A poured concrete base before the building is fitted

Concrete base installation in Brockenhurst

JustBases prepares and installs poured concrete bases in Brockenhurst and the neighbouring villages. We can provide the continuous slab your building needs, with the floor level, supporting construction and finish agreed before the work starts.

Poured bases for garden buildings and useful floors

A poured slab creates a continuous foundation across the agreed footprint. That can give you a durable floor in its own right or support a building with additional floor layers above it. Tell us what you expect to stand, store or work on the surface so the intended use forms part of the foundation discussion.

The supplier's support detail helps determine which arrangement is appropriate. A single poured slab, individual paving slabs laid on mortar or concrete, and a framed floor on separate supports do different jobs. You can compare those alternatives through the Brockenhurst overview while we discuss the concrete option for your building.

Shed bases

Shed bases

Provide the required level bearing area for the shed's floor or wall system, with dimensions taken from the model's foundation instructions.

Learn more: Shed bases
Browse 74 application guides

Concrete base prices in Brockenhurst

The guide tables show poured-base options for the listed sizes and shapes. Use them when considering the building footprint, then request a quotation covering the actual preparation and slab required at your property.

What affects your quotation

The supporting ground preparation, finished levels and slab specification affect the work as well as its dimensions. We also establish how materials will reach the footprint, what needs excavating and whether an old base or other material must be removed. Disposal and any separate clearance are included where agreed.

Tell us about the planned floor finish and any specified reinforcement, membrane, insulation or service provision. Those details can be developed with the building supplier or designer, then reflected in the written scope before installation is arranged.

Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.

Rectangular poured bases: all guide sizes
SizeGuide price
8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² From £805
10' x 6' 3m x 1.8m 60 ft² / 5.57 m² From £957
10' x 8' 3m x 2.4m 80 ft² / 7.43 m² From £1,159
12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² From £1,260
12' x 10' 3.6m x 3m 120 ft² / 11.15 m² From £1,412
14' x 10' 4.2m x 3m 140 ft² / 13.01 m² From £1,513
16' x 10' 4.8m x 3m 160 ft² / 14.86 m² From £1,716
18' x 10' 5.4m x 3m 180 ft² / 16.72 m² From £1,817
20' x 10' 6m x 3m 200 ft² / 18.58 m² From £2,019
Corner, hexagonal and octagonal poured bases

Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.

Corner
SizeGuide price
7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² From £805
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £957
9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² From £1,159
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,260
Hexagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £815
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,245
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,610
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £1,944
Octagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £815
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,245
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,610
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £1,944

No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.

Ask us to quote your concrete base

Start with what the base will support and the postcode. You can add an approximate size, a supplier link or photographs if available. If the building is still being chosen, we can begin with the idea and explain which details will be needed to confirm the price.

Request your free quote

Tell us what you want to put on the base and where it will be. A simple outline is enough to begin.

Your enquiry

Concrete bases in Brockenhurst

Please provide either an email address or a phone number.

Add site photos, video or a drawing (optional)

Upload up to 5 photos or a short video of your site to help us provide an accurate quote.

0/5 files. JPG, PNG, WebP, PDF, MP4, MOV accepted — up to 100MB each.

Free, no-obligation quote. Your details are used to respond to this enquiry; see our privacy policy.

Preparing, pouring and handing over the base

We agree the foundation work before booking it, including the condition in which the site will be available and the building stage that follows. This helps you coordinate clearance, the base and the supplier's installation without leaving gaps between their responsibilities.

Confirm the supporting footprint

The chosen building's foundation plan establishes the bearing dimensions and any required edge details. We agree the position and finished level with reference to the entrance and surrounding surfaces. Proposed floor layers and service openings can be included in that setting-out plan.

Prepare the foundation

The work area is excavated and prepared to receive the specified slab construction. The supporting layers are formed and compacted as required, and the formwork sets the concrete's outline. Any specified moisture protection or reinforcement is arranged before placing the concrete.

Place and finish the concrete

The concrete is installed to the agreed dimensions and level. Finishing follows the planned use of the surface, whether it will remain exposed or have another floor above it. Edges, openings and thresholds are completed to the agreed detail.

Agree when the next stage can begin

The fresh slab needs suitable protection and curing time. We explain when access is appropriate and when the building or intended loads may be introduced. These are different stages of readiness, so the handover advice should guide the delivery and assembly programme.

Access and the site you are starting with

Show us the whole route from the unloading point to the proposed base, including any restricted gateway, corner or step. We can discuss material handling from those details and identify anything that needs to be cleared or arranged beforehand. A few connected photos often explain the route more easily than a list of measurements.

If you have an existing slab, let us assess it in relation to the new building before agreeing the next work. Its size, condition and height may affect whether it can be used or needs removal. The quotation should describe any breaking out and disposal, so you know the starting point for the replacement foundation.

Site clearance also needs a clear scope when another contractor is removing a building. Agree who takes away the floor, old supports and other remaining material. Let us know what will be left for our preparation work and whether the access route will stay available throughout.

Finally, consider how you will enter the finished building. The top of the slab, any upper floor layers and the adjoining path or garden level need to work together. Tell us about future landscaping and service routes now, so these can be coordinated while the position and levels are being agreed.

Confirm the building proposal and foundation detail

When developing a garden-building proposal, the New Forest National Park planning pages provide a property check before you send a planning enquiry to the authority. Enter the property's address to identify the planning authority for your building. The Park Authority handles planning within its area, with neighbouring council services applying outside it.

The interactive property map can help you find planning history and relevant property information. Building regulations are handled separately by the relevant council, including New Forest District Council for properties in its area, as explained in the Park's planning FAQ. Ask the responsible authority about the complete building proposal, including any planning or building-regulation requirements.

Keep the foundation discussion moving while those building details are established. You can contact JustBases at the idea stage. When a supplier's plan, approved layout or other confirmed requirement becomes available, pass on the parts affecting the base dimensions, position, level and construction before the work is finalised.

Brockenhurst and surrounding places

We welcome concrete base enquiries in Brockenhurst village and the residential areas around Waters Green, North Weirs, South Weirs, Culverley Green and Balmer Lawn. The surrounding area includes Rhinefield and Rhinefield Road, Setley, Dilton, Roydon and Hincheslea.

Nearby communities from which you can enquire include Sway, Shirley Holms, Battramsley, Boldre, Pilley, Pilley Bailey, Bull Hill and East Boldre; Tiptoe, Hordle, Everton, Wootton and Holmsley; and New Milton, Ashley, Bashley and Barton on Sea. We also welcome enquiries from the neighbouring Lyndhurst, Lymington and Burley areas. Give us the actual property address so we can discuss the work and travel for that site.

SO42 includes Brockenhurst addresses, with SO41 examples around Sway and Boldre, SO43 around Lyndhurst, BH24 around Burley and BH25 around New Milton. These are useful location references rather than whole-district commitments. Send the full postcode and any entrance directions needed when arranging a visit.

Feedback on Craig’s earlier work

"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
— Alan, ChristchurchMyBuilder · BH23 · Concrete base
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
— Paul Leister, BroadstoneMyBuilder · BH18 · 6m x 4m Concrete shed base

Concrete base questions

Can I compare a paved base with poured concrete?

Yes. Tell us whether your building has its own floor and what surface you want to use inside it. We can discuss which construction meets those needs: a continuous poured slab or individual paving slabs laid on concrete or mortar. The supplier's support instructions help establish the suitable options before we quote.

Can a building with its own timber floor sit on concrete?

It may, where the supplier specifies that supporting arrangement. The slab then needs to suit the floor bearers and the building's moisture and ventilation details. Send the manufacturer's foundation instructions when you have them so the base can be agreed for that particular floor system.

What should the quotation tell me?

It should describe the base being installed and the preparation included in its price. That covers the agreed dimensions, construction and finish, along with any clearance, old-base removal or disposal. It should also make clear which parts of the project remain with you or another contractor before the foundation work begins.

Can I ask about a corner or shaped building?

Yes. The guide schedules include shaped options, and the final setting out follows the chosen building's actual base plan. Ask the supplier for that plan once you select the model. It lets us establish the outline and bearing area and quote the required formwork and preparation.

Why is preparation beneath the concrete important?

The slab needs the agreed support below it as well as the correct concrete construction. Excavation, the condition of the supporting ground and the specified sub-base are considered when planning the work. The agreed work covers preparation as well as concreting.

Could the base from my old shed be used again?

Show us the existing base and tell us what will replace the shed. We can discuss the checks needed on its dimensions, condition and finished level. If it is not suitable for the proposed building, removal and a replacement can be quoted with the new requirements established from the outset.

Will you need to see the garden access?

Photographs are often a helpful start, particularly if the route has a restricted gate, several turns or steps. We may need to see it more closely to agree the working method. You can make the initial enquiry without measuring the whole route; we will explain the relevant access information as the work is planned.

How can the doorway meet my path neatly?

Consider the building's finished floor height, its threshold detail and the path together. Any insulation or floor above the slab affects that relationship. Show us the surrounding surfaces and tell us about planned changes so the level can be agreed before the foundation is set out.

When should service routes and floor layers be decided?

Bring them into the discussion before concreting. The building supplier can confirm the floor build-up, while the relevant trades establish any ducts or openings needed for services. Passing on those details gives us the opportunity to include the agreed provisions and avoid leaving important interfaces unresolved for the next contractor.

Can the base carry a hot tub or substantial equipment?

We can discuss a base specified for the chosen installation. Provide the manufacturer's operating loads and support requirements, including the location of concentrated loads where relevant. A foundation design establishes the construction and any reinforcement needed.

How do I know the slab is ready for assembly?

Follow the agreed handover and curing advice for your project. Light access, building assembly and introducing the full working loads can have different requirements. We will discuss that sequence so you can arrange the next visit at the stage advised for the base.

Can I ask for a base quote while checking the building's permissions?

Yes. Contact us with the intended project and postcode while you work through the proposal. The authority's advice and the supplier's final foundation details can be incorporated as they become available. Any confirmed requirement affecting the base needs to be agreed before construction, but it does not prevent an initial conversation.

Get your base project under way

Call 01202 039753, send a WhatsApp message or use the form above. Tell us the building you have in mind and its postcode, and we can discuss the foundation work and a written quotation.

For the other methods, visit the Brockenhurst base overview or ground screw installation page. We also offer standalone ground screw testing locally. Read the poured concrete guide for more detail, or find other town links under Hampshire locations.