
Ground screw installation in Honiton
Get ground screws installed in Honiton for a suitable garden building and its supporting frame. JustBases agrees the screw foundation with the building requirements and assessed site, then installs the supports at the planned positions and heights. We offer installed screws for a frame by others or an installation including the stated timber frame.
Screw foundations for framed garden buildings
A ground screw foundation concentrates support at designed points, so a suitable raised building can be supported without excavating the whole footprint for a slab. This can mean less spoil to remove and less bulk material to bring through the garden. There is also no concrete slab that must cure before the completed foundation can be accepted for the next stage.
The building and floor transfer their loads through a suitable frame and its connections into the screws and surrounding ground. The proposed floor, frame spans and bearing positions therefore belong in the foundation planning. The supplied items and the work done by your building installer are agreed together.

Garden rooms
A room with a designed raised floor can use a compatible screw-and-frame foundation. Coordinate the support positions with its floor construction, wall loads and connection detail, including the height of the completed doorway.
Learn more: Garden rooms
Sheds
The shed's floor bearers need the bearing specified by its supplier. A structural frame can carry those loads into the screws, with the layout agreed for the floor that comes with your chosen building.
Learn more: Sheds
Summerhouses
Include the supported shape of the summerhouse, not just its main room dimensions. A veranda, porch or angled front can affect the frame and the positions at which the foundation must support it.
Learn more: Summerhouses
Log cabins
A cabin's floor and wall support lines should follow its manufacturer's requirements. Confirm the exact base plan and any designed frame beneath it before the screw positions and connections are finalised.
Learn more: Log cabins
Workshops
Consider the working contents when planning the raised floor. Machinery, benches and storage loads need to be carried by the floor and frame as well as the screws, with any special fixing requirements agreed.
Learn more: WorkshopsBrowse 74 application guides
Garden & residential
Work & modular buildings
Garages & storage
Leisure & wellness
Energy & equipment
Renewable energy
Animal & agricultural
Commercial & community
Leisure accommodation
Ground screw and frame guide prices
The two price options cover different handovers: installed ground screws ready for a frame supplied by others, or installed screws with the stated timber frame. Match that choice to what your building supplier is providing so the quotation covers the complete foundation work you need.
Final pricing considers the support layout, screw specification, ground assessment and practical access, as well as any clearance or preparation. A steel frame, bespoke timber arrangement or non-standard foundation is individually quoted. Specified testing and torque services are separate items when agreed, rather than automatic parts of a standard installation.
Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.
| Building size | Installed ground screwsFrame by others | Installed screws + timber frame |
|---|---|---|
| 8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² | From £1,266 | From £1,770 |
| 10' x 8' 3m x 2.4m 80 ft² / 7.43 m² | From £1,373 | From £1,877 |
| 12' x 10' 3.6m x 3m 120 ft² / 11.15 m² | From £1,502 | From £1,985 |
| 16' x 10' 4.8m x 3m 160 ft² / 14.86 m² | From £1,609 | From £2,199 |
| 20' x 10' 6m x 3m 200 ft² / 18.58 m² | From £1,716 | From £2,628 |
No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.
Ask Craig about your foundation
Describe the intended building and give the postcode. A supplier link or likely size helps if you have one, but you do not need to design the screw layout before calling. We can explain the frame options and the next information needed.
Use the form below, call 01202 039753, or start a WhatsApp conversation. Your written quotation will identify what JustBases installs and how it is handed over to the next stage.
Request your free quote
Just give us your contact details and a short description of what you want to build. We will guide you through the rest.
Your enquiry
Ground screw installation in Honiton
Setting out, installing and handing over
The agreed support detail guides the installation. We plan the access and preparation, set out the foundation, fit the screws and complete the specified handover for the frame and building.

Plan and mark the foundation
Confirm the building position, required support points and heights. Review the route and work area, along with known services and retained features, before marking out the foundation.

Install the agreed supports
Install the screws to the specified arrangement and check their finished positions and heights. If an obstruction affects the proposed work, agree the response with the support design before continuing.

Finish the frame arrangement
Complete the agreed timber frame or provide the installed foundation for a frame by others. Confirm readiness and any required checks so the responsible installer can proceed with the building.
Getting the site ready for installation
The foundation specification is developed from the building loads, frame design, connection detail and ground assessment. Available site information and any appropriate investigation or trial help settle the screw selection and support layout. Let us know if the building or floor specification changes while that work is being agreed.
Describe the approach to the footprint as well as the footprint itself. The narrowest opening, corners, steps and working space around the support positions affect how installation is organised. Ground screws can reduce the materials moved for a full-area base, while the chosen site still needs a suitable route and safe working area.
Share known service routes and details of previous foundations or buried work. Suitable checks are required before ground penetration. Retained trees and structures also need consideration when locating and accessing the supports; tell us about relevant restrictions or information you have.
A raised floor can be coordinated with a change in garden level where the assessed foundation and frame allow it. Finished support heights, connections, ventilation and the building entrance are planned as a whole. Ask for any associated steps, ramps or surrounding work to be identified separately in the scope.
Installation can be arranged throughout the year when access and working conditions allow the specified work to be carried out safely. The programme follows the actual preparation and site conditions. Correctly specified hot-dip galvanised screws have an expected product life of 50 years or more in suitable ground with correct installation, separate from the building supplier's warranty.
Ground screw testing in Honiton
Testing may help establish the evidence required for the foundation design or check selected installed screws. Our Honiton testing service can be commissioned alongside installation or independently, including suitable trials and other installers' screws.
Installation torque monitoring measures resistance to turning while the screw is driven. Specialist torsional testing applies a twisting load separately to examine the specified rotational response. Both are price on application, and each requires its own agreed scope. They are distinct from the directional physical tests below.
Pull testing
An upward force examines how the installed screw responds to uplift. The required loading and recorded movement follow the agreed brief for the screw and position being assessed.
Learn more: Pull testingCompression testing
A downward loading test records compression response. If an applicable agreed calculation derives compression evidence from other results instead, its method and assumptions are identified clearly as a derived assessment.
Learn more: Compression testingLateral testing
Sideways loading provides evidence for the specified horizontal requirement. Its direction, loading height and connections form part of the test arrangement, alongside the designer's movement and acceptance criteria.
Learn more: Lateral testingBuilding requirements and property checks
Obtain the floor-support instructions for the building you order. If you are still comparing timber buildings, Inside Out Buildings' Dunkeswell display is a nearby option to visit after contacting the business. The maker's detail for your selected model helps coordinate the frame and base, whether you buy there or from another supplier.
For a site in East Devon, use the council's planning advice and property/conservation information to check the building proposal. Building regulations are a separate consideration. For the Kentisbeare and Blackborough area in Mid Devon, that council's guidance provides the appropriate local route.
If you would like to weigh up a solid floor too, Honiton's base options explain the other methods. You can also check where we work in Devon for the wider listed service area.
Installation enquiries around Honiton
We welcome project enquiries from the following Honiton areas and nearby villages. Tell us the address where the base is needed so we can discuss the installation, access and travel in your written quotation.
Honiton and much of the surrounding area use EX14. Nearby addresses may use EX11, EX13, EX15 or EX10. These postcode districts help identify your site; the work and attendance are confirmed for the individual address. Ask us about a nearby place not shown here if you need advice.
- Honiton town areas: the centre, St Paul's, St Michael's, Littletown, Marlpits, Battishorne Way, Heathpark, Heathfield, Gittisham Vale and Hayne Farm.
- Close to Honiton: Combe Raleigh, Monkton, Awliscombe, Buckerell, Gittisham, Weston, Cotleigh and Offwell.
- Feniton, Payhembury and the Ottery area: Feniton, Fenny Bridges, Payhembury, Colestocks, Lower Cheriton, Tale, Upton, Talaton, Clyst Hydon, Plymtree, Alfington, Fairmile, Ottery St Mary, Metcombe, Tipton St John and Wiggaton.
- Dunkeswell and neighbouring villages: Dunkeswell, Broadhembury, Sheldon, Luppitt, Beacon, Kentisbeare and Blackborough.
- Upottery, Stockland and adjoining places: Upottery, Rawridge, Smeatharpe, Yarcombe, Stockland, Dalwood, Shute and Kilmington.
- Farway and surrounding villages: Farway, Northleigh, Southleigh, Widworthy, Wilmington, Sidbury and Sidford.
Feedback on Craig’s earlier work
Feedback on Craig’s earlier groundwork and customer service.
"Craig and the team are absolutely fantastic. From courtesy, to standard of work, to tidiness — everything exceeded expectations. The job was arranged, booked and done extremely quickly and we are very happy with the results. Nothing was too much trouble, and communication was easy."
"Craig and his crew were excellent from the first communication, quote, timing of work and quality of work. Highly recommended."
Ground screw installation questions
The points below explain how the foundation is coordinated with your building and its frame.
What makes a building suitable for a screw foundation?
It needs an accepted frame and connection arrangement that transfers the building and floor loads into the supports. The ground and practical installation conditions also need assessment. We discuss those elements together so the proposed screws, frame and building form a suitable supporting system.
Can you install screws beneath a frame provided by my building supplier?
Yes, that is an offered installation scope. We coordinate the support positions, heights and connection requirements with the frame detail. The quotation identifies where our work ends and what the frame installer must provide and check, so the two parts can be arranged in the right sequence.
What should I check about the timber-frame package?
Confirm the frame's dimensions, its structural role and the connections included for your building. Also establish what the building order already contains above it, such as floor timbers, boards or insulation. The written scope can then distinguish the supplied foundation frame from the rest of the building and floor construction.
Are steel or custom frames an option?
A suitable designed steel or bespoke frame can be considered, with its requirements and price agreed individually. We need to coordinate its loads, bearing points and screw-head connections. Share the available design when ready, and we can discuss the installation scope needed to receive it.
Who determines the required screw layout?
The support arrangement follows the building loads, frame spans and connections alongside the assessed ground conditions. Supplier or designer details help define the support positions and specification, with further investigation or testing where needed. The resulting arrangement is confirmed before the team sets out the foundation.
Can a raised foundation work where the ground changes level?
It can, where the frame and foundation are designed for the resulting support heights and loads. Tell us about the change in level so the detail can be assessed and the entrance planned with it. Any separate steps, ramp or surrounding ground work should be included where required in the agreed scope.
What access measurements are useful?
The narrowest opening and any height restriction are a useful start, along with turns, steps and the distance from a possible unloading position. Include the working area around the building. Those details let us assess the installation route and preparation; photos can help when you have them.
Can ground screws be considered when replacing an old base?
Explain the existing construction and the new building you intend to install. Old concrete, buried foundations and differing ground levels need assessment alongside the proposed support positions. We can then identify any necessary removal or preparation and confirm the revised foundation work in the quotation.
What should I tell you about services and nearby trees?
Provide any known cable or pipe routes, previous work records and relevant information about trees or restrictions. Those features need consideration before ground penetration and when arranging the support positions. You can start with what you know; the required checks and safe preparation are agreed before installation.
What happens if a support meets an obstruction?
The installation is reviewed against the agreed supporting detail. Any change to position, specification or preparation must remain suitable for the frame and loads, so the appropriate response is agreed before proceeding. Additional work and its effect on the scope are discussed before it proceeds.
How is the floor height coordinated with the garden?
Use the finished building floor, not just the screw-head level, to plan the entrance and surrounding work. Frame depth, floor layers and the building's ventilation requirements all contribute to the arrangement. We agree the support levels and identify any separate access or landscaping work needed around them.
When can the building installer follow the screw installation?
Once the specified foundation is complete, checked and accepted for the next operation, there is no poured-concrete slab curing period to wait through. The handover still needs coordination with whoever supplies and fixes the frame or building. Agree that sequence and the practical dates before fixing delivery arrangements.
Are tests and torque records included in the installation price?
They are provided where separately specified and priced in the agreed work. Physical tests apply loading in the required direction. Insertion-torque monitoring records turning resistance during driving, while specialist torsional testing examines response to an applied twist. Both torque services are price on application, with their purposes and records agreed beforehand. At the same location on the same day, each additional compression test costs £320 extra, each additional pull, tensile or uplift test costs £160 extra, and each additional lateral test costs £155 extra. These fixed charges are for further tests of the same type; the first test of each type is priced separately.
Do I need detailed plans before asking about ground screws?
No. An outline of the building or use and the site postcode are enough for an initial discussion. A likely size or model link is helpful if available. We can then explain what support, site and supplier information is needed to finalise the foundation and its quotation.
Get a Honiton ground screw quote
Send your foundation enquiry with the building idea and postcode. We can discuss the support and frame arrangement, answer the practical questions and agree a written installation price.
