A poured concrete base before the building is fitted

Concrete base installation in Ilminster

A poured concrete base can give your Ilminster building a continuous floor and supporting footprint. JustBases undertakes the agreed preparation, pouring and finishing, with the construction matched to the building and its intended use.

Concrete bases for your project

Choose the base around the floor you want to end up with. A continuous poured construction can support the building and serve as its floor, or sit beneath the floor layers specified for it. The supplier’s foundation details establish how the building meets that base.

Garages

Garages

The concrete floor must suit the planned vehicle use and the garage’s support and fixing requirements. We also discuss the door opening and how the finished level meets the approach. Share the supplier’s base detail when available so those decisions can be coordinated before work.

Learn more: Garages
Workshops

Workshops

A workshop may need a durable working floor beneath equipment and storage. Explain how the space will be used and identify any known concentrated loads. The base specification and finish need to account for that use alongside the building’s structure.

Learn more: Workshops
Sheds

Sheds

For a shed needing a continuous base, we agree the required footprint and the surface it will stand on. A supplied shed floor is also part of the discussion, so the base fits the maker’s instructions. The doorway and any later floor finish help establish the level.

Learn more: Sheds
Garden rooms

Garden rooms

The room supplier’s floor construction can affect the height and details of the concrete beneath it. We can discuss the base before the order is final, then confirm the required plan and levels. Tell us about any specified floor layers or threshold arrangement.

Learn more: Garden rooms
Summerhouses

Summerhouses

The base outline should follow the summerhouse’s actual foundation plan, including a shaped footprint where required. Its supplied floor and entrance need to work with the finished concrete. We agree the preparation and construction that make it ready for assembly.

Learn more: Summerhouses
Log cabins

Log cabins

A cabin’s wall and bearer requirements help define the concrete support. Use the manufacturer’s base instructions to coordinate the footprint, fixings and floor arrangement.

Learn more: Log cabins
Browse 74 application guides

Concrete base prices in Ilminster

Use the rectangular, corner, hexagonal and octagonal guides to begin budgeting for a poured base. The exact manufacturer’s outline and the construction needed for the intended use are confirmed for the quotation.

What affects your quotation

The preparation can include clearance, excavation, taking out an old base and disposal of material. Site access and finished levels also influence the work. Any specified reinforcement, membrane or other construction detail follows the project requirements. We identify the agreed base and site tasks in writing, including work being arranged separately.

Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.

Rectangular poured bases: all guide sizes
SizeGuide price
8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² From £849
10' x 6' 3m x 1.8m 60 ft² / 5.57 m² From £1,009
10' x 8' 3m x 2.4m 80 ft² / 7.43 m² From £1,222
12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² From £1,329
12' x 10' 3.6m x 3m 120 ft² / 11.15 m² From £1,489
14' x 10' 4.2m x 3m 140 ft² / 13.01 m² From £1,596
16' x 10' 4.8m x 3m 160 ft² / 14.86 m² From £1,809
18' x 10' 5.4m x 3m 180 ft² / 16.72 m² From £1,916
20' x 10' 6m x 3m 200 ft² / 18.58 m² From £2,129
Corner, hexagonal and octagonal poured bases

Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.

Corner
SizeGuide price
7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² From £849
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,009
9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² From £1,222
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,329
Hexagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £859
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,313
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,697
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £2,049
Octagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £859
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,313
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,697
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £2,049

No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.

Get a concrete base quote

Start with the building you are planning and its postcode. Give an approximate base size if available; photographs and the manufacturer’s plan can be added when you have them. We can discuss what is needed to turn that outline into an agreed installation.

Use the form, call 01202 039753 or send a WhatsApp enquiry. There is no need to have a finished technical specification before speaking to us.

Request your free quote

Tell us what needs a concrete base and where it will stand.

Your enquiry

Concrete bases in Ilminster

Please provide either an email address or a phone number.

Add site photos, video or a drawing (optional)

Upload up to 5 photos or a short video of your site to help us provide an accurate quote.

0/5 files. JPG, PNG, WebP, PDF, MP4, MOV accepted — up to 100MB each.

Free, no-obligation quote. Your details are used to respond to this enquiry; see our privacy policy.

How we install a concrete base

The required footprint and floor height

We establish the base dimensions from the building requirements and agree the finished level. The proposed doorway, surrounding surfaces and any floor layers above the concrete are considered at this stage. Those details give the setting out and preparation a clear basis.

Preparing the agreed construction

The work area is prepared to the quoted scope, including any agreed removal and excavation. Sub-base, formwork and the required construction details are arranged for the specified base. Any changes needed after site assessment are clarified before the relevant work proceeds.

Pouring and finishing

We place and finish the concrete for the required use. Openings, edges and any detail needed by the building installer should already be agreed, so the finished base can receive the intended building or floor system. The quotation makes the surface and construction scope clear.

Curing and handing over the base

The concrete needs suitable protection and time to reach readiness for the loads that follow. We explain the agreed curing and handover arrangements, including when building assembly or equipment loading can proceed. Plan the next contractor’s work around that advice.

Access, existing bases and finished levels

Please tell us whether another contractor is clearing the position or preparing any part of the site. That helps define where the concrete installation work starts and who is dealing with removed material.

We also need to understand how the work area is reached. Gates, steps and the available route can affect the practical arrangements for bringing materials in and taking waste out. Show the proposed position and approach in photographs if that is convenient.

At the building entrance, agree the complete finished floor height, including any layers above the concrete. The base and the surrounding approach need to work with the supplier’s door detail.

Planning a concrete base in Ilminster

For an Ilminster property, Somerset Council’s permission guidance provides the route for a building-proposal question. The council’s conservation-area information is useful if the address has a designation to check.

Somerset Building Control deals with the separate regulations process. You can discuss the foundation with us while the proposal’s requirements are being established. For a site outside the local authority area, use the council finder to direct a permission enquiry to the correct authority.

Areas we cover around Ilminster

In Ilminster, we welcome enquiries from the centre and the Winterhay, Winterhay Green, Winterhay Lane, Canal Way, Station Road, Listers Hill, Shudrick Lane, Blackdown View, The Beacon and Rose Mills areas, and homes near Herne Hill. Nearby locations include Ashwell, Dillington, Knott Oak, Dowlish Ford, Moolham and Swake.

Around Ilton, Ashill, Broadway and Horton, enquiries are welcome from Ilton, Ilford, Ashford, Hurcott, Ashill, Rapps, Stewley, the Capland Lane area, Broadway, Horton and Horton Cross. We also consider work in Donyatt, Crock Street, Peasmarsh, Sea and Whitney Bottom.

The surrounding area includes Whitelackington, Atherstone, Stocklinch, Puckington, Barrington, Shepton Beauchamp, Seavington St Mary, Seavington St Michael, Lopen, South Petherton and Over Stratton.

Other nearby enquiry locations include Dowlish Wake, Kingstone, Allowenshay, Chillington, Higher Chillington, Lower Chillington, Cricket Malherbie, Knowle St Giles, Chaffcombe, Dinnington, Hinton St George, Merriott, Cudworth, Cricket St Thomas, Winsham, Combe St Nicholas, Buckland St Mary, Chard and Crewkerne. You can also ask about work in Isle Abbotts, Isle Brewers, Beercrocombe and Hatch Beauchamp.

TA19, TA13, TA17, TA18, TA20 and TA3 are useful postcode districts around this enquiry area. Send your full postcode and the intended work so we can confirm the site arrangements, availability and quotation.

Feedback on Craig’s earlier work

"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
— Alan, ChristchurchMyBuilder · BH23 · Concrete base
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
— Paul Leister, BroadstoneMyBuilder · BH18 · 6m x 4m Concrete shed base

Frequently asked questions

When does a building need a continuous concrete base?

It may be the appropriate arrangement where the building needs a solid floor or support across its footprint. The supplier’s requirements and the way you intend to use the building help establish that. We can discuss the required construction and finish, including any flooring above the concrete, before quoting the base work.

Can you install a shaped footprint as well as a rectangle?

Yes, the guide includes corner, hexagonal and octagonal bases as well as rectangles. For a shaped building, the manufacturer’s exact base plan is particularly useful when confirming the dimensions and formwork. Send the outline you have, even if approximate at first, so the quotation can be developed around the actual footprint.

Can I enquire before the manufacturer sends a base plan?

Yes. Explain the intended building and postcode, adding the size if known. We can begin discussing the floor and likely work while you obtain the supplier’s information. Before installation, the required base dimensions, support details and any relevant entrance or floor requirements need to be confirmed.

What access information helps plan the concrete work?

Describe how the proposed base position is reached and mention any gates, steps or other restrictions you know about. Photographs can show the route and working space clearly. We use those details to discuss a practical approach and any further assessment needed.

Will an old base have to come out?

That decision follows its assessment against the new building’s requirements. An existing base might need retaining, altering or removing, depending on its construction, condition, size and level. Let us know what is there and what you hope to use it for. The agreed preparation and disposal tasks should be clear in the written quotation.

Can the concrete also be the floor I use inside?

It can be specified as the working surface where appropriate, or form the base beneath another floor system. Tell us the intended use and whether the supplier specifies insulation, damp protection or additional floor layers. The required construction, surface finish and height are then considered together for the project.

How are workshop equipment or vehicle loads allowed for?

The intended loading needs to be known when the base construction is specified. Pass on the relevant equipment or vehicle information and any requirements supplied by the building designer. This helps establish the appropriate slab and finish. The workshop and garage guides describe these applications separately.

How is the doorway height settled?

Consider the supplier’s entrance detail alongside the complete floor build-up and the approach outside. We agree the concrete level to fit that arrangement. If another contractor is adding flooring or a threshold, their requirements need coordinating with the base so the building installer can proceed from a clear finished level.

When should openings or service entries be arranged?

Raise any required entries or openings while the construction details are being settled. Their positions and responsibilities should be coordinated with the building supplier and the appropriate trades before concrete is placed.

What happens after the concrete has been poured?

The base needs the agreed curing and protection before it receives the intended loads. At handover, confirm the advice for assembly and any equipment or construction work that will follow. Readiness depends on the specified concrete and the conditions and loads relevant to the job, so arrange the building work around the agreed programme.

Which site tasks should the written quotation identify?

It should explain the preparation and base construction we are undertaking, together with any agreed removal, disposal or additional work. Access and level requirements may affect that scope.

Who can help check the proposed building’s permissions?

Somerset Council provides the planning route for Ilminster, with building control handling the separate regulations requirements. Use the actual property and building proposal when asking for advice.

What happens next

After the first discussion, we clarify the building’s base requirements and the work at the site. The quotation sets out the agreed preparation and concrete installation, with handover and readiness considered before the building programme is fixed.

Request a concrete quote, call 01202 039753 or message Craig on WhatsApp.