A poured concrete base before the building is fitted

Concrete base installation in Totton

We prepare and install poured concrete bases for Totton garages, garden buildings and other suitable projects. Plan the base with us so its footprint, floor level and construction are ready for the building you choose.

A poured base for everyday use

Think about the completed space: how you will enter it, what will stand inside and whether concrete will be the surface you walk or work on. These decisions help establish a useful floor as well as a foundation for the walls.

JustBases can undertake the agreed ground preparation and concrete installation. Your building supplier's requirements guide the footprint and support details, with the slab specification suited to the intended loads and floor construction.

Garage bases

Garage bases

A well-planned floor includes the entrance. Discuss the vehicle, door system and adjoining drive so the slab and threshold work with how the garage will be used.

Learn more: Garage bases
Workshop bases

Workshop bases

Concrete can provide a durable working floor. Share any significant equipment loads and fixing requirements so the proposed work accommodates the way you intend to use the workshop.

Learn more: Workshop bases
Greenhouse bases

Greenhouse bases

A greenhouse may need a perimeter foundation, a full floor or another specified arrangement. Tell us whether you want beds or a complete hard surface inside, alongside the frame manufacturer's requirements.

Learn more: Greenhouse bases
Shed bases

Shed bases

The shed's base should support its particular footprint and floor. We can discuss a new slab together with any agreed clearance needed to replace the existing building or base.

Learn more: Shed bases
Browse 74 application guides

Poured concrete base prices

Compare the guide sizes and shapes as you plan your budget. The tables cover poured bases; your particular building and the preparation needed determine the final quoted work.

When we discuss the site, we separate the slab from any additional clearance or surrounding work you want included. You receive a written quotation setting out the agreed scope so you can coordinate it with the building purchase.

What affects your quotation

Excavation, sub-base preparation, the concrete construction and the size and shape of the footprint all contribute to the price. Specified reinforcement, a membrane, edge details and the required surface finish are considered with the building's intended use.

Tell us about material already on the site, the route for deliveries and where cleared material can be handled. Removal of an old base, disposal, restricted carrying access and the means of placing the concrete are priced where they form part of the agreed work.

Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.

Rectangular poured bases: all guide sizes
SizeGuide price
8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² From £809
10' x 6' 3m x 1.8m 60 ft² / 5.57 m² From £961
10' x 8' 3m x 2.4m 80 ft² / 7.43 m² From £1,165
12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² From £1,266
12' x 10' 3.6m x 3m 120 ft² / 11.15 m² From £1,419
14' x 10' 4.2m x 3m 140 ft² / 13.01 m² From £1,520
16' x 10' 4.8m x 3m 160 ft² / 14.86 m² From £1,724
18' x 10' 5.4m x 3m 180 ft² / 16.72 m² From £1,825
20' x 10' 6m x 3m 200 ft² / 18.58 m² From £2,029
Corner, hexagonal and octagonal poured bases

Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.

Corner
SizeGuide price
7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² From £809
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £961
9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² From £1,165
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,266
Hexagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £819
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,251
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,617
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £1,952
Octagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £819
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,251
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,617
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £1,952

No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.

Tell Craig what you are planning

You can enquire while choosing the building. Tell us its purpose and the postcode, with an approximate size if available. We will discuss what needs establishing next; drawings and site photos are welcome whenever you have them.

Request your free quote

Tell us what the new base will support and where it is needed. You can add sizes, photos or a building plan later.

Your enquiry

Concrete bases in Totton

Please provide either an email address or a phone number.

Add site photos, video or a drawing (optional)

Upload up to 5 photos or a short video of your site to help us provide an accurate quote.

0/5 files. JPG, PNG, WebP, PDF, MP4, MOV accepted — up to 100MB each.

Free, no-obligation quote. Your details are used to respond to this enquiry; see our privacy policy.

Planning the work around your building delivery

A concrete base is best programmed with the building installation in mind. Allow time to settle the details, complete the preparation and follow the curing advice before the building and its contents are placed on it.

Agree the finished base

Confirm the model, base drawing and floor requirements, then agree the slab's position and level. We discuss relevant loads, threshold details and any provisions that need to be formed within the concrete.

Set up the work area

The agreed clearance and excavation are carried out, followed by preparation of the support beneath the slab. Set-out, formwork and specified construction details are completed before the pour.

Place the concrete

We use the planned route and delivery method to get concrete to the prepared area. It is placed and finished to the agreed specification, with the surrounding work area managed as arranged.

Confirm when it is ready

At handover, we explain protection and use of the new slab. Confirm the building installer's date against the advised loading timetable; readiness for light access and for the completed structure can differ.

Preparation that belongs in the quotation

A site photo can show more than the empty footprint. Include the approach from the entrance, the surfaces next to the base and anything that needs clearing. Tell us whether existing paving or a slab is to be retained or removed so the agreed work has a clear boundary.

Floor height affects the building's day-to-day use. Discuss the doorway and the connection to a drive, path or seating area, as well as any floor layers going above the concrete. These details are useful while setting the level and deciding what separate surrounding work may be required.

Ask the building supplier what it expects beneath the unit and whether it provides the floor itself. A membrane, insulation arrangement, reinforcement and finish should be coordinated with that construction. Any service openings need to be agreed with the appropriate installer in time for the pour.

If the building suits a supported floor instead, Totton's base options include paving on a concrete or mortar bed, a timber frame on concreted-in posts and a screw-supported foundation. The local ground screw installation service explains the frame options for that approach. We can discuss which foundation fits the building and your plans.

Checking the proposed building at your address

Include the proposed building's use and position when asking the authority about permissions. For addresses in New Forest District, planning is handled by either New Forest District Council outside the Park or the Park Authority inside it. The Park's address checker helps establish the relevant boundary. Southampton City Council covers its own city area; Nursling and Rownhams are in Test Valley.

The building's construction may also need a building-control check. Ask the relevant council about that separately from planning, including for properties whose planning authority is the National Park. The Park's planning FAQ explains the responsibilities. If approved details or conditions affect the foundation, share them as the base work is agreed. You can start the JustBases enquiry while you are still checking the proposal.

Totton, the Waterside and nearby villages

Enquiries are welcome from Totton town centre, Eling, Hounsdown, Calmore, Testwood, West Totton, Rushington, Brokenford and Hammond's Green, including homes around Eling Tide Mill, Rumbridge Street, Hanger Farm and Loperwood. We also discuss work in Ashurst Bridge, Ashurst, Colbury, Foxhills, Woodlands and Netley Marsh.

Nearby communities include Bartley, Cadnam, Copythorne, Winsor, Newbridge and Ower, with enquiries welcome towards Nursling, Rownhams, Southampton and Lyndhurst. Along the Waterside we welcome projects in Marchwood, Hythe, Dibden, Dibden Purlieu, Applemore, Hardley, Holbury, Blackfield, Fawley, Langley and Calshot.

SO40, SO45, SO16 and SO43 are useful postcode-district examples across these places. Send the full site address and postcode so we can discuss the proposed work, access and travel. The quotation confirms the service for that address.

Feedback on Craig’s earlier work

"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
— Alan, ChristchurchMyBuilder · BH23 · Concrete base
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
— Paul Leister, BroadstoneMyBuilder · BH18 · 6m x 4m Concrete shed base

Totton concrete base questions

What is the advantage of a continuous concrete floor?

It gives a single supported surface that can serve as the floor or carry the building's specified floor system. That can be useful for storage, working space and suitable vehicle buildings. We consider the intended use and the supplier's construction requirements when discussing whether a poured base is appropriate.

What should I ask the building supplier for?

Request the base drawing for the exact model, its support requirements and the proposed floor construction. Any fixing, threshold or service-entry details are useful too. You can start an enquiry before obtaining these; they become important when confirming the foundation dimensions and specification.

How does an insulated floor affect the concrete work?

The floor build-up needs to be coordinated so its final height works with the walls and entrance. Insulation may be part of the building system or another agreed construction. Tell us what the supplier proposes, and make clear who is providing each layer before the slab level is set.

Could my existing slab be suitable for the new building?

Its dimensions, condition and construction need assessment against the new building's requirements. Share what is known about it and show us its surface and edges. We can discuss the next step; if replacement or removal is required, that work can be identified in the quotation.

What access information helps with a quote?

Describe the route from the delivery point to the footprint, including gates, steps and any tight turns. A video walking the route is useful when available. With that information we can discuss getting materials in, handling excavated material and a practical method for placing the concrete.

How should I coordinate the base and building delivery?

First confirm the selected building's foundation information, then agree the base programme and advised curing period. Give the building installer that timetable before fixing its attendance. If the building delivery date is already booked, tell us early so we can discuss whether the required work and curing time fit.

Can the base meet an existing path or driveway?

We can consider the adjoining surface when planning the finished height and entrance detail. Show us the levels and explain how you want to use the doorway. The slab, any step or ramp and surrounding drainage or paving responsibilities should be settled together before construction.

Does a garage need different concrete from a shed?

The specification follows the actual building and use. Vehicles, concentrated loads, wall supports and fixings may call for different construction from a light storage building. We establish those requirements for the quote, including any design input needed for the proposed slab.

What should I prepare when asking about a sauna base?

The chosen unit's support plan is helpful, together with its entrance position and any requirements for service connections. Tell us about planned equipment and the surrounding access. We can then coordinate the foundation provisions, with electrical or plumbing work agreed with the appropriate specialist.

Will a greenhouse need concrete across the whole footprint?

That depends on the frame requirements and how you want to grow inside. A perimeter foundation and growing beds may suit one design, while another calls for a complete floor. Explain your preference and provide the model details so we can discuss and price the particular construction required.

What aftercare does a newly poured base need?

Follow the protection and loading advice supplied for the concrete and conditions. Keep unapproved traffic and stored materials off it during the advised period, and coordinate building work with the handover instructions. Ask us before bringing forward installation or heavy loading if your programme changes.

Can I get advice before buying a building?

Yes. A foundation discussion can help you understand what to ask a supplier about the building's floor and support requirements. We can also discuss how a base would fit the space and access you have. Enquire with your postcode and intended use while comparing models, then bring the chosen building's instructions into the final base plan.

Get the base work arranged

Speak to Craig on 01202 039753 or send the form with your project idea and postcode. You can explore the other Totton foundation services below, along with our wider Hampshire coverage.