Ground screw testing in Midhurst
JustBases offers standalone ground screw testing in Midhurst, including suitable screws installed by other companies. Pull, compression and lateral tests examine different loading directions and provide recorded findings for a foundation assessment. We can discuss trial work during design or checks on an existing installation, with the programme and report agreed before attendance.
Tests for upward, downward and sideways loading
The force applied in a test needs to match the evidence being requested. We record the screw's response through the agreed loading programme, so the result can be considered against the foundation requirements.
Your responsible designer or other appointed assessor defines the required loads and acceptance criteria. We agree the practical testing around that requirement, including how the force reaches the selected screw and how the load is resisted safely.
Pull testing
An uplift test applies force upwards and records the resulting response. It gives information about the tested support under that lifting action, with the loading and movement considered together for the assessment.
Learn more: Pull testingDirect compression testing
Downward loading measures the screw's physical compression response. A value calculated from pull-test data is a different form of evidence: its method must be applicable and agreed, with the calculation basis identified rather than described as a directly measured downward test.
Learn more: Direct compression testingLateral testing
A sideways test investigates horizontal response. The specified force direction, application height and connection affect the behaviour examined, so they need to be settled with the loading requirement and practical setup.
Learn more: Lateral testingGround screw testing guide prices
Use the main-method prices below for an initial budget, then ask for a quotation for the requested programme. The actual methods, quantity, test arrangement, attendance and included reporting or project calculations define that scope. Any preparation by others is agreed before the visit.
Installation torque monitoring records turning resistance during driving. Specialist torsional testing examines a separately applied twisting load. Both are price on application and separately commissioned; a physical pull, compression or lateral test does not automatically include either.
Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.
- Pull test (tensile or uplift test)
- From £511
- Load test (compression test)
- From £1,022
- Lateral test (sideways load)
- From £501
- Installation torque monitoring
- Price on application
- Specialist torsional load test
- Price on application
Each additional test
Each extra charge applies to an additional test of the same type, at the same location on the same day. The first test of each type is priced separately.
- Pull test (tensile or uplift test)
- £160 extra
- Load test (compression test)
- £320 extra
- Lateral test (sideways load)
- £155 extra
No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.
Tell us what testing is needed
A first message can be a simple explanation of the project and postcode. If somebody has requested evidence, you can pass on their question in ordinary terms. A finished technical brief, drawing or product pack is not needed to ask about the service.
Call Craig on 01202 039753, use the form or send a WhatsApp message. We work through the test requirement and practical information with you, then provide the written scope and price for agreement.
Request your free quote
Give us your contact details and a short description of the testing you need. You can ask before the technical requirements are complete.
Your enquiry
Ground screw testing in Midhurst
Planning and carrying out the test
The agreed test connects the design requirement, safe site work and record of what was measured. We establish those parts before booking so the visit is prepared for the commissioned work.
Establish the assessment requirement
Identify the screws to be examined and settle the load direction and programme with the responsible assessor. Confirm loading stages, measurements and acceptance or stopping criteria.
Agree safe access and loading
Review the test connection, working area and means of resisting the force. Assign any enabling work or temporary support needed for an attached structure, with preparation confirmed before attendance.
Carry out the measurements
Apply the defined loading at the agreed positions and record the corresponding response. Note the relevant arrangement so the measurements can be related to the support that was tested.
Return the agreed findings
Supply recorded results, the written report and the project calculations commissioned. The assessor uses that evidence for the foundation decision against the agreed requirements.
Testing before or after installation
Choose the testing stage with the person who will use its findings. A proposed system may need a trial while the foundation is being designed; an installed arrangement may need a check before further building work. Discuss the decision and what will be available at that stage, then agree a programme that leaves time to act on the assessment.
For an existing foundation, safe loading has to be planned with the structure it supports. Tell us what remains attached, including on another installer's screws. Keep those connections intact while the work is assessed. Any necessary unloading, temporary support or access preparation is assigned to competent people before the test is booked.
What the results are for
The written findings provide a record of the commissioned test for the person assessing the foundation. They should be read with the brief: the applied loading and measured response relate to the identified support and test arrangement. Confirm the required report and any project calculations when agreeing the work.
The assessor decides how those findings meet the project's criteria and how they inform the foundation. The complete building, its design and any statutory approval remain separate responsibilities; the test report is not automatic whole-building certification. Agree the next decision with that person before proceeding with work that relies on the result.
Booking a Midhurst test
Tell us when the selected positions will be ready to examine, including any trial installation or enabling work still to be completed. We confirm the visit against that preparation. If another contractor is involved, agree how the testing stage fits its work and who can confirm site readiness.
Provide the actual site address and a contact who can arrange access to the working area. Explain any restrictions on using it and changes to the support arrangement that occur while the test is being planned. A revised requirement or changed site preparation needs review before the agreed visit proceeds.
If installation is also required, see Midhurst ground screw installation. Our Midhurst base page explains the wider foundation choices, and West Sussex service locations list other towns. You can keep the testing as a separate booking.
Testing around Midhurst
We consider test requests from Midhurst and the neighbouring places listed below. The site postcode and purpose allow the programme, safe practical arrangements and travel to be discussed for the address.
GU29 is the main local district; nearby GU28, GU27, GU30, GU31, GU33 and PO18 locations are also welcome for discussion. Ask about another adjoining site if yours is not named.
- Midhurst and its local areas: town centre, Holmbush, Carron Lane, June Lane, Bepton Road, Taylors Field and Bourne Way.
- Easebourne and adjoining communities: Easebourne, Upper Easebourne, the Dodsley Lane area, Henley, West Lavington, Woolbeding and Redford.
- Bepton, Cocking and nearby villages: Bepton, Cocking, Cocking Causeway, Heyshott, Hoyle, South Ambersham, Selham, Graffham, East Lavington, Upper Norwood and Duncton.
- Lodsworth and the Petworth area: Lodsworth, Lickfold, Bexley Hill, Halfway Bridge, Lurgashall, Hillgrove, River, Tillington, Upperton, Petworth, Hampers Green and Byworth.
- Stedham and adjoining villages: Stedham, Iping, Minsted, Tote Hill, Ingrams Green, Chithurst, Trotton, Dumpford, Elsted, Elsted Marsh, Treyford and Didling.
- Rogate and Harting: Rogate, Fyning, Terwick Common, Nyewood, South Harting, East Harting, West Harting, Rake and Hill Brow.
- Milland and Fernhurst area: Milland, Borden, Linch, Linchmere, Fernhurst, Kingsley Green, Camelsdale and Hammer.
- Nearby Downs villages: Singleton, Charlton, East Dean, West Dean and Chilgrove.
Feedback on Craig’s earlier work
Feedback on Craig’s earlier groundwork and customer service.
"Craig and the team are absolutely fantastic. From courtesy, to standard of work, to tidiness — everything exceeded expectations. The job was arranged, booked and done extremely quickly and we are very happy with the results. Nothing was too much trouble, and communication was easy."
"Craig and his crew were excellent from the first communication, quote, timing of work and quality of work. Highly recommended."
Questions about ground screw testing
These answers explain the testing request, site preparation and evidence supplied before a programme is commissioned.
Who can commission a standalone testing visit?
Homeowners, building suppliers, installers and other project teams can ask about the service. Installation does not need to be ordered with it. Explain the foundation and intended evidence, including whether the supports were supplied by another company, so the suitable test and site arrangements can be established.
Can I enquire if the requested test is not yet clear?
Yes. Tell us what the building is and why the foundation needs checking, or share the request you have received. We can explain the force directions and discuss the work. The responsible assessor defines the detailed requirement before the programme is agreed, not before the first conversation.
Why does a lateral test need a defined loading height?
The point at which the sideways force acts is part of the behaviour being examined. It should therefore relate to the check required by the design, together with the direction and connection. Those details are confirmed with the loads and criteria so the findings answer the intended question.
Who decides how the response will be judged?
The designer or other responsible assessor establishes the requirements for the foundation, including the applied loads and relevant acceptance criteria. We agree a practical test programme against those requirements. Identify that person when arranging the work so any questions about the intended evidence can be resolved before attendance.
Can testing help while I am selecting a foundation system?
A suitable trial can provide information during that decision, with its specification and position chosen for the proposed design. Tell us which choices are still open and what the assessor needs to know. The trial installation, testing and review should be planned while the findings can inform the foundation.
What if a frame is already connected to the screws?
Its existing loads and stability have to be considered with the proposed test. Describe the arrangement and show safely visible connections without altering them. Any opening-up, unloading, temporary support and reinstatement must be planned by competent people, with the responsibilities and ready condition agreed before testing.
Will a testing visit check every screw in the foundation?
The programme defines the supports to be tested and the evidence requested from them. A visit may concern selected positions, with the responsible assessor deciding what is needed for the foundation assessment. The written findings identify that scope; the test is not treated as a measurement of supports that were not loaded.
Can testing be considered without the original installation records?
Yes, start by explaining what is known about the product, installation and current use. We identify which missing details matter for the requested loading and its interpretation. Additional information or assessment may be needed before the work is confirmed, but you can enquire while those records are being sought.
When is installation torque recorded?
It is monitored while the screw is driven into position, so it needs to be specified with the installation programme. It records resistance to turning at that stage. Any use of that information to assess capacity requires an applicable justified relationship; it is distinct from a physical applied-load test and is priced on application.
What is specialist torsional testing?
It tests the response to an applied twisting action under an agreed method. That is separate from monitoring resistance during insertion and from applying sideways force. Give us the rotational requirement you have received so its setup and reporting can be discussed. The service is separately quoted on application.
What does a compression figure derived from pull data mean?
It has been calculated rather than obtained by physically applying downward load. The method and assumptions need to be appropriate to the product and project and agreed for the assessment. The report identifies that basis, while direct compression measurements come from a separately specified downward-loading test.
Can the quotation include particular written evidence?
Tell us what the assessor needs when commissioning the programme. We agree the recorded results, written test report and any project calculations within the scope. Specific additional document requirements should be identified then so the price and deliverables reflect the evidence the project is asking for.
Does testing approve the complete building?
It provides information for the assessment of the tested foundation within the agreed scope. Design acceptance and any required building approval still involve the responsible people and the complete proposal. A report of screw response does not automatically provide a structural certificate or replace those wider checks.
What do I need to settle before booking?
Confirm the testing requirement, selected positions, loading programme and criteria, safe preparation, report and quotation. The site contact should know how the work area will be ready and who completes any enabling tasks. Start the enquiry with purpose and postcode; these detailed arrangements are developed before the appointment is agreed.
What does each additional ground screw test cost?
At the same location on the same day, each additional compression test costs £320 extra, each additional pull, tensile or uplift test costs £160 extra, and each additional lateral test costs £155 extra. These fixed charges are for further tests of the same type. The first test of each type is priced separately, using the starting price for your location. The extra-test charges stay the same in every location.
Discuss the testing programme