A poured concrete base before the building is fitted

Concrete base installation in Glastonbury

JustBases prepares and pours concrete bases in Glastonbury for suitable sheds, garages, workshops and garden buildings. We plan the slab around what it will carry and how the floor will be used, then agree the construction, finish and handover for the building work above it.

Concrete bases for your project

A poured base forms a continuous slab, providing support across the agreed area and a solid floor surface when the building uses it that way. That can be useful for a floorless building or where the supplier specifies slab support beneath its own floor construction.

This service differs from individual paving slabs bedded on concrete or mortar, and from isolated supports beneath a raised frame. For those choices, see the Glastonbury base overview. We can discuss the method suited to the building before agreeing the concrete work.

Sheds

Sheds

A shed without its own floor can use an appropriate slab as the interior surface. If the kit includes a timber floor, its bearers still need the support the maker specifies. Establishing that arrangement helps set the required outline, edges and finish.

Learn more: Sheds
Garages

Garages

The garage model and its use inform the floor specification. Discuss vehicles, storage and the door opening, together with how the slab meets the drive. We agree the finished height before construction so the building and its approach work together.

Learn more: Garages
Workshops

Workshops

A workshop may need the slab as both foundation and working surface. Tell us about substantial equipment or storage and any floor fixings. Their loading and installation requirements can then be considered while the concrete is specified.

Learn more: Workshops
Garden rooms

Garden rooms

Where a room calls for a concrete base, coordinate its floor layers and fixing requirements with the slab. Agree which parts are supplied by JustBases and which belong to the room contractor, including the final entrance height.

Learn more: Garden rooms
Greenhouses

Greenhouses

A solid interior can be useful where the greenhouse model accepts the proposed base and anchoring arrangement. Decide whether the whole interior is to be concrete or whether the building needs supported edges around open growing areas; those are different scopes.

Learn more: Greenhouses
Browse 74 application guides

Concrete base prices in Glastonbury

The guide schedules give a starting budget for standard poured bases, including the stated rectangular and shaped options. A final price follows the building’s actual base plan and the construction needed at the site.

We describe the preparation and slab as a defined job. If other people will clear the site, supply a floor finish or carry out adjoining work, tell us so the quotation matches the part you want us to provide.

What affects your quotation

The work needed to reach sound support, form the required levels and bring materials to the footprint affects the scope. An existing base or building may need removal, and waste handling and disposal are included where agreed.

The slab specification and finish also matter. We establish any required supporting layers, membrane, reinforcement or other design-dependent detail for the intended loads and building. Irregular shapes, extra preparation and separately requested ground work are priced for that agreed construction.

Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.

Rectangular poured bases: all guide sizes
SizeGuide price
8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² From £844
10' x 6' 3m x 1.8m 60 ft² / 5.57 m² From £1,003
10' x 8' 3m x 2.4m 80 ft² / 7.43 m² From £1,215
12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² From £1,321
12' x 10' 3.6m x 3m 120 ft² / 11.15 m² From £1,480
14' x 10' 4.2m x 3m 140 ft² / 13.01 m² From £1,586
16' x 10' 4.8m x 3m 160 ft² / 14.86 m² From £1,798
18' x 10' 5.4m x 3m 180 ft² / 16.72 m² From £1,904
20' x 10' 6m x 3m 200 ft² / 18.58 m² From £2,117
Corner, hexagonal and octagonal poured bases

Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.

Corner
SizeGuide price
7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² From £844
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,003
9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² From £1,215
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,321
Hexagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £854
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,305
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,687
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £2,037
Octagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £854
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,305
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,687
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £2,037

No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.

Get a concrete base quote

Tell us the postcode and what the base is for. Approximate dimensions help if you know them. You can explain whether there is an old base to assess or remove, even if you have not chosen the final building.

A plan, supplier detail or photograph can follow when available. Use the form, call 01202 039753 or contact us on WhatsApp, and we can work through the information needed to quote.

Request your free quote

Just give us your contact details and a short description of what you want to build. We will guide you through the rest.

Your enquiry

Concrete bases in Glastonbury

Please provide either an email address or a phone number.

Add site photos, video or a drawing (optional)

Upload up to 5 photos or a short video of your site to help us provide an accurate quote.

0/5 files. JPG, PNG, WebP, PDF, MP4, MOV accepted — up to 100MB each.

Free, no-obligation quote. Your details are used to respond to this enquiry; see our privacy policy.

How we install a concrete base

We prepare for the pour from an agreed base plan and specification. The work includes the stated ground preparation and concrete construction, followed by advice for protecting and using the new slab.

Set the dimensions and finished height

We confirm the footprint, position and intended use, with the building’s bearing and fixing requirements. The top of the concrete is agreed with any floor layers above it and the proposed entrance.

Prepare the ground and specified layers

We carry out the agreed clearance and excavation, construct the specified support beneath the slab and prepare the area for concrete. Membranes, reinforcement and other details follow the agreed construction, with any removal work identified in the scope.

Form, pour and finish the base

We form the outline, place the concrete and produce the agreed finish at the required level. The edges and surface are completed for their intended role beneath the building and any later floor treatment.

Agree curing and handover

We explain the care and readiness needed for subsequent work. Assembly, drilling, finishes and heavy loading may each have their own timing. Agree the next contractor’s attendance around that advice.

Access, existing bases and finished levels

The route to the footprint is part of preparing the job. Tell us how close materials can be brought and describe any passages, steps or changes of direction beyond that point. We assess a practical handling arrangement with the space available for the work.

If you would like to build on an existing slab, its dimensions and condition are only part of the assessment. Its construction and support must suit the new use as well. Where replacement is agreed, the quotation identifies what is being broken out and removed before the new base.

Consider the completed floor height with the building supplier while the base is being planned. A floor finish or raised floor above the concrete changes where the doorway ends up. Any separately required steps, surrounding paving or drainage work should have its own clear scope and provider.

Planning a concrete base in Glastonbury

Somerset Council’s planning route uses the actual postcode to help you choose the relevant service area. Use it for the proposed building, its use and location; the conservation-area maps can help if you need to check a property designation.

Building-regulations approval is separate from planning permission. Somerset Building Control covers the former district areas for local-authority building-control enquiries. You can talk to us about the base while obtaining the advice needed for the proposal.

For a building that accepts raised support, compare Glastonbury ground screw installation. Our town overview also explains bedded paving and post-supported frames, and you can check where we work in Somerset.

Areas we cover around Glastonbury

Enquire from Glastonbury, Street and the surrounding communities below. We confirm the work and visit arrangements for your address, including travel in the written quotation.

Useful district examples are BA6 around Glastonbury, West Pennard and Meare; BA16 at Street; BA5 towards Coxley, Godney and Wells; BA4 towards North Wootton and Shepton Mallet; TA7 at Ashcott; and TA11 around Barton St David and Compton Dundon. Give the full postcode for the site so we can discuss the actual location.

For another project nearby, see Wells, Shepton Mallet or our Somerset service area.

Glastonbury and its outlying areas

The centre, Northover, Beckery, Wirral Park area, Windmill Hill area, Wearyall Hill area, Millstream, Edgarley, Havyatt, Wick, Norwood Park and Brindham.

Street, Walton and Sharpham

Street, Walton and Sharpham.

Meare, Westhay and Godney

Meare, Westhay, Oxenpill, Stileway, Upper Godney and Lower Godney.

The Pennards and West Bradley

West Pennard, Sticklynch, Coxbridge, Woodlands, Southtown area, West Bradley, Lottisham, Parbrook, East Pennard and Pylle.

Baltonsborough and Butleigh

Baltonsborough, Ham Street, Catsham, Southwood, Butleigh and Butleigh Wootton.

Coxley, Wells and nearby villages

Polsham, Coxley, Coxley Wick, Upper Coxley, Launcherley, Southway, Burcott, Wells, North Wootton and Pilton.

Wookey, Henton, Yarley, Bleadney, Worth, Henley in Wookey parish and Fenny Castle.

Ashcott and the Polden villages

Ashcott, Pedwell, Greinton, Shapwick, Catcott, Edington, Chilton Polden, Burtle, Moorlinch, Stawell, Cossington and Bawdrip.

Compton Dundon and nearby places

Compton Dundon, Littleton, Barton St David, Keinton Mandeville, Kingweston and Somerton.

Feedback on Craig’s earlier work

"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
— Alan, ChristchurchMyBuilder · BH23 · Concrete base
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
— Paul Leister, BroadstoneMyBuilder · BH18 · 6m x 4m Concrete shed base

Frequently asked questions

Useful details when planning a poured base and the work that follows it.

What work can be included before the concrete is poured?

We can quote the agreed clearance, excavation, supporting layers and forming needed for the new slab. Any old-base removal, disposal or separately specified preparation should be included expressly. Let us know what you or another contractor will do so the concrete installation begins with a clear division of work.

Should I send the building's outside size or its base plan?

An approximate building size is useful for the first conversation. Before setting out, we need the required base footprint and bearing or fixing detail for the selected model. Roof overhangs and advertised overall dimensions may not describe that footprint, so the supplier’s base plan is the useful final reference.

Is a poured base different from a paving-slab base?

Yes. A poured base is a continuous concrete slab. A paving-slab base uses individual units laid on a concrete or mortar bed over agreed preparation. Both may be considered for a building that accepts them, but the construction, finish and price scope are different.

Can the concrete be the finished floor inside my shed?

It can where the shed is designed to use that surface. Discuss the intended storage and how you will use the space so an appropriate finish can be agreed. If the shed has its own floor, we instead need to establish how it bears on the slab and what support the maker requires.

What details matter for a garage entrance?

The garage door and wall arrangement, intended vehicles and approach need to be considered together. Share the supplier’s floor requirements when available and explain the existing drive level. The slab height and threshold are agreed with the building details, including any separately required work outside the base.

How should workshop loads be allowed for?

Tell us about equipment, substantial storage and anything that needs anchoring to the floor. The relevant weights, bearing areas and fixing requirements help establish the specification. You can ask for a base while still choosing equipment; details that affect construction must be resolved before it is poured.

Can you form a shaped base for a corner building?

Yes, shaped work can be discussed using the appropriate guide as a budget starting point. The actual model’s base outline determines what is formed, including its corners and entrance. We quote the footprint, specification and preparation needed.

What if I want to keep part of an old base?

Explain what you want to retain and the building proposed above it. We consider whether the retained area can meet the required support, dimensions and levels, with further assessment where necessary. Any breaking-out, joining detail or replacement construction needs agreeing as part of the work, not assumed from the visible surface.

Will the quotation identify extra handling where access is limited?

The practical route and handling are considered when pricing the job. Describe the entry to the site and the route beyond it; photographs and measurements can help if available. We discuss the arrangement needed and include the agreed work so you understand how materials will reach the footprint.

Who agrees membranes, reinforcement and the surface finish?

They follow the building and foundation requirements, assessed support, intended loading and any relevant design information. We establish the construction to be provided and record its scope in the quotation. You are welcome to contact us before you know those technical details yourself.

When can the building and its fixings go on the concrete?

The concrete needs to be ready for the particular operation and loading. A surface suitable for careful foot access may not yet be ready for assembly, anchors, floor finishes or equipment. Follow the project’s curing and handover advice, with the building supplier’s timing coordinated accordingly.

Can the base discussion start while I check the building permissions?

Yes. Send the purpose and postcode and we can begin talking about the foundation while you obtain property advice. Somerset Council provides the current planning route and Somerset Building Control handles local-authority regulations enquiries. Requirements affecting the construction need resolving before the work, rather than before an initial conversation.

What happens next

Contact us with the building’s purpose and postcode. We can discuss the footprint and site preparation, explain what needs confirming and quote the concrete work you want.

Ask for a written quotation, call 01202 039753 or use WhatsApp. Once the scope is settled, we agree the installation arrangements and the base handover.