A poured concrete base before the building is fitted

Poured concrete bases in Alresford

We prepare and install poured concrete bases for garden buildings in Alresford and the surrounding villages. From the ground beneath the slab to the finished surface, the work is agreed around your building, its intended use and the requirements of the person fitting it.

A concrete floor for the building you are planning

A poured slab gives a suitable outbuilding a continuous, solid base. It can provide the usable floor or receive the floor finish specified for the building. Getting the size, level and surface requirements settled together makes the next stage of construction easier to arrange.

We can discuss a new building or replacement base. Tell us what you want to put inside, including substantial equipment or stored loads, so the proposed construction can be checked for the intended use.

Shed bases

Shed bases

A concrete base can support a suitable shed and provide a durable floor beneath stored items. Confirm the shed's base dimensions and any wall or rail fixings, especially where the supplied building has no separate timber floor.

Learn more: Shed bases
Workshop bases

Workshop bases

An even, usable surface matters when you are moving benches, working at a machine or handling materials. Explain the equipment and intended floor finish so any specification and fixing requirements can be addressed before the pour.

Learn more: Workshop bases
Garden-room bases

Garden-room bases

The room supplier's floor detail establishes how the concrete meets insulation, structural framing and the finished floor. We can agree the level and handover against that detail, with the responsibilities for later layers made explicit.

Learn more: Garden-room bases
Garage bases

Garage bases

Vehicle use brings requirements beyond the outline of the garage. Share the building design, intended vehicles and entrance arrangement so the slab specification and any associated work can be properly defined.

Learn more: Garage bases
Greenhouse bases

Greenhouse bases

A concrete arrangement needs to work with the greenhouse frame and the way you want to grow. Discuss the base rail, fixings and any proposed growing openings before the foundation layout is confirmed.

Learn more: Greenhouse bases
Browse 74 application guides

Poured-concrete guide prices

The schedules below show guide sizes for rectangular and shaped bases. They help with an initial budget; the quotation then identifies the work needed at your property and the construction agreed for the building.

Please tell us if the base will receive a later covering or needs a particular finish from the outset. That information belongs in the quotation as well as the building supplier's installation notes.

What affects your quotation

The work needed to prepare the ground, the slab dimensions and specification, and the route for bringing materials to the position all affect the price. Existing concrete or a building to remove should be described separately so any clearance and disposal can be included clearly.

Requirements for the finished level, reinforcement, edges and surface are confirmed for the project. If there is work that another contractor will complete, the quotation should show where our responsibility ends and theirs begins.

Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.

Rectangular poured bases: all guide sizes
SizeGuide price
8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² From £823
10' x 6' 3m x 1.8m 60 ft² / 5.57 m² From £979
10' x 8' 3m x 2.4m 80 ft² / 7.43 m² From £1,186
12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² From £1,289
12' x 10' 3.6m x 3m 120 ft² / 11.15 m² From £1,444
14' x 10' 4.2m x 3m 140 ft² / 13.01 m² From £1,548
16' x 10' 4.8m x 3m 160 ft² / 14.86 m² From £1,755
18' x 10' 5.4m x 3m 180 ft² / 16.72 m² From £1,858
20' x 10' 6m x 3m 200 ft² / 18.58 m² From £2,065
Corner, hexagonal and octagonal poured bases

Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.

Corner
SizeGuide price
7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² From £823
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £979
9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² From £1,186
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,289
Hexagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £834
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,274
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,646
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £1,988
Octagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £834
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,274
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,646
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £1,988

No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.

Start with the building and your postcode

Tell us what you are planning to build and the full postcode. An approximate size is useful for the first conversation, but it is fine to enquire while choosing the building. If you already have a product link or foundation drawing, you can send it with your request.

Use the form, call 01202 039753 or WhatsApp Craig. We will explain the information needed to confirm the base and arrange the next step.

Request your free quote

Just give us your contact details and a short description of what you want to build. We will guide you through the rest.

Your enquiry

Concrete bases in Alresford

Please provide either an email address or a phone number.

Add site photos, video or a drawing (optional)

Upload up to 5 photos or a short video of your site to help us provide an accurate quote.

0/5 files. JPG, PNG, WebP, PDF, MP4, MOV accepted — up to 100MB each.

Free, no-obligation quote. Your details are used to respond to this enquiry; see our privacy policy.

How we prepare and pour your base

We agree the dimensions, ground preparation and concrete construction before starting, then hand over the completed slab with the relevant curing instructions.

Set the dimensions and finished level

We confirm the chosen footprint, position and top level using the building requirements. The intended entrance and surrounding ground are considered alongside any later floor layers, so the height being set out has a clear purpose.

Prepare the ground and supporting layers

The agreed excavation and preparation establish a suitable bearing surface and compacted supporting material. Any specified membrane, reinforcement or other construction detail is included at the appropriate stage before concrete is placed.

Form, place and finish the concrete

The formwork defines the base edges and level. Concrete is placed and finished to the agreed specification, with attention to the surface the building fitter or floor finisher will receive.

Protect the base and agree the handover

The new concrete needs appropriate protection and time to develop strength. We explain when the next activities can take place, distinguishing initial access, drilling, building assembly and full loading where those need different arrangements.

Prepare the site and agree the floor handover

The route to the position needs to work for the agreed concrete installation. Show us the access from the unloading area and explain any steps or restricted openings. If an old building or base occupies the site, identify what you want removed so the necessary clearance and disposal can be agreed before work is booked.

Decide what you want the final floor to be. A slab used as an exposed workshop floor has a different handover from concrete that will receive an insulated floor system. Tell us about any covering the room or building supplier intends to install, and obtain its requirements for the base beneath it.

Dimensions should refer to a clear part of the building: its required foundation footprint, not a mixture of wall measurements, roof overhangs and advertised sizes. Where the supplier calls for particular tolerances or fixing details, those need to be checked before the concrete work is booked.

Fixings into the new slab should follow the agreed construction and curing requirements. Identify who will set out and install them. If a building fitter is providing anchors or a separate floor, we can use that information to make the handover clear without including their work in our foundation price.

If the building comes with a floor that is better suited to raised support, ground screw installation in Alresford may be worth comparing. Our paving slab base guide explains the separately bedded paving option.

Planning checks for an Alresford outbuilding

Check the proposed building's position, size and use with the appropriate planning authority before committing to the foundation. If permission or another approval sets a level or construction requirement, keep that detail with the building information so it can be allowed for in the quote.

Winchester's property maps for conservation areas provide a useful starting point for a New Alresford address. For properties within the Park, Winchester explains its South Downs planning service and the Park Authority's responsibility. East Hampshire-side addresses also need the correct council or Park route checked for the actual property. For an address towards the Candovers or another district boundary, find the council for your postcode before seeking property advice.

A base quotation can be started while those details are being gathered. We can discuss the proposal without drawings at first contact, then use the relevant building and approved information to confirm the work.

Concrete-base enquiries around Alresford

New and Old Alresford are both included in our enquiry area, along with the surrounding places below. The full postcode lets us confirm the property and discuss the route to the proposed base.

Enquire for SO24 addresses and adjoining properties around Itchen Abbas in SO21, Four Marks and Medstead in GU34, and Preston Candover in RG25. We confirm the scope, access and visit arrangements for each property.

New Alresford

The town centre and Broad Street, The Dean, Jacklyns Lane, Sun Lane and Sun Hill, The Avenue, Grange Road, Beech Road, New Farm Road and Tichborne Down.

Old Alresford and smaller settlements

Old Alresford, Fobdown, Pinglestone, Godsfield, Nettlebeds, Armsworth, Upper Lanham, Lower Lanham and Upton.

Bishops Sutton, Bighton and Gundleton

Enquiries from these adjoining villages and the properties between them are welcome.

Tichborne and the Cheriton-side villages

Tichborne, Cheriton, Beauworth, Kilmeston, Bramdean and Hinton Ampner.

Itchen Stoke and the Itchen Valley

Itchen Stoke, Ovington and Abbotstone; Itchen Abbas, Avington, Easton and Martyr Worthy.

Northington and the Candovers

Northington, Northington Down, Swarraton and Totford, together with Brown Candover, Chilton Candover and Preston Candover.

Ropley, Wield and adjoining villages

Ropley, Ropley Dean, Monkwood, Upper Wield, Lower Wield, Four Marks, Medstead, West Tisted and East Tisted.

Feedback on Craig’s earlier work

"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
— Alan, ChristchurchMyBuilder · BH23 · Concrete base
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
— Paul Leister, BroadstoneMyBuilder · BH18 · 6m x 4m Concrete shed base

Poured-concrete questions

If the building supplier has already given you a foundation requirement, send it when convenient. We can also help you work out what to ask for before you order.

What makes a poured base useful for a garden building?

It provides a continuous slab that can support an appropriate structure and form a usable floor beneath it. That can be helpful for storage, working space or a building designed to sit on concrete. The slab still needs to match the building and intended loads, with the surface and any later floor finish agreed at the quotation stage.

Which dimensions should I send for the base?

Send the building supplier's required foundation dimensions if you have them. If not, the proposed building size or a product link is enough to begin the discussion. We will establish the actual base footprint before work is confirmed, including any shaped outline or specified edge detail, so everyone is referring to the same measurements.

What information should I ask the building manufacturer for?

Ask for its foundation plan or base requirements, the level and surface it needs, and how the building is fixed down. If it includes a floor system, request the detail showing what sits above the concrete. These documents help allocate the work between the foundation installer and building fitter, but are not required for your first enquiry.

What preparation can be included in the concrete work?

The quotation can define the excavation, supporting layers and other specified preparation needed before the pour. Describe the existing surface and anything occupying the position. Site conditions and access are then considered when pricing the work. Clearance or disposal should be stated explicitly so you know whether you or another contractor needs to arrange it.

Can you replace an existing concrete base?

We can discuss removal and replacement as part of the quotation. Photographs and approximate dimensions of the old concrete help establish what needs investigating and pricing. If you hope to retain it, its suitability needs assessment for the new building; the required size, condition and construction matter to that decision.

Can the finished base be higher than the surrounding garden?

The top level can be planned around the building and site. It affects the entrance, any steps or paths and how the walls or floor meet the base. Tell us the arrangement you want and any supplier's level detail. We will agree the proposed height and associated work with those requirements in view.

Can I use the concrete as a workshop floor?

Yes, where the building and slab design provide for that use. Explain the work, substantial equipment and any coating or covering you intend to add. We can then agree what concrete surface is to be provided and check any requirements from the floor-finish supplier. Equipment anchors and later finishes should have clear responsibilities.

Will the slab need reinforcement?

That is confirmed as part of the required construction, taking account of the building, use and any design information. If your supplier or designer has specified reinforcement or a slab detail, send it before the quotation is finalised. The agreed specification identifies the reinforcement and other construction work to be provided.

How do you assess access for the concrete installation?

Tell us how the base position is reached from the available delivery or unloading area. A few photographs can show gates, turns, steps and the work area more clearly than a long description. We use the actual route and proposed construction to agree a workable arrangement and include the relevant handling in the quotation.

How soon can the building be fitted after the pour?

We agree that for the concrete specification, conditions and work to follow. Early foot access, drilling for fixings, assembly and placing substantial loads are different activities. The handover will explain what can proceed and when; please coordinate the building delivery and installer against that advice before fixing their dates.

Who fits the anchors and puts the building up?

The quotation should say whether any fixing work is included with the base. Building assembly is a separate responsibility unless expressly agreed. Where your building fitter provides the anchors, give us their requirements before the pour so the slab details and curing handover support their planned work.

Can I compare concrete with a raised base before deciding?

Yes. Let us know what building you are considering and whether it has its own structural floor. We can explain poured concrete alongside raised timber or screw-supported options and the separately bedded paving method. Comparing the same building and a clearly defined scope helps you make a useful choice.

Discuss your concrete base

Tell us the project, postcode and approximate dimensions if known. Mention an existing building or base that would need removing; photographs are helpful when you have them. We will confirm the preparation, construction and handover in the quotation.

See the full Alresford base and testing service or where we work in Hampshire. For a separate foundation measurement, read about Alresford ground screw testing.