Detail of an installed ground screw

Ground screw testing in Burley

Arrange ground screw testing in Burley with JustBases, independently of an installation order. We offer physical load checks and written results for the agreed investigation, including suitable trial screws and existing supports installed by other companies.

Check uplift, compression or sideways restraint

A foundation may need to resist more than one action. We discuss the evidence requested for your project, then quote the tests that address it. Each test has an agreed procedure and requirements for interpreting the response.

For compression, a physical test means applying a downward load. A compression assessment calculated from pull readings is a separate approach that needs an applicable method agreed for the screw system and project. Say which evidence has been requested so the quotation and report describe it accurately.

Pull testing

Upward loading investigates the installed screw's response to tension. The recorded behaviour can be reviewed for the specified uplift requirement.

Learn more: Pull testing

Testing guide prices and a written scope

The guide prices below help you budget for the different services. Your quotation confirms the scheduled tests, visit arrangements and reporting, with the number of supports and practical setup considered for the site.

Torque services have their own scope and are both price on application. Insertion monitoring records the turning resistance during installation, whereas specialist torsional testing examines the response to an applied twisting load. Neither is automatically included in a testing visit. A recorded insertion torque is not a physical pull, compression or lateral test.

Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.

Installation torque monitoring
Price on application
Specialist torsional load test
Price on application

Each additional test

Each extra charge applies to an additional test of the same type, at the same location on the same day. The first test of each type is priced separately.

Pull test (tensile or uplift test)
£160 extra
Load test (compression test)
£320 extra
Lateral test (sideways load)
£155 extra

No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.

Ask about testing at your site

Start by telling us the postcode and the reason you are considering a test. A designer's request, photographs or existing records are welcome if available, but a project description is sufficient to open the discussion. We will identify the information needed to agree the work as the enquiry progresses.

Request your free quote

Tell us what stage the foundation has reached and why testing is being considered. You can enquire before a detailed brief is ready.

Your enquiry

Ground screw testing in Burley

Please provide either an email address or a phone number.

Add site photos, video or a drawing (optional)

Upload up to 5 photos or a short video of your site to help us provide an accurate quote.

0/5 files. JPG, PNG, WebP, PDF, MP4, MOV accepted — up to 100MB each.

Free, no-obligation quote. Your details are used to respond to this enquiry; see our privacy policy.

Agreeing the visit with the people using the results

It helps to know who needs the evidence and what they will do with it. An owner seeking a foundation check and a contractor following a designer's test instruction may arrive with different information. We can start with either and work towards a defined commission.

Establish the project requirement

The purpose of the investigation and the relevant design instruction identify the required loading direction and outcome. The responsible designer or reviewer establishes the criteria against which the evidence will be assessed. We clarify the proposed testing service and any calculations or reporting needed.

Plan access and the test locations

Selected positions, screw information and the condition of the foundation are considered with the loading procedure. We agree a safe means of reaching the supports and carrying out the test, including suitable reaction space. Required enabling work and responsibility for making the site ready are confirmed.

Apply the scheduled loading

The agreed load stages are applied and the response recorded for each test. The site record identifies what was carried out and any circumstances relevant to using the readings. A change or incomplete part of the programme is made clear to the project team.

Issue the written test record

The commission includes the agreed report and any specified calculations. These can be passed to the person assessing the foundation, who decides the action to take from the findings. Timing for that review should be allowed for before work dependent on the result proceeds.

New foundation investigations and installed supports

Discuss the investigation with the person deciding the foundation before ordering the main work. Their instruction needs to explain why a trial is useful and what decision will follow once the results are available. Allowing for that review gives the final design an opportunity to respond to the evidence. For the quotation, identify whether trial screw supply and fitting are part of the request.

For screws already installed, establish whether they can be reached in the condition in which they will be presented for the visit. A building, floor or attached frame may require an agreed plan for access and continued support. Do not loosen fixings or alter the structure to make a test point available; any opening-up, unloading, temporary support and reinstatement must be planned with competent people and the responsible designer.

We can consider testing another installer's suitable screws without taking over their installation work. Ask for available product and installation information and confirm permission to carry out the test. That helps establish what can be assessed and whether any preparation or further identification is needed before the testing date is fixed.

What you receive after testing

Agree the written output when commissioning the work, so it meets the requirement that prompted the investigation. The report supplies evidence for the foundation decision; the responsible designer or project reviewer still has to decide how it applies to the building and what should happen next.

The recorded test findings

The findings are tied to the identified tests and the procedure carried out. Loading and movement observations explain the response, with relevant limitations or incomplete work stated. Keeping that record with the test instruction gives the reviewer the context needed to assess the outcome.

Any agreed calculations

Calculations are identified separately from physical readings and use the applicable agreed basis. For example, a compression assessment using pull-test data must explain that method and its assumptions. It is different from reporting what happened when a downward load was physically applied.

Making the testing appointment

If you are arranging the visit on behalf of someone else, establish who can authorise the testing scope and respond to questions about it. Forwarding the actual instruction helps bring their requirements into the quotation. Agree who can decide any change if the proposed work cannot be completed as planned, so the site visit has a clear contact and the result remains useful to the person requesting it.

The date can be confirmed once the required preparation and access are arranged. Provide the full address and entrance details, then agree the timing of the written results with any deadline for their review. For new foundation work, see our Burley installation service. You can commission testing on its own before deciding on further foundation work.

Burley-area testing enquiries

Ask us about testing in Burley village, Burley Street, the residential area around Burley Lawn, Bisterne Close, Mill Lane, Shappen and Moorhill Road, Coach Hill and Vereley, or the Castle Hill Lane and Burley Beacon area. Nearby locations include Holmsley and Wootton.

We also welcome enquiries from Bransgore, Thorney Hill, Neacroft, Godwinscroft, Beckley, Hinton and Waterditch; from Bisterne, Sandford, Crow, Crow Hill, Hightown and Ringwood; and from the Brockenhurst and Lyndhurst areas. Send the full property details so we can confirm the proposed work and travel arrangements.

BH24 includes Burley and Ringwood addresses, with BH23 examples around Bransgore, BH25 around Wootton, SO42 around Brockenhurst and SO43 around Lyndhurst. Send your full postcode and let us know if the site entrance is elsewhere, so we can plan the route and access for your test.

Feedback on Craig’s earlier work

Feedback on Craig’s earlier groundwork and customer service.

"Craig and the team are absolutely fantastic. From courtesy, to standard of work, to tidiness — everything exceeded expectations. The job was arranged, booked and done extremely quickly and we are very happy with the results. Nothing was too much trouble, and communication was easy."
— Verified CustomerMyBuilder · SO · Cobble edge and gravel strip
"Craig and his crew were excellent from the first communication, quote, timing of work and quality of work. Highly recommended."
— Verified CustomerCheckatrade · BH20 · Garage base

Ground screw testing FAQs

Is testing available separately from installation?

Yes. You can commission suitable testing alone, including for screws installed by another company. Explain the purpose of the check and what is on site so we can discuss the proposed work. The quotation identifies the agreed testing work and written results.

At which stage of a project should I ask about testing?

Ask when a foundation decision needs evidence, whether that is during design or after screws have been fitted. Earlier discussion helps you leave the relevant supports accessible and allow time for the results to be considered. You can enquire while the detailed instruction is being developed rather than waiting until the next contractor is due.

How do I explain the testing requirement if I am not a designer?

Describe why you have been asked for the check and share the request if you have it. We can explain the available services in everyday terms. The loading direction and procedure still need to be established with the responsible project instruction before booking, so the evidence addresses the intended question.

Who decides which screws and test criteria to use?

Those decisions form part of the investigation specified for the project. The responsible designer or reviewer identifies the required evidence, including selected positions and acceptance criteria. We discuss whether the practical test arrangement can meet that instruction and record the agreed work for their assessment.

Can a test directly check downward support?

Yes, a direct compression test applies downward loading and measures the resulting movement. We need to agree how the load will be applied and reacted at the test position. Include the direct-test requirement in the enquiry so the necessary setup and access can be considered in the quotation.

How should I understand compression derived from a pull test?

It is a calculated assessment using upward-test evidence under an applicable agreed method, not an observation of downward loading. The calculation needs to identify its basis and assumptions for the screw system and project. Your designer should confirm whether that evidence meets the requirement or a physical compression test is needed.

What distinguishes a sideways test from the other checks?

It investigates a horizontal action rather than uplift or downward support. The direction, height of load application and required movement assessment need to match the question being asked of the foundation. A lateral result can then be read in that context, alongside any other tests commissioned for the project.

What should be agreed for a trial installation?

Be clear about the investigation it serves and who will provide and fit the screws. The designer should identify a useful product, position and loading requirement. Also agree what happens after the test, including any removal or replacement, so the trial and the later foundation work have a clear relationship.

Does testing mean a support must be replaced?

The procedure and outcome determine whether continued use can be considered. A trial or test approaching a limit may affect the support differently from another scheduled check. The intended use afterwards should be discussed before testing, then confirmed by the responsible designer using the actual findings.

What information helps when the screws came from another supplier?

The product reference and installation record help identify what is being investigated. A support layout and clear photographs may also be useful. Tell us which information is available so we can establish any gaps and agree a suitable test scope, together with the permission and access required at the property.

Can I enquire if a building already covers the screw heads?

Yes. Explain the existing arrangement and let us assess how access could be provided safely. Keep the structure intact while that is discussed. Opening up or temporarily supporting a building requires an agreed method and competent contractors; it is preparation to plan, not something to do merely to obtain a quotation.

What should I do with the written results?

Pass them to the person responsible for the foundation assessment, together with the original testing requirement. They can consider whether the evidence supports the proposed next step or calls for more work. Testing does not automatically replace structural design, an inspection or any formal approval required for the completed project.

Are torque monitoring and torsional testing both available?

They can be discussed as separate services, both price on application. Monitoring captures resistance during screw insertion; torsional testing applies a specified twisting load. Neither is automatically supplied with pull, compression or lateral testing. Clarify the requested service before the scope is agreed so the visit or installation includes the right work.

What happens after I ask for a testing price?

We discuss the purpose and location, then identify the test requirement and practical arrangements to include in a quotation. Any drawings or technical records can be supplied as those details are developed. Once the scope, price and site readiness are agreed, the appointment and reporting arrangements can be confirmed. At the same location on the same day, each additional compression test costs £320 extra, each additional pull, tensile or uplift test costs £160 extra, and each additional lateral test costs £155 extra. These fixed charges are for further tests of the same type; the first test of each type is priced separately.

Arrange the right test for your project

Call 01202 039753 or contact us by WhatsApp or the form above. Explain what you need to establish and the site's postcode, and we can discuss a testing quotation with the scope agreed before attendance.

For other foundation services, see the Burley overview and local concrete base installation. The national testing guide explains the wider offer, and Hampshire locations provides the county town links.