
Concrete base installation in Burley
If your Burley building needs a poured concrete base, JustBases can carry out the groundwork and install the slab. We agree the construction for its intended use, including the finished floor height, preparation and any old-base removal you need quoted.
A concrete foundation for the way you will use the building
The intended floor is an important part of choosing the foundation. You may want a solid surface for daily use, or your building may bring its own floor that needs a continuous supporting slab. We establish that arrangement with you and use the supplier's requirements to plan the concrete work.
A poured base is one connected slab rather than paving units or separate supporting pads. Its construction, edge details and any fixings should suit the building above. Explain how the space will be used and what will be kept in it, so the agreed foundation accounts for the loads and the floor finish you need.

Garage bases
Plan the slab for the garage structure and intended vehicles, including how the entrance meets the approach and where the frame needs anchoring.
Learn more: Garage bases
Workshop bases
A concrete working floor can be specified for the activities and equipment planned. Discuss fixed machinery, storage and any subsequent coating before the construction is settled.
Learn more: Workshop bases
Shed bases
Use the shed's foundation dimensions to provide the supporting area required by its floor or wall system, with a level platform ready for assembly.
Learn more: Shed bases
Log cabin foundations
Follow the cabin supplier's bearing layout and timber-to-base details, allowing its required floor construction and door position to guide the finished levels.
Learn more: Log cabin foundations
Summerhouse bases
Give the selected summerhouse its specified support and agree the shape and edge detail from the actual model plan, including corner or shaped buildings.
Learn more: Summerhouse bases
Stable foundations
Concrete can form part of a specified stable floor, with supports, thresholds and any agreed drainage or surface finish coordinated with the building design.
Learn more: Stable foundationsBrowse 74 application guides
Garden & residential
Work & modular buildings
Garages & storage
Leisure & wellness
Energy & equipment
Renewable energy
Animal & agricultural
Commercial & community
Leisure accommodation
Guide prices for concrete bases
Compare the guide footprints below with the building you have in mind. For the quotation, we establish the actual slab and the work required to reach that finished base. This lets you allow for preparation and installation together.
What affects your quotation
An existing slab to break out, excavated material to remove and the required sub-base all affect the preparation. Access determines how materials and spoil can be handled. The footprint, changes in level, formwork and final specification then determine the concrete work.
We include design-dependent details such as reinforcement, membranes, insulation, service openings and particular finishes where agreed. Tell us what is already on site and which parts of the clearance another contractor will complete, so the quotation starts from the right condition and identifies the disposal included.
Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.
Rectangular poured bases: all guide sizes
| Size | Guide price |
|---|---|
| 8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² | From £800 |
| 10' x 6' 3m x 1.8m 60 ft² / 5.57 m² | From £950 |
| 10' x 8' 3m x 2.4m 80 ft² / 7.43 m² | From £1,151 |
| 12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² | From £1,252 |
| 12' x 10' 3.6m x 3m 120 ft² / 11.15 m² | From £1,403 |
| 14' x 10' 4.2m x 3m 140 ft² / 13.01 m² | From £1,503 |
| 16' x 10' 4.8m x 3m 160 ft² / 14.86 m² | From £1,704 |
| 18' x 10' 5.4m x 3m 180 ft² / 16.72 m² | From £1,805 |
| 20' x 10' 6m x 3m 200 ft² / 18.58 m² | From £2,006 |
Corner, hexagonal and octagonal poured bases
Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.
| Size | Guide price |
|---|---|
| 7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² | From £800 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £950 |
| 9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² | From £1,151 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,252 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £810 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,237 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,599 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £1,930 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £810 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,237 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,599 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £1,930 |
No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.
Get a concrete base quotation in Burley
You can start with the purpose of the building and its postcode. A rough size or supplier link is helpful if you have one, and photographs can follow. We will work through the foundation information needed for a written price without expecting finished plans at the first contact.
Request your free quote
You can ask about a new base or replacing an old one. Tell us the project and postcode, with any details you already have.
Your enquiry
Concrete bases in Burley
The work from setting out to a usable base
The installation is planned as part of the building project, with the foundation requirements and the next contractor's timing in view. We confirm the preparation and slab details with you before arranging the work.
Set the building position and floor height
The supplier's base outline is set in the agreed position, with door orientation and nearby surfaces considered. Floor layers above the concrete need to be allowed for when fixing the top level. Any required service passages and edge details are established at this stage.
Prepare and form the base
The area is cleared or excavated within the agreed scope and prepared with the supporting construction specified for the slab. Formwork defines the outline and finished level. Required reinforcement, membranes or other agreed provisions are in place before the pour.
Complete the specified pour
Concrete is placed and finished to suit the planned use and building detail. Where it is the final floor, the required surface is part of the specification; where another floor follows, the preparation needs of that system also matter. We agree those details in advance.
Protect the slab and plan building assembly
We explain the protection and curing needed and the appropriate stages for access and loading. Confirm those arrangements with the building installer before setting the assembly date. The handover should leave you clear about what can happen next and what still needs time.
Coordinate clearance, deliveries and the finished entrance
A replacement project often involves more than one contractor. If somebody is taking down an old building, establish what they will leave behind: a bare slab, remaining floor timbers or a fully cleared site. We can then quote our part from a shared understanding and arrange any removal you want included.
For either a new or replacement base, the material route is worth discussing early. Show the entrance, the route through the garden and the work area, including any retained surfaces beside them. We can identify the practical arrangements for deliveries and handling before the installation date is agreed.
Keep the building entrance in mind when planning the surrounding area. A vehicle approach, path or later landscaping needs to relate to the finished floor level. The position of water management and any service routes can also affect the slab detail. Pass on the relevant contractor or designer's requirements while the work can still be coordinated.
Once the base is ready for its next stage, make sure the building supplier has the agreed dimensions and curing programme. Any work that needs to happen before their assembly, such as specified service provisions, should have an identified contractor and date. That makes the foundation handover a useful part of the whole programme.
Choosing the building and checking its requirements
For an oak-framed building, OakCraft is a local maker offering garden rooms and garages, based at Holmsley Mill, Lyndhurst Road, Burley, BH24 4HY. Ask your chosen maker for the foundation requirements as well as the building design. Bearing positions, floor arrangements and anchoring details help establish exactly what the concrete work must provide.
The New Forest National Park planning service has a property checker for deciding where to send a planning enquiry about the building. Enter the property details to establish the relevant authority. The property map can also help you find planning history and relevant boundary information.
Building-control requirements are considered separately from planning; the Park's explanation directs these to the relevant council, including New Forest District Council for its area. Contact JustBases whenever you are ready to discuss the foundation. Confirmed building requirements can then be passed on before the slab's position and construction are agreed.
Burley and neighbouring communities
Ask us about a concrete base in Burley village, Burley Street, the residential area around Burley Lawn, Bisterne Close, Mill Lane, Shappen and Moorhill Road, Coach Hill and Vereley, or the Castle Hill Lane and Burley Beacon area. Nearby locations include Holmsley and Wootton.
We also welcome enquiries from Bransgore, Thorney Hill, Neacroft, Godwinscroft, Beckley, Hinton and Waterditch; from Bisterne, Sandford, Crow, Crow Hill, Hightown and Ringwood; and from the Brockenhurst and Lyndhurst areas. Send the full property details so we can confirm the proposed work and travel arrangements.
BH24 includes Burley and Ringwood addresses, with BH23 examples around Bransgore, BH25 around Wootton, SO42 around Brockenhurst and SO43 around Lyndhurst. These examples help describe the area without promising availability for every address in a district. Include the full postcode and any different site entrance when arranging access.
Feedback on Craig’s earlier work
"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
Concrete base FAQs
Can you prepare a new site as well as replace an old base?
Yes, we can discuss either starting point. Tell us what is currently in the proposed area and what building will go there. Preparation, removal and disposal are quoted as agreed parts of the job, together with the new slab construction. A photo helps establish the condition you expect us to start from.
How far can I get with a quote before ordering the building?
You can discuss the likely method and guide budget from the intended use, postcode and approximate footprint. Selecting the building then gives us the supplier's actual foundation requirements for the final scope. It is useful to agree the base and curing programme before you commit to the supplier's delivery date.
Which cabin dimensions matter for the foundation?
The foundation plan should show the area and bearing arrangement the cabin requires. Its roof dimensions or nominal model name may describe something different. Pass on the current supplier drawing so the slab outline, floor support and relevant edges can be agreed from the actual construction detail.
Can the garage base be coordinated with my drive?
Yes. Show us the proposed approach and explain how you want to use the garage. The doorway, slab height and surrounding levels need to be considered with the building supplier's threshold detail and any water-management requirements. Those decisions are made before the concrete is set out and poured.
Can I use the slab as a workshop floor?
An exposed concrete floor can be included in the agreed design. Describe the intended work, stored items and equipment, as well as any finish or coating you plan to add. A machine with particular loading or anchoring requirements needs that information included when the foundation is specified.
How do you decide whether to remove the existing concrete?
We need to understand whether it can provide the required foundation for the next building. That includes its condition and construction as well as its size and position. If replacement is agreed, the new level and preparation can be planned alongside breaking out and disposal so the complete job is quoted.
Should the old building be taken down before you quote?
Not necessarily. You can send photos and describe the intended clearance so we can discuss the project while it is still standing. Before work is scheduled, agree who removes the structure, its floor and any remaining foundation. The quotation can then state what is included in our preparation.
What if the proposed base is some distance from the entrance?
Show the full access route and any places where handling materials may be restricted. The distance, turns, steps and available working space help us discuss a practical installation method. We will clarify any preparation or access arrangements needed before the visit rather than expecting a detailed survey with your first enquiry.
Can membranes, insulation and services be allowed for?
They can be included as specified parts of the floor and foundation arrangement. The relevant designer, supplier and trades should establish the details and positions before concreting. We can then quote our agreed provisions and distinguish them from service connections or floor work that another contractor will complete.
What determines the timing between pouring and using the base?
The specified concrete, site conditions and intended loading all inform the curing and handover advice. The surface may be ready for one level of access before it is ready for the building or full use. We will discuss the appropriate programme, including any protection needed after the pour, before you arrange subsequent work.
Where do I check permission for a Burley garden building?
Start with the actual property on the National Park planning service's checker and seek advice from the relevant authority about the proposal. Building regulations are a separate council matter. You can speak to us about the base while those checks are being made, then provide any confirmed requirements that affect the foundation.
Can you discuss another foundation if concrete is not the best fit?
Yes. A building's own floor and supporting frame may allow another method, while a solid working floor can make concrete useful. The Burley overview explains the available options, and the local screw installation page covers that framed alternative. We can discuss the building and intended use before you choose the foundation.
Talk through your Burley base
Call 01202 039753, use WhatsApp or send the form above with your project and postcode. We can discuss the base you need and establish the work to include in a written quotation.
Our Burley overview explains the range of foundations, with ground screw installation available for suitable framed buildings. There is also a separate Burley testing service. See the concrete base guide or Hampshire service areas for further information.
