Concrete bases for your project

Concrete can give you a firm floor inside as well as a foundation for the building. It can also support a separate floor system where the maker specifies additional construction above the slab. We establish the role of the concrete before quoting its preparation and finish.

A poured base is continuous. Individual paving slabs on a concrete or mortar bed are another service, and suitable raised frames can be carried on posts or ground screws. The Melksham overview explains those alternatives if you are choosing between methods.

Garages

Garages

A garage base has to accommodate its structure, fixings and intended vehicle use. We discuss those requirements with the floor surface and entrance detail, so the concrete can be prepared for the garage being supplied.

Learn more: Garages
Workshops

Workshops

The useful floor area needs to suit the work taking place inside. Include information about substantial equipment or stored loads when discussing the base. It helps establish the construction and finish for the workshop you want to use.

Learn more: Workshops
Garden rooms

Garden rooms

The room’s supplier may provide an insulated floor system above the concrete. Its construction and wall support affect the base detail below. Confirm that floor arrangement when settling the slab level and required edges.

Learn more: Garden rooms
Sheds

Sheds

A concrete base can create a solid surface for a suitable shed, including one supplied without an interior floor. Where the kit includes a floor, the maker’s bearing and fixing requirements establish how it sits on the base.

Learn more: Sheds
Log cabins

Log cabins

Use the cabin manufacturer’s foundation plan to establish where its walls and floor components need support. The required outline and floor height can then be confirmed for the concrete installation.

Learn more: Log cabins
Summerhouses

Summerhouses

For a shaped summerhouse, obtain the actual foundation outline. The selected building’s floor and doorway help determine what concrete work is needed.

Learn more: Summerhouses
Browse 74 application guides

Concrete base prices in Melksham

There are guide schedules for rectangular, corner, hexagonal and octagonal poured bases. They help you budget for the size and shape you are considering. The final price follows the selected building’s actual base plan and the construction required at the site.

What affects your quotation

The work may include clearance, excavation and the supporting construction before concrete is placed. Material access, finished levels, any old-base removal and disposal need to be allowed for. Membranes, reinforcement and other details follow the specification for the project. We identify these tasks and any preparation supplied by others in the written quote.

Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.

Rectangular poured bases: all guide sizes
SizeGuide price
8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² From £833
10' x 6' 3m x 1.8m 60 ft² / 5.57 m² From £991
10' x 8' 3m x 2.4m 80 ft² / 7.43 m² From £1,200
12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² From £1,305
12' x 10' 3.6m x 3m 120 ft² / 11.15 m² From £1,462
14' x 10' 4.2m x 3m 140 ft² / 13.01 m² From £1,567
16' x 10' 4.8m x 3m 160 ft² / 14.86 m² From £1,776
18' x 10' 5.4m x 3m 180 ft² / 16.72 m² From £1,881
20' x 10' 6m x 3m 200 ft² / 18.58 m² From £2,091
Corner, hexagonal and octagonal poured bases

Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.

Corner
SizeGuide price
7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² From £833
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £991
9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² From £1,200
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,305
Hexagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £844
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,289
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,666
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £2,012
Octagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £844
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,289
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,666
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £2,012

No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.

Get a concrete base quote

Describe the building or use you have in mind and give the site postcode. If you know a rough size, include it; if not, we can still discuss the project. A supplier drawing or photographs can be sent when available.

Use the form, call 01202 039753 or message Craig on WhatsApp. We will clarify the work you want priced, including any preparation you need us to undertake.

Request your free quote

Tell us what you want the concrete base to support.

Your enquiry

Concrete bases in Melksham

Please provide either an email address or a phone number.

Add site photos, video or a drawing (optional)

Upload up to 5 photos or a short video of your site to help us provide an accurate quote.

0/5 files. JPG, PNG, WebP, PDF, MP4, MOV accepted — up to 100MB each.

Free, no-obligation quote. Your details are used to respond to this enquiry; see our privacy policy.

How we install a concrete base

Confirming the footprint and floor height

The building requirements establish the outline to form. We confirm the top level of the concrete with any flooring above it and the entrance arrangement.

Preparing the agreed construction

The quotation sets out the clearance and ground preparation we are providing. We carry out those tasks and form the supporting construction, edges and any specified membrane or reinforcement ready for the pour. The construction detail is settled for the actual building and site.

Pouring and finishing

We place the concrete and finish the surface for its intended purpose. The finished base is then protected as required while it cures.

Curing and handing over

We explain when the base can receive the planned work and loads. Building assembly, floor work and heavier equipment may have different readiness requirements. Arrange those stages around the advice for the specified concrete and conditions, allowing the required protection and curing.

Access, existing bases and finished levels

Tell us how the position is reached and where there is room to work. The entry route, steps and openings affect the practical arrangements for materials and removed ground. Safe photographs can be helpful.

The proposed footprint may already contain a base or other construction. We can discuss assessment for retention or the removal needed for the new work. Check that the quoted tasks include the breaking out and disposal you want, and tell us if another contractor will leave the position prepared.

Floor height is worth settling with the building supplier before installation. Concrete below a supplied floor and concrete used directly inside can need different levels relative to the doorway. The adjoining approach and any relevant drainage detail are considered with that complete construction.

Planning a concrete base in Melksham

Check the proposed building and its use with Wiltshire Council’s planning service if you need permission advice. The property address and proposal matter to that enquiry. You can discuss our concrete work before the building’s details are final.

For the separate regulations question, GOV.UK explains the building-control application routes. If you are enquiring from farther away and are unsure of the authority, use the council finder.

Areas we cover around Melksham

Enquiries are welcome throughout Melksham, including the town centre, north, south and east Melksham, Melksham Forest, Shurnhold, Hunters Wood and The Acorns. Nearby communities include Beanacre, Berryfield, Buckley Gardens, Bowood View, Bowerhill, The Spa, Shaw, Whitley, Blackmore, Sandridge, Woodrow, Woolmore, Redstocks and Outmarsh.

We also consider work around Atworth, Purlpit, Great Chalfield, Little Chalfield, Cottles Park, Broughton Gifford, Holt, South Wraxall, Bradford Leigh, Cumberwell and Bradford-on-Avon, together with Neston, Gastard, Westwells and Corsham.

Other nearby enquiry locations include Lacock, Bowden Hill, Naish Hill, Reybridge, Lackham, Sandy Lane, Chittoe, Westbrook, Bromham, Netherstreet, St Edith’s Marsh and Hawkstreet, as well as Rowde, Poulshot, Poulshot Green and Devizes.

You can ask about work in Seend, Seend Cleeve, Sells Green, Seend Row, The Stocks, Seend Head, Inmarsh and Martinslade.

The surrounding area also includes Semington, Little Marsh, Littleton, Whaddon, Hilperton, Hilperton Marsh, Paxcroft Mead, Staverton, Trowbridge, Great Hinton, Cold Harbour, Bleet, Keevil, The Strand, Bulkington and Steeple Ashton.

SN12, SN13, SN15, SN10, BA14 and BA15 are useful district examples for this area. Give us the full site postcode and the work you need so we can confirm availability and include the practical arrangements and travel in your written quotation.

Feedback on Craig’s earlier work

"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
— Alan, ChristchurchMyBuilder · BH23 · Concrete base
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
— Paul Leister, BroadstoneMyBuilder · BH18 · 6m x 4m Concrete shed base

Frequently asked questions

What work does the concrete installation quotation describe?

It describes the continuous poured base and the preparation, construction and finish we are supplying. Agreed tasks may include clearing the position, removing an old base or taking away waste. Check that those tasks match the work you need and that anything being supplied by another contractor is identified.

What can I send if the building has not been ordered?

A description of its intended use and the postcode will start the enquiry. Add an approximate size if you have one. We can discuss concrete at that stage, then confirm the required outline and construction once the building information is available. Drawings and photos can follow later.

What changes when the building includes its own floor?

We need to know how that floor is supported and what sits between it and the concrete. The supplied system may require further floor layers, which affect the finished base height. If the concrete will be the floor you use directly, its surface and construction instead need to suit that use.

What is needed for a garage base?

The garage maker’s base and fixing requirements are considered with the vehicles it will take. The entrance level and the approach outside also need coordinating. Those details establish the concrete work to quote for the garage.

How are workshop equipment loads considered?

Tell us about substantial machinery and storage, including any loading information you have. The base specification needs to account for the proposed use along with the workshop structure. The floor finish should also suit the activities inside, so discuss what you need the completed surface to provide.

Can you pour corner and other shaped bases?

Yes, shaped bases can be discussed alongside rectangular ones. The guides include corner, hexagonal and octagonal options. Their budgeting sizes need to be checked against the selected building’s exact foundation plan before the outline and construction are agreed for installation.

How do we agree the finished height?

Start with the floor level the complete building needs, then allow for its construction above the concrete. We coordinate that with the doorway and surrounding approach.

Can another contractor prepare part of the site?

Yes, discuss the division of work when requesting the quote. We need to agree what preparation will be completed and what condition the position will be in for our installation. That includes responsibility for material left on site or taken away, so the quoted concrete work begins from a clear handover.

Can an existing concrete base be considered for retention?

It can be discussed, with its suitability assessed for the new building before it is relied on. What it previously supported may differ from the proposed requirements. We clarify whether retention, alteration or removal is appropriate and identify the resulting installation work in the written scope.

What access information helps plan the pour?

Describe the route into the work area, including gates, steps and available working space. Photographs of the approach are useful if safely available. We can discuss the practical material and waste movements from that information and clarify any further assessment required for the quoted work.

How are membrane, reinforcement and other construction details established?

They follow the requirements of the building and intended loads, with the site assessment and relevant design information. The quotation defines the construction being provided.

When can the building and equipment be placed on the new concrete?

We agree readiness for the actual loads, using the specified concrete and relevant conditions. The base needs the required curing and protection first. Follow the handover advice when arranging building assembly and equipment use, since readiness for one stage does not necessarily establish readiness for a heavier load.

What happens next

We identify the concrete base required and provide a written price for the work. With the scope settled, the preparation and pour can be arranged. Handover includes the curing and readiness advice needed before the building or its intended loads follow.