
Ground screw installation in Crewkerne
We install ground screw foundations in Crewkerne for compatible framed buildings. The work can provide supports ready for a frame by others, or include the stated timber frame, with other frame arrangements individually quoted.
Ground screws and frame options for your building
For a suitable building, ground screws provide support at individual positions instead of a concrete slab across the whole footprint. That can reduce excavation and the material brought through the garden. A screw foundation also avoids a full poured-slab curing period, with the next construction stage arranged once the supports and connections are ready.
The building and its floor need to work with those support positions. Loads travel through the floor or frame and its connections into the screws, then into the ground. We discuss that construction with the building requirements so the supporting work and frame supply are clear.
Installed screws for a frame by others
Your building company may supply its structural floor and supporting frame. We can quote installed screws for that arrangement, with positions, heights and connections coordinated with the supplier. The shed and garden room guides explain the foundation choices for those buildings.
Screws with the stated timber frame
The timber-frame package adds the frame described in that option to the screw installation. It needs to suit the floor requirements of the selected building, including a summerhouse or log cabin where that construction is appropriate. Check what remains in the building supplier's own floor package.
Bespoke timber or steel frames
If the frame differs from the stated timber package, we discuss it as individually quoted work. The supporting members, connection details and supply responsibilities are established for the project before installation is arranged.
Learn more: Bespoke timber or steel framesBrowse 74 application guides
Garden & residential
Work & modular buildings
Garages & storage
Leisure & wellness
Energy & equipment
Renewable energy
Animal & agricultural
Commercial & community
Leisure accommodation
Ground screw prices in Crewkerne
Compare the installed-screws guide with the screws-and-timber-frame guide according to who will supply the frame. A quotation for supports ready for someone else's frame has a different handover from a quotation that includes our stated timber frame.
The actual price follows the building's support requirements and the installation work being commissioned. We consider preparation, access to the positions, finished support heights and connections, with bespoke or steel frames priced separately. Any testing or insertion monitoring needed is specifically agreed in its own scope.
Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.
| Building size | Installed ground screwsFrame by others | Installed screws + timber frame |
|---|---|---|
| 8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² | From £1,246 | From £1,742 |
| 10' x 8' 3m x 2.4m 80 ft² / 7.43 m² | From £1,351 | From £1,847 |
| 12' x 10' 3.6m x 3m 120 ft² / 11.15 m² | From £1,478 | From £1,953 |
| 16' x 10' 4.8m x 3m 160 ft² / 14.86 m² | From £1,583 | From £2,164 |
| 20' x 10' 6m x 3m 200 ft² / 18.58 m² | From £1,689 | From £2,586 |
No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.
Request a ground screw installation quote
Tell us the postcode and the building's intended use. A rough size and any available supplier link help the discussion, but an outline is enough to begin. We can explain what details will be needed to confirm the foundation and frame work as the project develops.
Craig is available through the form, WhatsApp or 01202 039753. Send photos or drawings if convenient; they are optional for the first enquiry.
Request your free quote
Start with the building you have in mind and where it will stand.
Your enquiry
Ground screw installation in Crewkerne
How we plan and install the supports
Before the screws are installed, we establish how the building and foundation will join. The work is then set out for that arrangement, with preparation and handover responsibilities identified in the quotation.

Confirm the floor, support positions and height
We review the building's bearing requirements and proposed floor arrangement. The support layout, loads, connections and site assessment inform the screw specification. We also agree the finished height and the frame or other work to be supplied.

Set out and install the screw foundation
The agreed support positions are marked out and the working area prepared for the installation. Known services and obstructions need consideration before the screws are installed to the established specification. Any commissioned monitoring or tests are coordinated with the relevant stage.

Complete the agreed frame and handover
The quoted frame and connections are completed where included. For a frame by others, the installed support handover follows the requirements agreed with that provider. The next construction stage and any installation records being supplied are discussed before the building follows.
Preparing the position and access
Describe the route to the proposed building and the space available to work around its supports. Gates, steps and changes in level can affect the practical arrangements. Photos are useful for explaining the site, and we can discuss any further assessment needed to plan installation.
Tell us about existing paving or a base, and share what is known about buried services or other construction in the area. Clearance or openings needed for the screw positions should be agreed before work starts, including who carries out any removal or reinstatement.
Ground screw testing in Crewkerne
If your foundation assessment calls for testing, discuss when that evidence is needed while planning the installation. The Crewkerne testing service explains standalone tests, including suitable screws fitted by others.
Insertion torque monitoring
Monitoring records resistance to turning as a screw is installed. Ask about it while planning the installation so the required records can be agreed. It is price on application, not automatically included, and any use of the readings to calculate capacity needs an applicable, justified method.
Specialist torsional testing
A torsional test applies an agreed twisting load to investigate rotational response. It is a separate price-on-application service, specifically arranged for the required assessment. It is distinct from both insertion monitoring and physical pull, compression or lateral testing.
Planning your building and foundation
For a Crewkerne property, Somerset Council's planning service provides application records, with planning advice for the proposal and Somerset Building Control for regulations. Nearby Dorset addresses, including South Perrott and Mosterton, use Dorset's services. You can discuss the foundation while obtaining advice for the actual property.
Areas we cover around Crewkerne
We welcome enquiries from Crewkerne town centre and the streets around Severalls, Kithill and Park View, Ashlands and North Street, Southmead, Henhayes, Blacknell Lane and Yeovil Road.
Nearby places include Misterton, Hewish, Clapton, Woolminstone, Roundham, Henley, Wayford, Haselbury Plucknett and North Perrott.
Enquiries are also welcome from Merriott, Hinton St George, Lopen, Seavington St Mary, Seavington St Michael, South Petherton, Over Stratton, South Harp, Yeabridge, Wigborough, Compton Durville, East Lambrook and Shepton Beauchamp.
The surrounding area also includes West Chinnock, Middle Chinnock, East Chinnock, Chiselborough, Norton sub Hamdon, Stoke sub Hamdon, Montacute, Odcombe, West Coker and Hardington Mandeville.
On the Ilminster and Winsham side, contact us from Dinnington, Cudworth, Chillington, Kingstone, Allowenshay, Ludney, Dowlish Wake, Knowle St Giles, Cricket St Thomas, Chaffcombe, Winsham and Ilminster.
We also consider nearby Dorset enquiries from Seaborough, South Perrott, Mosterton, Chedington, Drimpton, Broadwindsor, Burstock and Thorncombe.
Useful postcode examples are TA18 around Crewkerne, TA16 around Merriott, TA17 around Hinton St George, TA13 around South Petherton, TA19 around the Seavingtons, TA20 around Winsham and Thorncombe, BA22 around East Chinnock and DT8 around Mosterton and Broadwindsor. Give us the full postcode and service required so we can confirm the arrangements and travel for the actual site.
Feedback on Craig’s earlier work
Feedback on Craig’s earlier groundwork and customer service.
"Craig and the team are absolutely fantastic. From courtesy, to standard of work, to tidiness — everything exceeded expectations. The job was arranged, booked and done extremely quickly and we are very happy with the results. Nothing was too much trouble, and communication was easy."
"Craig and his crew were excellent from the first communication, quote, timing of work and quality of work. Highly recommended."
Ground screw installation questions
What is the practical benefit of screw supports for a framed building?
They can support a compatible floor at selected positions with less excavation across the building footprint. That can reduce the spoil and bulk materials involved in forming the foundation. There is also no full concrete slab to cure in this arrangement. The building's floor, support requirements and the site assessment establish whether screws are suitable for the project.
Can I order screws when the building supplier provides the frame?
Yes. We can quote installed screws ready for a frame supplied and fitted by others. That scope needs the frame provider's bearing and connection requirements, with finished support levels confirmed before installation. Frame supply and fitting then remain with the provider identified in the quotation.
What is included with the stated timber-frame option?
It combines the installed screws with the timber supporting frame described in that package. The chosen building still needs its appropriate floor construction and connections, so compare the package description with the supplier's requirements. The written quotation confirms the frame and foundation work included for the particular installation, including any agreed preparation.
Can steel or a bespoke frame be discussed?
Yes. Steel and non-standard timber arrangements require an individual quotation. Their dimensions and construction need to suit the building's loads and the connections at the screw heads. Tell us what frame is proposed, or whether you would like it considered with the foundation, and we can establish the information needed to agree that scope.
How do the ground screws support the building?
The floor or frame receives the building's loads and transfers them through its connections to the screw supports, which carry them into the ground. The bearing positions and connections are therefore part of the foundation arrangement. They need to match the structural floor being installed, with responsibilities clear where different companies supply the frame and screws.
Who establishes the support layout and screw specification?
The building's requirements identify the loads and positions needing support. Those are considered with the screw system and site assessment when establishing the foundation specification. Required design information, connection details and any testing are agreed before installation. You can begin by describing the building, then provide the supplier's foundation details as they become available.
What site information helps with services, old bases and preparation?
Explain what is on the proposed footprint and pass on available information about services or previous construction beneath it. An existing slab or other obstruction may need assessment as part of planning access to the screw positions. We agree the necessary preparation and removal responsibilities before installation; you do not need to expose services to make the enquiry.
What do you need to know about the route to the working area?
Tell us how the proposed foundation can be reached and mention gates, steps or other restrictions. Working space beside the support positions also matters. A few photographs can help us understand the route and discuss what preparation or further inspection is needed. The practical arrangements are confirmed for the work being quoted.
How is the floor and entrance height agreed?
We consider the frame depth and complete floor above the supports together with the intended doorway and garden approach. Show the adjoining level and any planned changes outside. That allows the support heights and any separate steps or surrounding work to be coordinated with the building before the foundation is installed.
What is handed over to the building supplier after installation?
That follows the commissioned package: installed supports for a frame by others, or the agreed screws and supplied frame. The supplier needs to know the bearing arrangement and what connections remain for their work. Discuss those requirements while planning installation so the completed foundation, any agreed records and the next assembly stage fit together.
Can a physical test be requested alongside the foundation work?
Yes. If the project needs loading evidence, discuss the requirement before the relevant work is arranged. Physical pull-out, compression and lateral tests answer different questions, with positions, loading and acceptance requirements agreed for the assessment. They are separately scoped and reported, and can also be commissioned through the standalone testing service.
How do insertion monitoring and a torsional test differ?
Insertion monitoring records turning resistance during installation. A specialist torsional test applies a twisting load to investigate the installed screw's response. Both services are separately price on application and must be expressly agreed. A recorded insertion reading is not itself a physical pull, downward or lateral test, and any derived load assessment needs a justified basis for the actual system and project.
How do screw life and the installation guarantee differ?
An expected product life concerns the correctly specified hot-dip galvanised screw, which may last 50 years or more depending on ground conditions and correct installation. The full ten-year JustBases guarantee covers our installation workmanship and the supplied screws and foundation materials, subject to the written quotation. The building's warranty and any testing results remain separate matters.
Can I begin without drawings or a final model?
Yes. The intended building and postcode are enough for an initial installation conversation. Add an approximate size or supplier link if you have one, and tell us what you already know about its floor. We can discuss the foundation options and explain what needs confirming before the support arrangement and written scope are settled.
Talk to Craig about the installation
We can help establish the ground support and frame work needed for your building, then provide a written quotation and agree the installation. Use the enquiry form, WhatsApp or 01202 039753 to start with what you know.
