Ground screws before installation

Ground screw installation in Bridport

JustBases installs ground screw foundations for suitable buildings in Bridport, West Bay and the surrounding villages. Support your building on installed screws with a frame by others, or discuss a supplied timber frame and individually quoted steel-frame options.

Ground screw support for framed garden buildings

Ground screws provide support at planned positions beneath a structural floor or frame. Where the building and site suit this method, there is less need to excavate across its full footprint, and the foundation does not need a poured slab's curing period. The floor above the supports still needs to be designed for the building and its use.

We establish how that floor will connect to the foundation. This might mean fitting screws for your building contractor's frame or supplying the agreed timber frame ourselves. The building supplier's bearing requirements guide the arrangement, including any intermediate supports and the loads carried through the connections.

Garden rooms

Garden rooms

Coordinate the room's structural floor with a suitable supporting frame. Floor insulation and the entrance height need to be understood together so the foundation supports the intended floor build-up.

Learn more: Garden rooms
Sheds

Sheds

A shed with an appropriate floor can be supported above the garden on its agreed bearers and frame. Establish where those bearers need support and how the shed will be fixed before the screws are set out.

Learn more: Sheds
Workshops

Workshops

Tell us about equipment and the way the workspace will be used. Concentrated loads need to be carried through a suitable floor and frame, with the foundation positions agreed as part of that arrangement.

Learn more: Workshops
Log cabins

Log cabins

Follow the cabin supplier's support plan to arrange the foundation beneath the chosen model. The cabin's own floor, bearers and fixing requirements help define the work supplied by each contractor.

Learn more: Log cabins
Summerhouses

Summerhouses

A raised floor can work with a suitable summerhouse design. We discuss its actual outline and entrance, with support beneath the required points of a rectangular or shaped frame.

Learn more: Summerhouses
Browse 74 application guides

Ground screw installation prices in Bridport

Choose the guide that matches what you want supplied: installed ground screws with the frame provided by others, or screws with the stated timber frame. The quotation confirms the actual outline, support requirements and connections for the chosen building.

Steel frames, a different timber-frame specification and other non-standard work are individually quoted. Site preparation, the working route, finished height and any removal are considered when agreeing the price. We also identify testing or installation monitoring separately if the project requires it.

Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.

Building sizeInstalled ground screwsFrame by othersInstalled screws + timber frame
8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² From £1,239From £1,733
10' x 8' 3m x 2.4m 80 ft² / 7.43 m² From £1,344From £1,838
12' x 10' 3.6m x 3m 120 ft² / 11.15 m² From £1,470From £1,943
16' x 10' 4.8m x 3m 160 ft² / 14.86 m² From £1,575From £2,153
20' x 10' 6m x 3m 200 ft² / 18.58 m² From £1,680From £2,573

No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.

Talk through your foundation with Craig

You can begin with the building idea and postcode. Let us know whether you are choosing the building or already have a supplier, and we can explain what is needed to take the foundation forward. A completed drawing is not needed for this first conversation.

Use the form, call 01202 039753 or message Craig on WhatsApp. We discuss the proposed installation and frame responsibilities, then put the agreed work and price in writing.

Request your free quote

Tell us what you are planning and the site postcode. We can discuss the foundation from there.

Your enquiry

Ground screw installation in Bridport

Please provide either an email address or a phone number.

Add site photos, video or a drawing (optional)

Upload up to 5 photos or a short video of your site to help us provide an accurate quote.

0/5 files. JPG, PNG, WebP, PDF, MP4, MOV accepted — up to 100MB each.

Free, no-obligation quote. Your details are used to respond to this enquiry; see our privacy policy.

From support plan to a frame-ready foundation

The installation is planned with the floor it will carry. Agreeing the support and connection details before work allows the building contractor and foundation installer to prepare for the same arrangement.

Plan the support layout and connections

We establish the building position, supporting points and floor height with the relevant supplier or designer. The screw specification follows the required loads and site assessment. Connections and any supplied frame are defined so the finished foundation is ready for its intended next stage.

Prepare the site and install the screws

The agreed positions are marked out, with known buried services and obstructions addressed before installation. We install the specified supports and arrange the heads for the agreed frame. Access and any clearance or enabling work follow the responsibilities set out in the quotation.

Illustration of a ground screw foundation and supporting frame

Check the completed foundation and hand over

The completed support arrangement is checked against the agreed layout and levels. We complete the frame work included in our scope and provide the agreed installation records. Any required testing or acceptance is coordinated before the floor and building construction follow.

Access, floor height and existing site features

Let us know what is on the proposed footprint now. An old base, roots, buried construction or services may affect where supports can be fitted and what preparation is needed. We discuss the assessment and any agreed removal before confirming the installation and clearance responsibilities.

The raised floor height influences the entrance and the space below the building. Share the supplier's floor build-up when available, and describe the path or surface you want to approach from. On changing ground levels, the supporting arrangement and any exposed frame need to be considered with the building's design.

The way into the garden matters as well as the footprint. A short description of gates, steps and the route to the building helps us assess the work. Photographs are welcome if convenient. We confirm the practical access and any protection or preparation needed for the installation before booking.

If the building needs a continuous solid floor, our Bridport concrete base service may be the relevant route. You can compare that with the other methods on the Bridport base overview.

Ground screw testing for your installation

Where the foundation design calls for load evidence, agree the testing alongside the installation programme. Pull-out, compression and lateral tests examine upward, downward and sideways response respectively. The Bridport testing service can be commissioned separately, including for suitable screws fitted by another installer.

Installation torque monitoring records resistance to turning during driving. Specialist torsional testing instead applies a twisting load as a separate assessment. Both are price on application, with their own agreed scope; neither is automatically included with installation or physical load tests. Tell us about a requested record or test early so the appropriate work can be planned.

Planning a Bridport garden building

For a proposal in Bridport, West Bay or the surrounding Dorset villages, use Dorset Council's planning contacts for property-specific planning questions. Its conservation-area information includes an address map, while building control concerns separate requirements. These checks can run alongside an enquiry to us; share relevant approved details when they become available.

When arranging the building order, ask which company supplies the frame and who connects it to the foundation. Give the supplier the agreed support information before fixing its delivery and assembly programme. If you are still comparing models, Groves has a garden-building display at its Bridport site, West Bay Road, DT6 4BA. Check current models before visiting and obtain the foundation instructions for the one you choose.

Find our full local offer on the Bridport overview, or browse other Dorset service areas.

Installation areas around Bridport

We welcome enquiries from Bridport town centre, West Bay, Bothenhampton, Walditch, Bradpole, Allington and West Allington, Skilling, Court Orchard, Cherry Tree, Dibden View, Hazelmead, Meadowlands, Coneygar, Watton Hill, North Mills, St Andrews Road, Gore Cross and Pymore.

Nearby places include Symondsbury, West Mead, West Cliff, Eype, Broadoak, Chideock, Seatown, Morcombelake, Ryall, Whitchurch Canonicorum and Charmouth.

We also welcome enquiries from Dottery, Salway Ash, Melplash, Netherbury, Waytown, Oxbridge, Atrim, North Bowood, South Bowood, Wooth, Silkhay, Mangerton, Whitecross, Filford, Hincknowle and Loscombe, with Stoke Abbott and Beaminster nearby.

Other surrounding villages include Loders, Yondover, Uploders, West Milton, Powerstock, Nettlecombe, North Poorton, Askerswell, Shipton Gorge, Chilcombe, Burton Bradstock, Swyre, Puncknowle, West Bexington and Litton Cheney.

DT6, nearby DT2 and DT8 addresses are useful examples when enquiring. Give the complete postcode and site address so we can confirm the visit, access and quoted work. Find other towns through our Dorset service areas.

Feedback on Craig’s earlier work

Feedback on Craig’s earlier groundwork and customer service.

"Craig and the team are absolutely fantastic. From courtesy, to standard of work, to tidiness — everything exceeded expectations. The job was arranged, booked and done extremely quickly and we are very happy with the results. Nothing was too much trouble, and communication was easy."
— Verified CustomerMyBuilder · SO · Cobble edge and gravel strip
"Craig and his crew were excellent from the first communication, quote, timing of work and quality of work. Highly recommended."
— Verified CustomerCheckatrade · BH20 · Garage base

Ground screw installation FAQs

Does the building need its own structural floor?

A ground screw foundation supports a suitable floor or frame at selected points. The building therefore needs a floor arrangement capable of spanning between those supports. Let us know what comes with the chosen model so we can establish whether its floor, an additional frame or a different base method is appropriate.

Can you quote just the installed screws?

Yes. One option is installed screws with the frame supplied by others. We need the agreed bearing and connection details so the supports suit that frame. The written scope identifies the foundation work we provide and the frame, floor and connection tasks carried out by your other contractor.

What is included when you supply a timber frame?

The quotation states the timber frame supplied with the installed screw foundation, including the agreed outline and support arrangement. Share the building requirements so that frame can be confirmed for its intended use. We also clarify who supplies the floor coverings, insulation and other layers included in the building.

Can I discuss a steel frame instead?

Yes, steel and other non-standard frame arrangements can be discussed for an individual quotation. Provide any supplier or designer details already available, or start with the building idea. Its frame specification and connections need to be established before the foundation work and price are confirmed.

How do we agree the finished floor height?

Work back from the building's intended entrance and complete floor construction. The frame and floor layers sit above the screw heads, so their dimensions need to be considered with the surrounding path or garden. We agree the foundation level for that arrangement and make the following construction responsibilities clear.

What determines the screw specification?

The required building loads, support layout, connection details and assessment of the ground inform the specification. Relevant investigation or testing can be agreed where needed. We establish those requirements with the responsible designer or supplier as the foundation is developed, then confirm the installation scope.

Can an old concrete base remain on the footprint?

Describe its position and what you know about its construction. We need to assess how the proposed supports and frame relate to it, including access to the installation positions. Any breaking out, clearance or disposal is agreed explicitly, so you know what will remain and what preparation is included.

What should I tell you about buried services?

Share known routes, available drawings and any visible service features near the building position. Service checks and responsibilities must be settled before the screws are installed. You can begin the enquiry without those records and add them as the site preparation and support layout are being confirmed.

Can a screw foundation work where the ground changes level?

It may suit a raised framed building, subject to the required support and site assessment. The frame height, connections and stability need to work together across the footprint. Show the proposed position and intended entrance so we can discuss the arrangement and any additional design or preparation needed.

When should the building supplier become involved?

Once you have a model in mind, ask for the floor and foundation instructions and share them with us. This helps coordinate support positions before the order and assembly dates are fixed. If you are still choosing, we can start with the purpose and approximate size and explain the foundation options.

Will the installation include a load test?

A required load test is identified and quoted separately in the project scope. Agree what evidence the designer needs and when it should be available, allowing the installation and building programme to be coordinated. The local testing page explains pull-out, compression and lateral methods and testing-only enquiries.

How does torque monitoring fit into installation?

It records turning resistance while a screw is driven, if that monitoring has been requested and agreed. It is price on application and not automatically included. A specialist torsional test applies a separate twisting load, also price on application; physical pull, compression and lateral tests address their own loading directions.

How long should the screws last, and what is guaranteed?

Correctly specified hot-dip galvanised screws have an expected lifespan of 50 years or more, subject to ground conditions and correct installation. JustBases' full ten-year guarantee covers installation workmanship and the foundation materials we supply, subject to the written quotation. The building supplier's warranty and any testing evidence are separate matters.

What do you need for the first conversation?

Tell us the building you want and the postcode. A rough size, preferred position or supplier link is helpful if you have one, but you can enquire before the plans are complete. We can explain the checks needed for a quotation and arrange a closer site assessment where useful.

Get a written installation quotation

Explain the building and where it will go. Craig can discuss the supports, frame options and practical work before confirming the quotation. Send your installation enquiry, call 01202 039753 or use WhatsApp.