
Concrete base installation in Bridport
Get a poured concrete base installed in Bridport, West Bay or a nearby village. JustBases can prepare the supporting ground and pour and finish the base, with a clear written scope for your building and site.
Poured bases for a supported building and a solid floor
A continuous concrete base can spread support beneath the building and provide a firm floor for the way it will be used. We discuss its construction with the building requirements, floor finish and intended contents so the foundation and the space above it are planned together.
Poured concrete is a continuous slab, whereas paving slab bases use individual slabs on a concrete or mortar bed. Separate pads and framed foundations provide support at selected positions. Our Bridport overview helps compare those methods, and the concrete base guide explains the poured option.

Sheds
Support the chosen shed's floor and fixings with an accurately planned footprint. If the concrete will also be the floor, tell us how the building and stored contents will use it so the finish and construction can be agreed.
Learn more: Sheds
Garages
The garage, vehicles and approach help establish the supporting slab. We discuss floor height at the door, the connection to the drive and relevant drainage details alongside the garage supplier's instructions.
Learn more: Garages
Workshops
Plan a useful floor for benches, tools and equipment, with any heavier or concentrated loads identified. Where machinery will sit and how it enters the workshop are helpful details when developing the base specification.
Learn more: Workshops_1768039694155.CrOLEM4N_1XJ4xe.webp?dpl=dpl_BC3QiZExVcAMF6meDzMb7s6ibQnq)
Greenhouses
The base needs to match the greenhouse perimeter, fixing arrangement and door opening. Discuss the growing area inside as well, so any solid floor, paved areas or open beds fit the overall foundation layout.
Learn more: Greenhouses
Garden rooms
Follow the room supplier's floor and foundation requirements when planning a solid base. The finished height, insulation and service openings can then be coordinated with the room's entrance and the next construction stage.
Learn more: Garden rooms
Hot tubs
A suitable concrete platform can support the filled tub according to its manufacturer's instructions. Its footprint and level are planned with the operating weight, surrounding surface and access needed for servicing.
Learn more: Hot tubsBrowse 74 application guides
Garden & residential
Work & modular buildings
Garages & storage
Leisure & wellness
Energy & equipment
Renewable energy
Animal & agricultural
Commercial & community
Leisure accommodation
Concrete base guide prices
Use the poured-base sizes and shapes below to discuss your budget. We can start with an approximate building size, then confirm the actual foundation outline and construction as its requirements become available.
Your written quote covers the agreed continuous base and site work. A garage floor, specific equipment load or non-standard construction may need its own specification and price. We explain the proposed work and any separately arranged requirements before you book.
What affects your quotation
The ground preparation and excavation, concrete construction, finished height and route for deliveries all affect the work. Specify any demolition, old-base removal and waste disposal you want included. The required membrane, reinforcement, edges and surface finish are confirmed as part of the design and scope, with responsibilities for additional drainage or other work made clear.
Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.
Rectangular poured bases: all guide sizes
| Size | Guide price |
|---|---|
| 8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² | From £835 |
| 10' x 6' 3m x 1.8m 60 ft² / 5.57 m² | From £993 |
| 10' x 8' 3m x 2.4m 80 ft² / 7.43 m² | From £1,203 |
| 12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² | From £1,308 |
| 12' x 10' 3.6m x 3m 120 ft² / 11.15 m² | From £1,465 |
| 14' x 10' 4.2m x 3m 140 ft² / 13.01 m² | From £1,570 |
| 16' x 10' 4.8m x 3m 160 ft² / 14.86 m² | From £1,780 |
| 18' x 10' 5.4m x 3m 180 ft² / 16.72 m² | From £1,885 |
| 20' x 10' 6m x 3m 200 ft² / 18.58 m² | From £2,095 |
Corner, hexagonal and octagonal poured bases
Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.
| Size | Guide price |
|---|---|
| 7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² | From £835 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £993 |
| 9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² | From £1,203 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,308 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £846 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,292 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,670 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £2,016 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £846 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,292 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,670 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £2,016 |
No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.
Ask Craig for a concrete base quote
Tell us what you want the base for and the postcode, with the size if you already know it. You can enquire while comparing buildings. A supplier's drawing or photos of the site can follow once available.
Call 01202 039753, message on WhatsApp or send this form. We can discuss the preparation and construction, arrange any useful site assessment and confirm the work in a written quotation.
Request your free quote
Start with what the base is for and the site postcode. We can help work out the next details.
Your enquiry
Concrete bases in Bridport
How the concrete work is completed
We plan the slab around the building before preparing the site. The programme includes placing and finishing the concrete and allowing it to cure for the work and loads that will follow.
Agree the outline and floor height
The supporting footprint is established from the chosen building's requirements. We locate it in the agreed position and discuss the floor height with the doorway and surrounding ground. Planned services and any required openings or design details are considered before construction.
Prepare the supporting construction
Quoted clearance and excavation allow the ground and supporting layers to be prepared. Formwork establishes the edges, with a membrane, reinforcement and other details completed where specified. Materials being removed are handled according to the agreed disposal arrangements.
Pour and finish, then allow curing
The concrete is brought to the footprint through the planned delivery arrangement, placed and finished for its use. We discuss protection and curing and explain when the base can take access, building assembly and heavier loading, helping you arrange the following work.
Access, old bases and the finished entrance
Tell us how the base position is reached from the delivery point. A narrow passage, a long garden route, steps or a change in height can affect handling and placement. We can consider practical arrangements, including whether pumping or additional handling should be allowed for in the quote. Photos make an early conversation easier, with a visit where closer assessment is needed.
If you are replacing a building, the existing slab may be worth assessing before agreeing removal. Its condition and supporting construction need to suit the new requirements, as well as the dimensions and height. We discuss what can remain and any clearance or breaking out you want included; disposal is recorded in the written scope.
Consider the finished entrance before the floor level is fixed. The base height needs to work with the building's floor build-up, any covering and the path or drive outside. Let us know about water collecting in the area so levels and any drainage detail can be addressed before the pour.
Known services and proposed openings should be identified while the base is being planned. It also helps to know whether later trades will apply a coating or floor covering with particular surface or moisture requirements. We can coordinate the concrete finish and the curing programme with the relevant supplier's instructions.
For a building designed around a supported frame, see ground screw installation in Bridport. Existing screws can be considered through the separate Bridport testing service.
Planning your Bridport concrete base
Our Bridport base overview brings the methods together if you are still choosing the foundation. For other local towns, use the Dorset service areas page.
Checking the property with Dorset Council
Ask Dorset Council planning about the building and its proposed position in Bridport, West Bay or a nearby Dorset village. The conservation-area map and information help identify relevant property checks, while building control deals with its separate requirements. You can start discussing the concrete with us while checking; approved levels or construction details can be added to the base information when available.
Getting the building's support instructions
If you want to view buildings locally, Groves has a garden-building display at West Bay Road, Bridport DT6 4BA, and John Bright has a display at Paverlands Farm, Salway Ash DT6 5HT. Check which models are currently available to view. When ordering, obtain the actual base plan, floor details and fixing instructions so the concrete can be quoted for the building selected.
Concrete work around Bridport and West Bay
We welcome enquiries from Bridport town centre, West Bay, Bothenhampton, Walditch, Bradpole, Allington and West Allington, Skilling, Court Orchard, Cherry Tree, Dibden View, Hazelmead, Meadowlands, Coneygar, Watton Hill, North Mills, St Andrews Road, Gore Cross and Pymore.
Nearby places include Symondsbury, West Mead, West Cliff, Eype, Broadoak, Chideock, Seatown, Morcombelake, Ryall, Whitchurch Canonicorum and Charmouth.
We also welcome enquiries from Dottery, Salway Ash, Melplash, Netherbury, Waytown, Oxbridge, Atrim, North Bowood, South Bowood, Wooth, Silkhay, Mangerton, Whitecross, Filford, Hincknowle and Loscombe, with Stoke Abbott and Beaminster nearby.
Other surrounding villages include Loders, Yondover, Uploders, West Milton, Powerstock, Nettlecombe, North Poorton, Askerswell, Shipton Gorge, Chilcombe, Burton Bradstock, Swyre, Puncknowle, West Bexington and Litton Cheney.
DT6, nearby DT2 and DT8 addresses are useful examples when enquiring. Give the complete postcode and site address so we can confirm the visit, access and quoted work. Find other towns through our Dorset service areas.
Feedback on Craig’s earlier work
"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
Concrete installation FAQs
Can the concrete base become the building's floor?
It can where the building is intended to use a concrete floor. We agree the supporting construction and surface for its loads and purpose. Other buildings supply their own floor above the base, so let us know the chosen system and how the finished space will be used.
How are the footprint and edges agreed?
The building supplier's foundation dimensions and bearing instructions establish the required outline. We can budget from an approximate size, then confirm the edges, fixing positions and any shape details for construction. The planned entrance and adjoining ground are considered when the base is set out.
What can change the concrete guide price?
The required preparation, access and construction establish the actual installation work. Removal of an old building or slab, disposal, finished height and a particular floor specification can affect the scope. We identify what is included in the written quote and explain any separately arranged design or associated work.
Do you pour bases for shaped garden buildings?
Yes, ask about the chosen outline and use the shaped-base guides for an initial budget. The supplier's plan is helpful for confirming the actual supporting dimensions and formwork. The quotation follows that outline, the agreed construction and the practical site arrangements.
How do you specify a base for a garage or workshop?
We consider the building requirements and the loads expected in use. Tell us about vehicles, machinery and equipment positions, with weights where known. The supporting preparation, slab construction, finish and any necessary design input are agreed for the project before work begins.
Can I ask you to remove the old base?
Yes. Describe what is there, whether the existing building will be removed first and what you want included. We can assess the replacement work and discuss demolition, breaking out and disposal. Your quotation identifies those tasks and how the site will be prepared for the new concrete.
What happens where access is restricted?
We assess the full route and the quantity of work to establish practical delivery and placement. Tell us about gates, enclosed passages, steps and the distance to the base. The agreed method, any pumping or extra handling and protection for retained surfaces are considered in the written scope.
Can you coordinate the base with a supplier's building installation?
We can plan the base using the supplier's support requirements and discuss when it will be ready for assembly. Share the intended installation date as available. Preparation, the pour and the required curing period need to fit the programme, with responsibilities for subsequent fixing and building work clear.
How should the doorway and outside surface meet?
The entrance is considered with the concrete height, any floor covering and the path or driveway outside. Tell us about the way the entrance will be used and any nearby water collection. We agree relevant levels and drainage details as part of planning the base and adjoining work.
When can the concrete take the building's weight?
That follows the curing requirements for the concrete and the intended loading. We discuss access and readiness for assembly at handover, as these may be different stages. Confirm the agreed loading arrangements before bringing in the building, machinery or other heavier contents.
Who can help with permissions in Bridport or West Bay?
Dorset Council's planning service can advise on the actual property and proposed building, with building control considered separately. Relevant council links are provided above. You can enquire about the base while those checks are being made, then share approved positioning, floor-level or construction details as available.
Do I need the final building plan before contacting you?
No. Explain what you want to build and the postcode, including a rough size if known. We can discuss the concrete and what will be needed to confirm a quotation. The selected supplier's plan and any useful site photos can be sent later.
Arrange your base with JustBases
Bring us the building idea and site postcode. We can explain the concrete preparation and installation, agree what you want included and provide a written price. Ask for a concrete quote, call 01202 039753 or message Craig on WhatsApp.
