A poured concrete base before the building is fitted

Concrete base installation in Midhurst

JustBases prepares and installs poured concrete bases in Midhurst for suitable garden buildings, garages and workshops. A continuous slab can support the building and provide its solid floor, or carry a separate floor construction. We agree the preparation, concrete detail, surface and finished level with the use and building requirements.

Concrete support and floors for your project

Choose the construction with the floor you intend to use. The concrete may remain exposed, take another finish or sit below insulation and a supplied floor. Knowing that arrangement helps establish the slab height and the work left for the building supplier.

A poured base is a continuous concrete slab. Individual paving slabs on a concrete or mortar bed, and separate pads carrying particular bearings, are other constructions with their own scope. We quote the foundation actually required by the building.

Sheds

Sheds

For a floorless model, the concrete can provide the internal walking and storage surface. If the shed has its own floor, confirm how the bearers meet the slab and where it is anchored. Both arrangements need the correct supported outline.

Learn more: Sheds
Garages

Garages

Give the intended vehicle use and the garage maker's foundation details. The structural bearings, floor and door opening must work together. An oak-framed garage can have defined post supports as well as a vehicle surface, so obtain the complete requirement before the concrete detail is agreed.

Learn more: Garages
Workshops

Workshops

Equipment and storage help determine the supporting slab and surface. Include known machine weights, bearing feet, anchor positions and intended movement through the doorway. These details allow the construction to be specified for the working floor.

Learn more: Workshops
Garden rooms

Garden rooms

Coordinate the slab with the room's wall and floor system, including insulation and any finish above it. The total floor construction affects the entrance height. The supplier's base instructions identify the bearings and edge details the concrete must provide.

Learn more: Garden rooms
Greenhouses

Greenhouses

The greenhouse needs its specified frame support and fixings, while the interior may combine open soil and hard areas. Agree the growing beds, paths and bench positions with that foundation layout before deciding how much of the area to pour.

Learn more: Greenhouses
Browse 74 application guides

Concrete base guide prices

The schedules below give budgeting prices for standard poured bases in the listed sizes and shapes. The agreed quotation confirms the construction and preparation for your building and address. Vehicle floors or substantial workshop loads can require a specification and price outside that guide.

The scope should explain the completed base and any work around it that is included. This helps you arrange the building installation and later floor work with a clear understanding of the handover.

What affects your quotation

We consider excavation and supporting preparation, exact dimensions and shape, slab specification, finish and level changes. Access for materials and waste, existing foundations or buildings to remove, disposal and making good also affect the work. Tell us which tasks you or another contractor will complete, so the written quotation identifies our agreed part.

Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.

Rectangular poured bases: all guide sizes
SizeGuide price
8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² From £846
10' x 6' 3m x 1.8m 60 ft² / 5.57 m² From £1,006
10' x 8' 3m x 2.4m 80 ft² / 7.43 m² From £1,219
12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² From £1,325
12' x 10' 3.6m x 3m 120 ft² / 11.15 m² From £1,485
14' x 10' 4.2m x 3m 140 ft² / 13.01 m² From £1,591
16' x 10' 4.8m x 3m 160 ft² / 14.86 m² From £1,804
18' x 10' 5.4m x 3m 180 ft² / 16.72 m² From £1,910
20' x 10' 6m x 3m 200 ft² / 18.58 m² From £2,123
Corner, hexagonal and octagonal poured bases

Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.

Corner
SizeGuide price
7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² From £846
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,006
9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² From £1,219
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,325
Hexagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £857
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,309
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,692
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £2,043
Octagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £857
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,309
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,692
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £2,043

No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.

Talk to us about a poured base

Call 01202 039753, send this form or message Craig on WhatsApp with the project and postcode. An approximate size is useful for the first discussion, but the final drawing and construction detail can follow.

We can discuss the foundation before you have bought the building. As its requirements are confirmed, we agree the site preparation and installation, with the work and price set out before booking.

Request your free quote

Just give us your contact details and a short description of what you want to build. We will guide you through the rest.

Your enquiry

Concrete bases in Midhurst

Please provide either an email address or a phone number.

Add site photos, video or a drawing (optional)

Upload up to 5 photos or a short video of your site to help us provide an accurate quote.

0/5 files. JPG, PNG, WebP, PDF, MP4, MOV accepted — up to 100MB each.

Free, no-obligation quote. Your details are used to respond to this enquiry; see our privacy policy.

Preparing, pouring and handing over

The base is planned as a complete construction, including what supports the concrete and what will be fitted above it. We establish those details and the practical working arrangements before the pour.

Agree the base plan

Confirm the selected building's outline, supported positions and finished height. Coordinate floor layers, the entrance and any specified edges, fixings or service entries.

Prepare the layers and edges

Complete the agreed clearance and excavation, then install and compact the required preparation. Form the base and fit the membranes or reinforcement specified for its construction.

Place and finish concrete

Pour the agreed slab using the handling arrangement planned for the site. Complete its surface and perimeter to suit the stated floor use and building detail.

Confirm protection and loading

Explain curing and protection for the new work. Agree when it can take pedestrian access, building assembly and subsequent loads, using the concrete, conditions and intended use.

Practical arrangements for the concrete work

Agree what will be ready for the concrete work, especially when another contractor is clearing the position. An existing slab may need assessment for reuse, or a defined removal and disposal job. The quotation should state who completes each task and what making good follows. Plan that preparation with the route for materials and waste, showing the approach and any surfaces that need protection.

Before the construction detail is settled, bring together the supplier's base plan and the floor you intend to use. Additional insulation or flooring changes the height at which the doorway meets a drive, path or garden. Explain any accessible entrance or equipment-entry requirement, and include the relevant trades when agreeing service openings or associated drainage. Known buried services need appropriate checks during planning; the necessary openings and details are resolved before the pour.

Let us know about other people using the approach or working area, including another building contractor. Agree how the base installation fits their work and when they need the completed position. That coordination belongs in the programme alongside the concrete's curing and loading stages.

Coordinating your building in Midhurst

If you are comparing oak-framed buildings, The Brookwood Barn Co's workshop is at Bridgelands Farm near Midhurst. Contact the business about its products and visit arrangements. Whichever maker you choose, ask for the structure's foundation and fixing requirements alongside the intended floor; that information defines the concrete work to discuss.

For an address within the National Park, Chichester's South Downs planning guidance explains its role handling most district applications for the Park Authority. Check the complete proposal and relevant property designations using the planning map. Building control is separate from planning.

You can ask us about a base while those checks are in progress. The Midhurst overview explains the other options, including ground screw installation for compatible framed buildings. You can also book ground screw testing separately or check West Sussex service locations.

Midhurst-area concrete enquiries

We welcome concrete-base projects from Midhurst and the surrounding communities listed here. The postcode and proposed work let us assess the practical installation and include travel in the quotation.

GU29 is the main local reference. Nearby GU28, GU27, GU30, GU31, GU33 and PO18 addresses can be discussed too; ask about your site if it is close to the listed places.

  • Midhurst and its local areas: town centre, Holmbush, Carron Lane, June Lane, Bepton Road, Taylors Field and Bourne Way.
  • Easebourne and adjoining communities: Easebourne, Upper Easebourne, the Dodsley Lane area, Henley, West Lavington, Woolbeding and Redford.
  • Bepton, Cocking and nearby villages: Bepton, Cocking, Cocking Causeway, Heyshott, Hoyle, South Ambersham, Selham, Graffham, East Lavington, Upper Norwood and Duncton.
  • Lodsworth and the Petworth area: Lodsworth, Lickfold, Bexley Hill, Halfway Bridge, Lurgashall, Hillgrove, River, Tillington, Upperton, Petworth, Hampers Green and Byworth.
  • Stedham and adjoining villages: Stedham, Iping, Minsted, Tote Hill, Ingrams Green, Chithurst, Trotton, Dumpford, Elsted, Elsted Marsh, Treyford and Didling.
  • Rogate and Harting: Rogate, Fyning, Terwick Common, Nyewood, South Harting, East Harting, West Harting, Rake and Hill Brow.
  • Milland and Fernhurst area: Milland, Borden, Linch, Linchmere, Fernhurst, Kingsley Green, Camelsdale and Hammer.
  • Nearby Downs villages: Singleton, Charlton, East Dean, West Dean and Chilgrove.

Feedback on Craig’s earlier work

"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
— Alan, ChristchurchMyBuilder · BH23 · Concrete base
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
— Paul Leister, BroadstoneMyBuilder · BH18 · 6m x 4m Concrete shed base

Questions about a concrete installation

The answers below explain the preparation, specification and building coordination involved in ordering a poured base.

What does the poured slab do for the building?

It provides a continuous supporting base. For a suitable floorless building it can also be the surface used inside, while other designs place their own floor system above it. The construction and finish are agreed for that role, the building loads and the assessed site.

Does the supplier's overall building size define the slab?

The final base follows the actual foundation plan. Overall sales dimensions can include features beyond the supported footprint, so obtain the model's bearing, edge and fixing requirements when available. We can begin with an approximate size and settle the exact outline before installation.

What if I change the model after asking for a price?

Pass on the revised building information before the scope is confirmed or work proceeds. A different floor, footprint or fixing detail may change the concrete construction and preparation. We review the quotation against the selected model so you know which base is being supplied.

Can you quote a corner or other shaped base?

Ask about the plan for your building. The shaped price schedules help with the initial budget, with the final outline and dimensions taken from the manufacturer's foundation information. Formwork, preparation and the required finish are then included in the agreed quotation.

When do we decide the concrete finish?

Before placing the slab, using the floor's intended use and anything to be applied above it. Tell us whether concrete will remain visible, what moves across it and whether another floor or coating follows. Those requirements should be coordinated with the building supplier and relevant trades.

What information matters for a garage base?

The garage's structural requirements, vehicle use and door arrangement are important. Give any foundation plan and explain how vehicles approach the opening. We agree the support, floor and threshold detail, identifying separate post foundations or associated entrance work where the design calls for them.

Should machine positions be known before quoting a workshop?

Tell us the available equipment and storage plan, even if it is provisional. Weights, concentrated bearing positions and fixings can influence the slab. The final construction should be specified once the intended loading is understood, with any required design information identified before the work is agreed.

How can an old slab be assessed?

Describe its visible condition, dimensions and known construction, with the proposed building's details. That helps establish what further assessment is needed to decide whether it can be used. Alteration or replacement can be discussed where appropriate, and the agreed works are recorded in the quotation.

Who deals with removing the old building and base?

That responsibility is agreed for the job. Tell us what exists and whether you want clearance, breaking out and disposal quoted. If you arrange a contractor yourself, confirm what will be removed and how the area will be left. The new installation should start from the agreed prepared state.

What should I say about the delivery route?

Describe the approach from the likely unloading point to the base, including any gates, steps, slopes and shared working space. Photos can help explain it. We confirm a practical handling arrangement for the installation and identify relevant protection or preparation within the scope.

Can I arrange building assembly as soon as the pour is finished?

Plan it around the loading advice for the new concrete. Curing and protection need to suit the construction and conditions, and walking access may be possible before the slab is ready for assembly or heavier contents. Agree the stages with us and the building installer before fixing dependent dates.

Do I need a finished specification to start?

No. The project idea and postcode are sufficient for the first discussion. We can explain what information will be useful as the building and floor are chosen. Construction details, site preparation, price and the programme are settled before the installation is booked.

Request your concrete-base quote

Tell Craig about the proposed base, call 01202 039753 or use WhatsApp. We will discuss the requirements, quote the agreed work and establish the next preparation and installation steps.