Ask about Barnham, West Barnham, Eastergate, Westergate, Woodgate, Lidsey, Nyton, Norton and Aldingbourne, together with Walberton, Binsted, Fontwell, Slindon, Tortington, Crossbush and Arundel.

We also take enquiries from Runcton, North Mundham, South Mundham, Hunston, Colworth, Merston, Drayton, Oving, Shopwyke, Tangmere and nearby Chichester.

PO21 and PO22, with nearby PO20, BN18 and BN17 addresses, are useful postcode examples. Send the complete address and postcode so the service, visit and travel can be confirmed for the actual property. Our West Sussex service areas page lists other towns. Ask us about an unlisted nearby property too.

Feedback on Craig’s earlier work

Feedback on Craig’s earlier groundwork and customer service.

"Craig and the team are absolutely fantastic. From courtesy, to standard of work, to tidiness — everything exceeded expectations. The job was arranged, booked and done extremely quickly and we are very happy with the results. Nothing was too much trouble, and communication was easy."
— Verified CustomerMyBuilder · SO · Cobble edge and gravel strip
"Craig and his crew were excellent from the first communication, quote, timing of work and quality of work. Highly recommended."
— Verified CustomerCheckatrade · BH20 · Garage base

Installation questions

How is a building carried by the screws?

Loads pass from the building through its structural floor or frame and connections into the screws and ground. The support arrangement must therefore work with the actual floor design. We discuss that arrangement with the relevant supplier or designer, including the positions and fixings needed between the foundation and frame.

Can an insulated garden-room floor be used?

A suitable structural floor can incorporate insulation above a screw-supported frame. Its construction and bearing details need to be agreed with the room supplier. Share the complete floor build-up when available so we can coordinate support and entrance height, with responsibility for membranes, insulation and coverings made clear.

What should I ask the building company before ordering?

Ask for the foundation plan, floor support and fixing requirements, and what the supplied building package includes. Those details help coordinate the support beneath it and identify any additional frame work. You can speak to JustBases earlier while comparing models; we can explain the foundation choices from the intended use and size.

Can another contractor provide the frame?

Yes. Installed screws with a frame by others are one of the guide options. Confirm the frame's support points and connection details with that contractor so the foundation can be prepared appropriately. Our written quotation identifies what JustBases installs and what remains for the frame and building team.

How is the supplied timber frame defined?

The stated timber-frame package is confirmed for the proposed outline and building requirements before booking. If a different specification is needed, we discuss and quote that work individually. The frame details and connecting responsibilities are recorded so you know what is supplied at the foundation handover.

Can you discuss steel or a non-standard frame?

Yes, these arrangements are considered for an individual quotation. A supplier's frame information is helpful if you already have it, or we can begin with the building proposal. The required construction, loads and connections need to be established before the installation scope and price can be confirmed.

How do you check whether access is practical?

We consider the intended installation with the route to the footprint. Describe where entry is possible and any gateways, changes in height or tight turns. Photographs can make that conversation easier. We agree the working arrangement and any preparation after the practical details have been assessed, using a site visit where useful.

Can the floor meet an existing path or step?

That can be discussed as part of planning the finished height. The screw heads, frame and complete floor build-up all contribute to where the doorway will sit. Tell us which surrounding surfaces are being retained so the foundation can be coordinated with the entrance and any additional access work.

What if the proposed footprint contains an old slab?

Show its position in relation to the new building and explain what you know about it. We need to assess access to the proposed support points and any preparation needed through or around existing construction. The quotation identifies the removal, breaking out and disposal tasks you agree.

What checks are needed near services and trees?

Known service routes and retained trees should be identified while the support arrangement is planned. We establish the relevant checks and preparation before installation, including any specialist advice or permission needed for the actual work. Send the information already available and we can discuss the next step without requiring it all at first contact.

How are the screw size and layout chosen?

The required loads and frame connections are considered with the site's assessment. Together they inform the screw specification, supporting positions and levels. Any investigation or testing required for that decision is agreed with the project team, then the installation follows the confirmed foundation arrangement.

When should load testing take place?

Its purpose determines the useful stage. A trial may inform the specification before full installation, or testing may be requested on completed supports. The responsible designer establishes the evidence required, and we agree the testing separately so the selected connections are accessible at the right point in the building programme.

Are torque monitoring and twisting tests included?

They require their own agreed scopes, both price on application. Monitoring records turning resistance as a screw is installed. Specialist torsional testing applies a separate twisting load to assess rotational response. Neither is automatically included with the foundation or physical load tests, so tell us if either has been requested.

What guarantee applies to the installed foundation?

JustBases provides a full ten-year guarantee on its installation workmanship and supplied foundation materials, subject to the written quotation. This is separate from the building supplier's warranty and any testing results. Correctly specified hot-dip galvanised screws can have an expected lifespan of 50 years or more, qualified by ground conditions and correct installation.

Ask Craig for the installation scope and price

Tell us about your planned building, call 01202 039753 or use WhatsApp. We can discuss a suitable screw foundation, the frame responsibilities and the work to quote for your site.