A poured concrete base before the building is fitted

Concrete base installation in Fordingbridge

Get a poured concrete base installed for your Fordingbridge building. We discuss the floor you need, prepare the agreed footprint and install the slab to suit its intended use.

Concrete floors and foundations for your building

A poured base is one continuous slab. It can give you the floor on which you work, store things or park, or provide support beneath a building's separate floor system. The required surface, loading and construction are established for the way the finished space will be used.

This is different from individual paving slabs laid on a concrete or mortar bed, or separate pads supporting a frame. We can explain those choices as well, so you can discuss the right foundation with your building supplier.

Shed bases

Shed bases

Choose the shed first or tell us the sort of storage you need. Its floor and wall-support details help us establish the concrete footprint, including how the entrance will sit above the surrounding garden.

Learn more: Shed bases
Greenhouse bases

Greenhouse bases

Plan the growing space as well as the frame. A full concrete floor, paths and open growing beds require different arrangements; we discuss the chosen greenhouse's support requirements with your preferred internal layout.

Learn more: Greenhouse bases
Workshop bases

Workshop bases

A slab can create a practical working floor for benches, tools and storage. Let us know about machines and their fixings so the construction can be specified for the loads and activities planned.

Learn more: Workshop bases
Garage bases

Garage bases

The garage supplier's dimensions and fixing requirements are considered alongside vehicle use. We also agree the relationship between the new floor, the garage door and the approach from the drive.

Learn more: Garage bases
Stable foundations

Stable foundations

A stable floor needs to work with the selected building and the way it will be used and cleaned. Discuss the supplier's construction requirements, access and any separately designed drainage or surrounding yard work.

Learn more: Stable foundations
Hot tub bases

Hot tub bases

The filled tub and its users need suitable support. Send the selected model's base and loading information when you have it, with the position you want in the garden and the access around it.

Learn more: Hot tub bases
Browse 74 application guides

Concrete base prices in Fordingbridge

The concrete guides show budgeting options for rectangular and shaped poured bases. Use the approximate size while considering the project, then confirm the building's actual foundation requirements for a written quotation.

Special loading or a different construction detail may require an individual specification. We explain the work being priced, including the agreed preparation and finish, so you can compare it with the building supplier's requirements.

What affects your quotation

Excavating and preparing the footprint, supporting layers, concrete construction and shaped formwork contribute to the price. Levels, edge details and any specified membrane or reinforcement are considered when defining the work.

Access and clearance can be significant parts of the job. We allow for the agreed material handling, removal of an old base, disposal and the practical means of getting concrete into place. Additional paths, retaining work or other groundworks need their own clear scope.

Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.

Rectangular poured bases: all guide sizes
SizeGuide price
8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² From £802
10' x 6' 3m x 1.8m 60 ft² / 5.57 m² From £953
10' x 8' 3m x 2.4m 80 ft² / 7.43 m² From £1,154
12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² From £1,255
12' x 10' 3.6m x 3m 120 ft² / 11.15 m² From £1,406
14' x 10' 4.2m x 3m 140 ft² / 13.01 m² From £1,507
16' x 10' 4.8m x 3m 160 ft² / 14.86 m² From £1,709
18' x 10' 5.4m x 3m 180 ft² / 16.72 m² From £1,809
20' x 10' 6m x 3m 200 ft² / 18.58 m² From £2,011
Corner, hexagonal and octagonal poured bases

Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.

Corner
SizeGuide price
7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² From £802
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £953
9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² From £1,154
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,255
Hexagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £812
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,240
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,603
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £1,935
Octagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £812
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,240
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,603
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £1,935

No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.

Get a Fordingbridge concrete quote

Start with what the base is for and where it will be built. Craig can discuss your idea before the model or final dimensions are settled. If you already have a supplier's plan, a rough size or site photos, you can send those too.

Request your free quote

Describe the building or use you have in mind and give us the site postcode. We can discuss the details with you.

Your enquiry

Concrete bases in Fordingbridge

Please provide either an email address or a phone number.

Add site photos, video or a drawing (optional)

Upload up to 5 photos or a short video of your site to help us provide an accurate quote.

0/5 files. JPG, PNG, WebP, PDF, MP4, MOV accepted — up to 100MB each.

Free, no-obligation quote. Your details are used to respond to this enquiry; see our privacy policy.

Preparing and pouring the base

We agree the concrete work before arranging construction. This includes how it connects to the building and what needs doing on the site, with a timetable that allows the new slab to become ready for use.

Confirm the building and base outline

The selected building's instructions establish the supporting footprint. We discuss its position, finished floor level and any construction requirements, including openings or fixings that need provision in the slab.

Prepare the supporting layers

Agreed clearance and excavation are followed by formation and sub-base preparation. The outline is formed and the specified layers, membrane or reinforcement are put in place as required for the construction.

Place and finish the slab

Concrete reaches the footprint by the agreed delivery arrangement. We place it within the prepared edges and finish the surface for the intended purpose and confirmed levels.

Agree handover and loading

You receive advice on protecting the concrete as it cures and introducing loads at the right stage. Coordinate the building installer and any heavy contents with the agreed readiness dates for the actual concrete and conditions.

Agree the work around the new slab

Show us the surfaces you want to keep and the area available for working. The route through a side passage or along a drive needs consideration alongside the footprint itself. Gates, steps and the distance from a delivery point help us assess the handling and placement arrangements.

An existing base is worth discussing before deciding what to remove. Its size, level, condition and known construction need to be considered against the new building. If clearance is agreed, the quotation should describe what is broken out, what is taken away and any material remaining on site.

The finished entrance deserves attention while setting the slab height. Include the proposed path or driveway level, door opening and any floor layers above the concrete. Service entries should also be coordinated with the relevant installer before the pour, with specialist connections and surrounding work assigned to the appropriate people.

For a building with a suitable supported floor, ground screw installation in Fordingbridge may be another option. The town base overview also covers paving on a concrete or mortar bed and timber frames on concreted-in posts. The building requirements help establish which route to take.

Building choices and property advice near Fordingbridge

You can ask us about a base while you are comparing buildings or checking the proposed use of the property. The information below can help you obtain the details needed as the project develops.

Get the selected supplier's base instructions

Hyde Country Store, at Gorley Lynch in Hyde, Fordingbridge SP6 2QB, offers sheds and garden rooms. When selecting a building there or elsewhere, ask which floor comes with it and obtain the foundation instructions for the particular model. These let us discuss the supporting concrete and its finished height with the building details in hand.

Send planning questions to the right authority

The New Forest National Park checker helps establish whether the property is inside its planning area. New Forest District Council handles district planning outside the Park, while nearby Alderholt is in Dorset Council's area. Use the actual address when seeking authority advice.

Building control is checked separately with the relevant council, including for properties whose planning is handled by the Park. The Park's planning FAQ explains that distinction. Share any confirmed requirements affecting the base as its specification is agreed.

Fordingbridge and surrounding villages

We welcome enquiries from Fordingbridge town centre, Ashford, Bickton, Tinkers Cross, Upper Burgate and Lower Burgate, as well as Sandleheath and Alderholt. Nearby village enquiries include Rockbourne, Damerham, Whitsbury, Martin and Breamore, with Hale and Woodgreen also welcome.

Around the Forest side we discuss projects in Godshill, Hyde, Stuckton, Frogham, Blissford, Furze Hill, North Gorley and South Gorley. Enquiries are also welcome from Linwood, Mockbeggar, Rockford and Moyles Court, and towards Ibsley, Harbridge, Ellingham, Ringwood and Salisbury.

SP6 is the principal postcode district for many of these communities, with BH24 towards Ringwood and SP1 or SP2 for Salisbury addresses. Please give the full site postcode and address. We confirm the work, practical access and travel for your particular project in the quotation.

Feedback on Craig’s earlier work

"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
— Alan, ChristchurchMyBuilder · BH23 · Concrete base
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
— Paul Leister, BroadstoneMyBuilder · BH18 · 6m x 4m Concrete shed base

Fordingbridge concrete base questions

How does poured concrete differ from a paving-slab base?

The choice concerns the floor construction your building requires. If it calls for a single slab, or you want concrete to form the working surface, discuss a poured base. Paving uses separate units supported on a concrete or mortar bed, so confirm that arrangement with your supplier when considering it for the building.

Which dimensions are needed before the base is built?

The model's foundation drawing should establish the footprint and any edge, support or fixing requirements. Use approximate dimensions for an early enquiry, then obtain the supplier's final information once the building is chosen. We settle the position and finished height alongside that outline before construction.

Can I use the concrete itself as my workshop floor?

Yes, where that is the agreed floor construction for the building. Explain the work you will do and the equipment you will bring in, so the surface finish and loading can be considered. Some buildings include another floor above the slab; that arrangement should be confirmed with the supplier.

What loading information is helpful for a garage or hot tub?

For a garage, describe the vehicles and obtain the building's foundation and anchoring requirements. For a hot tub, the manufacturer's filled loading and base instructions are useful. Include any concentrated loads or unusual equipment in the discussion so the construction can be specified accordingly.

Can you price a base that is not rectangular?

Yes. Tell us the intended shape and send the building plan when available. The shaped guides provide an initial budgeting reference; the actual outline, formwork and agreed construction are used for the quotation. We also consider the access and preparation needed for the site.

Should an old concrete base always be replaced?

It needs to be assessed for the new purpose. A useful starting point is what is known about its construction, its condition and whether its size and height suit the chosen building. We can discuss inspection or further information, then identify any agreed retention, alteration or replacement in the work.

Is removing the old shed and waste included?

Include those tasks in your request if you want them priced. Clearance can involve the building, its contents, the old foundation and excavated material, so it helps to identify each part. The written quotation confirms what is to be removed and the agreed handling and disposal arrangements.

What if concrete has to travel a long way through the property?

Show us the proposed route and tell us about its length, surfaces and restrictions. The material quantities and working access help establish a practical placing method. We can consider additional handling or other delivery arrangements and make the chosen approach clear in the quotation.

How is the slab level planned when the garden changes height?

We look at the building's finished floor in relation to its entrance and surrounding levels. The amount of preparation and any separate retaining or landscaping work can then be established. Tell us what you want to meet the doorway so the base height and adjoining work are coordinated.

Will my base need reinforcement or a membrane?

Those are construction details to agree for the building, loading and site. Share any supplier or designer requirements, including the proposed floor layers. The quotation describes the specified work and any necessary preparation, so the base is built to the agreed construction.

When should I arrange the building fitter after the pour?

Arrange attendance using the readiness advice given for your slab. Concrete develops strength over time, and the appropriate timing depends on the concrete, conditions and intended loading. Tell us about any booked delivery date early, and coordinate the building and heavy contents with the handover instructions.

Can I discuss the foundation before permissions are settled?

Yes. We can talk about the proposed base while you check the building with the relevant authority. An initial enquiry can simply describe the project and postcode. Any permissions, approved dimensions or conditions that affect the work should be resolved and shared before construction starts.

Talk to JustBases about your concrete work

Phone Craig on 01202 039753 or send an enquiry using the form. The local pages below explain other foundation choices and standalone screw testing, with our Hampshire page showing the listed service towns.