A poured concrete base before the building is fitted

Concrete base installation in Shaftesbury

JustBases installs poured concrete bases for Shaftesbury garden buildings and other suitable projects. We can arrange the agreed preparation and slab, with the construction planned around the building and how you will use it.

Concrete support for your next building

The floor is part of choosing the foundation. A concrete slab can become the surface inside the building or carry another specified floor above it. Tell us what your supplier provides and the activities planned for the space so we can discuss the appropriate concrete work.

A poured slab gives continuous support over its footprint. Where the building requires a different arrangement, we can discuss alternatives such as paving laid on concrete or mortar, or separate supports beneath a suitable frame. The selected building's requirements remain central to the choice.

Shed bases

Shed bases

Match the foundation to the shed's supported outline and floor. We can discuss its position, entrance height and any preparation needed when replacing an existing storage building.

Learn more: Shed bases
Garden room bases

Garden room bases

Coordinate the slab with the room's intended floor and wall construction. Insulation, service entries and the finished doorway need consideration while the supporting base is being planned.

Learn more: Garden room bases
Workshop bases

Workshop bases

A slab can give the workshop a useful working floor. Tell us about equipment, floor fixings and storage loads, with the supplier's construction details considered when specifying the base.

Learn more: Workshop bases
Stable foundations

Stable foundations

A stable base is planned for its building and intended floor use. Obtain the supplier's foundation requirements and discuss any separately designed drainage, access or yard work that needs coordination.

Learn more: Stable foundations
Browse 74 application guides

Shaftesbury poured concrete prices

Use the guides to consider the budget for a continuous poured base of the size and shape you need. They are a starting point for the concrete discussion; the selected building and agreed preparation establish the final quotation.

Particular loading, floor details or work outside the guide construction are priced for their requirements. A prepared footprint, old-base clearance and other surrounding work should be identified so the written price describes the job you want undertaken.

What affects your quotation

The supporting build-up, concrete construction, outline and finished level determine the slab work. Specified membranes, reinforcement, formed edges or other building details are included as the project requires.

Site preparation and access affect the practical installation. We consider excavation, removal and disposal, routes for materials and the method of reaching the pour area. Additional retaining, entrance or landscaping work is separately identified where agreed.

Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.

Rectangular poured bases: all guide sizes
SizeGuide price
8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² From £817
10' x 6' 3m x 1.8m 60 ft² / 5.57 m² From £971
10' x 8' 3m x 2.4m 80 ft² / 7.43 m² From £1,176
12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² From £1,279
12' x 10' 3.6m x 3m 120 ft² / 11.15 m² From £1,433
14' x 10' 4.2m x 3m 140 ft² / 13.01 m² From £1,536
16' x 10' 4.8m x 3m 160 ft² / 14.86 m² From £1,741
18' x 10' 5.4m x 3m 180 ft² / 16.72 m² From £1,844
20' x 10' 6m x 3m 200 ft² / 18.58 m² From £2,049
Corner, hexagonal and octagonal poured bases

Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.

Corner
SizeGuide price
7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² From £817
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £971
9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² From £1,176
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,279
Hexagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £827
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,264
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,633
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £1,972
Octagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £827
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,264
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,633
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £1,972

No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.

Discuss a Shaftesbury concrete base

You can enquire with the intended building or use and the postcode. Craig will discuss the work with you and explain what further information helps with a quotation. Supplier drawings, model details and photos can be supplied as the plans develop.

Request your free quote

A brief description of the proposed building and your postcode will start the conversation. Sizes or photos are useful when you have them.

Your enquiry

Concrete bases in Shaftesbury

Please provide either an email address or a phone number.

Add site photos, video or a drawing (optional)

Upload up to 5 photos or a short video of your site to help us provide an accurate quote.

0/5 files. JPG, PNG, WebP, PDF, MP4, MOV accepted — up to 100MB each.

Free, no-obligation quote. Your details are used to respond to this enquiry; see our privacy policy.

Preparing the base and handing it over

We agree the foundation construction before work starts, including its relationship with the building and the practical site arrangements. The programme also needs time for the new concrete to cure before the relevant loads are introduced.

Confirm the floor and building footprint

The model's base information is used to agree the slab dimensions, position and height. We consider the complete finished floor, doorway and adjoining levels, with any provisions required in the concrete.

Complete the specified ground preparation

Agreed excavation and clearance are followed by preparation of the support beneath the slab. Formwork defines the outline, and the specified layers, reinforcement or membrane are arranged before pouring.

Pour and finish the concrete

Materials reach the footprint through the planned route. We place and finish the concrete for its agreed purpose, whether it will be the usable surface or form the foundation for the supplied building floor.

Coordinate the building and curing period

We explain the protection and readiness advice at handover. Arrange the building installer and deliveries using that information, with any heavier loading introduced at the appropriate stage for the project.

Making the slab fit the complete project

Confirm how the building will sit on the concrete before its height is fixed. A supplied floor may include bearers or other layers, and the final doorway needs to work with the approach outside. Discuss the proposed floor and adjoining work together so the building installer and foundation team have the same information.

An old base or previous landscaping may affect the work required to reach that finished arrangement. Show us anything to retain and explain what is to be cleared. We can discuss assessment of existing concrete and identify any agreed removal and disposal, including the route for material leaving the property.

The work area also needs a practical route for new materials. Gates, steps, turns and the distance from a delivery point help establish how concrete can be placed. Any planned service entries should be coordinated with the relevant specialist before the pour, with the responsibilities for connections and reinstatement agreed.

If the building's floor suits another form of support, compare the methods on the Shaftesbury overview. It includes timber frames on concreted-in posts and paving on concrete or mortar. For a suitable timber or steel frame on screws, see ground screw installation in Shaftesbury.

Building information and the correct local authority

Poultons Dorset makes timber buildings in Shaftesbury and gives its address as Wincombe Business Park, Shaftesbury SP7 9QJ. For a building made to your chosen layout, obtain the final support drawing and floor requirements once the design is settled. That helps us quote the concrete construction for the building you will actually receive.

Use the property's actual council area for permission enquiries. Shaftesbury is in Dorset, while nearby Semley and Tisbury are in Wiltshire. Dorset Council explains planning and building-control checks for its area; for a Wiltshire property, direct those questions to Wiltshire Council. You can discuss the foundation while checking the proposed building, then share any requirements that affect its base.

Shaftesbury and nearby villages

We welcome enquiries from Shaftesbury town centre, Gold Hill, St James, Enmore Green and residential streets near Shaftesbury Abbey. The local enquiry area also includes Littledown, Barton Hill, the Wincombe Lane and Gower Road areas, Mampitts and nearby East Green and Meles Mead addresses.

Surrounding communities in North Dorset include Motcombe, Cann, Cann Common, Melbury Abbas, Twyford, Guy's Marsh, Compton Abbas, Fontmell Magna, Bedchester, Sutton Waldron and Iwerne Minster. We also discuss projects in Stour Row, East Stour, West Stour, Stour Provost, Fifehead Magdalen, Margaret Marsh, East Orchard and West Orchard, and towards Gillingham.

Nearby Wiltshire enquiries are welcome from Semley, Sedgehill, Donhead St Mary, Donhead St Andrew, Ludwell, Charlton, Birdbush, East Knoyle and Tisbury. We also consider projects towards Blandford Forum and Salisbury. Give us the full site address so the scope, access and journey can be discussed for the quotation.

SP7 is the main Shaftesbury district, with SP8 useful towards East Stour and Gillingham, SP3 around Tisbury and DT11 towards Iwerne Minster and Blandford. Salisbury addresses may use SP1 or SP2. These examples help locate the enquiry; we confirm the service and travel for the actual property.

Feedback on Craig’s earlier work

"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
— Alan, ChristchurchMyBuilder · BH23 · Concrete base
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
— Paul Leister, BroadstoneMyBuilder · BH18 · 6m x 4m Concrete shed base

Shaftesbury concrete installation questions

How do I know what sort of floor the building needs?

Ask the supplier how its walls and floor are supported and whether it includes a floor of its own. That establishes the role of the concrete: it may be the usable surface or a foundation beneath another construction. We discuss those instructions with your intended use when agreeing the base.

Can I arrange the building and foundation through different companies?

Yes. Make clear which parts each company is providing, including the floor, supporting base and assembly. The building supplier's final instructions should be shared before the slab is specified. Coordinating that information and the programme helps the two stages fit together.

What does a concrete quotation take into account?

It follows the footprint, specified construction and practical site work agreed with you. Preparation, delivery access and any clearance or disposal need to be identified as well as the slab itself. The guides help you budget while those details are being established, with the written quote confirming the scope.

Which size should I send while I am still comparing buildings?

An approximate footprint is useful for the initial conversation. Once you choose a model, obtain its actual foundation dimensions and any floor or bearer layout. We use that information to confirm the required concrete outline and height before construction is arranged.

Will heavy contents affect the concrete work?

They can affect the loading that needs to be allowed for. Mention substantial equipment, concentrated supports and any planned floor fixings when describing the building. Relevant manufacturer or designer information can then be considered in the specification for the floor and foundation.

Can you allow for a sauna's service requirements?

The supplier and service installer should establish the required connection details and entry positions. Share those while the base is being planned so suitable provisions can be coordinated before pouring. Electrical, plumbing and other specialist connections remain work for the appropriate responsible installer.

Do shaped buildings need a special base plan?

They need a plan that identifies the actual supporting outline for the selected model. Roof overhangs and advertised overall sizes may not establish that footprint. Send the manufacturer's information when available so the formwork, support and entrance can be agreed and priced accurately.

Could an old slab support my replacement building?

Its suitability needs assessment for the new structure. Describe its visible condition and what you know about its construction, then compare its outline and level with the proposed building. We can discuss further assessment or include agreed removal and replacement work in the quote.

How can you assess a restricted material route?

A description or video from the entrance to the footprint can show the important points. Include gates, steps, narrow turns and surfaces that should remain in use. We consider the quantities and work involved to agree a practical delivery and handling arrangement for the quotation.

Can the entrance height be agreed before the concrete is poured?

Yes, it should be considered with the complete finished floor and the approach outside. Confirm any layers the building supplier places above the slab and show the adjoining levels. Those details help settle the concrete height and identify separate work at the doorway or surrounding surface.

Who decides the concrete and reinforcement details?

The construction requirements are established for the building, use, loads and site, including any relevant supplier or design instructions. We agree the work and identify the specified details in the quotation. Membranes, reinforcement or particular edge provisions are incorporated where that construction requires them.

How should I plan delivery after the base is finished?

Agree the programme using the curing and loading advice for the slab. The appropriate interval depends on the concrete, conditions and the loads being introduced. Coordinate the building fitter and heavier deliveries with the handover information, and ask us before changing those arrangements.

Get the concrete work quoted

Call Craig on 01202 039753 or use the form to explain the project. We can discuss the foundation and prepare a written quotation for the agreed work. Explore the local service pages below if you are considering another base or standalone testing.