A poured concrete base before the building is fitted

Concrete base installation in Chichester

JustBases installs poured concrete bases around Chichester, providing continuous support for garden buildings and a solid floor where specified for the use. We plan the footprint, ground preparation and finished level with your building, then pour and finish the slab to the agreed scope.

Concrete bases for your project

A poured base creates a continuous surface beneath the building. It is useful when you want dependable bearing across the agreed footprint, a solid internal floor, or a foundation that fits the supplier's slab requirements. The building's use determines what preparation, concrete construction and finish are appropriate.

We agree the top of the slab with the floor and doorway, not just the ground outside. Any floor layers above it, moisture detail and building fixings need to be coordinated before the levels and dimensions are settled.

Shed bases

Shed bases

The slab needs to suit the shed's base rails or floor bearers and its fixing detail. Send the selected model's base dimensions when available, and tell us whether the shed has its own floor or will use the concrete surface.

Learn more: Shed bases
Workshop floors

Workshop floors

A concrete floor can provide a practical surface for working and storing equipment. Discuss machinery, benches and any concentrated loads so the specification and finish address the workshop's intended use and access through the door.

Learn more: Workshop floors
Garden rooms

Garden rooms

A room built over a slab may also need insulation and other floor layers. We coordinate the supplier's foundation instructions with that build-up, allowing the top of concrete and finished entrance height to be agreed together.

Learn more: Garden rooms
Greenhouse bases

Greenhouse bases

A full slab gives a greenhouse a hard floor, while a layout with open growing space needs a different foundation arrangement. Decide on the planting and paths first, then match the perimeter, doorway and anchoring to the greenhouse.

Learn more: Greenhouse bases
Browse 74 application guides

Concrete base prices in Chichester

The guide prices below provide a starting point for a poured base. We price your work around the final size, preparation, concrete specification and finish, together with the route for materials and any agreed removal of the old base.

What affects your quotation

Your written quotation identifies what is included and any preparation left with you or another supplier. Let us know about floor layers, building fixings or particular loading requirements so these can be considered before the construction is agreed.

Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.

Rectangular poured bases: all guide sizes
SizeGuide price
8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² From £838
10' x 6' 3m x 1.8m 60 ft² / 5.57 m² From £996
10' x 8' 3m x 2.4m 80 ft² / 7.43 m² From £1,207
12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² From £1,312
12' x 10' 3.6m x 3m 120 ft² / 11.15 m² From £1,470
14' x 10' 4.2m x 3m 140 ft² / 13.01 m² From £1,575
16' x 10' 4.8m x 3m 160 ft² / 14.86 m² From £1,786
18' x 10' 5.4m x 3m 180 ft² / 16.72 m² From £1,891
20' x 10' 6m x 3m 200 ft² / 18.58 m² From £2,102
Corner, hexagonal and octagonal poured bases

Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.

Corner
SizeGuide price
7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² From £838
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £996
9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² From £1,207
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,312
Hexagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £848
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,296
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,675
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £2,023
Octagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £848
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,296
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,675
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £2,023

No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.

Get a concrete base quote

Tell us where the building will stand, what it is for and its approximate size, then include the postcode. If you have not chosen a model, explain the space you want and we can discuss what to obtain from the building supplier.

A drawing is not required to open the enquiry. A product link, sketch or a few photos can be supplied when ready. Ask through the form, call 01202 039753 or send Craig a WhatsApp message, and we will explain the next details needed for a written price.

Request your free quote

Just give us your contact details and a short description of what you want to build. We will guide you through the rest.

Your enquiry

Concrete bases in Chichester

Please provide either an email address or a phone number.

Add site photos, video or a drawing (optional)

Upload up to 5 photos or a short video of your site to help us provide an accurate quote.

0/5 files. JPG, PNG, WebP, PDF, MP4, MOV accepted — up to 100MB each.

Free, no-obligation quote. Your details are used to respond to this enquiry; see our privacy policy.

How we install a concrete base

The work follows the agreed footprint, levels and construction. Preparation and curing are part of the installation plan, with the building handover timed around the concrete being ready for its intended loading.

Agree the size and finished height

We establish the base position and dimensions from the building requirements. The slab level is coordinated with floor layers, the entrance and adjacent ground so the intended finished arrangement is clear before preparation starts.

Prepare the ground and edges

The agreed area is cleared and prepared, the specified supporting layers are placed and the edges formed. Any membrane, reinforcement or other specified detail is incorporated according to the agreed construction.

Place and finish the slab

Concrete is placed within the prepared footprint and finished to the agreed level and surface. The material route and working space are planned beforehand so the pour can be carried out safely and the surrounding area managed.

Protect the concrete and plan loading

We explain the protection and curing arrangements and when the slab may be used for the proposed building. Delivery, erection and heavy loading follow that advice, with timing dependent on the specified concrete and conditions.

Access, existing bases and finished levels

The material route is worth discussing early. Describe the unloading position, gates, steps, tight passages and changes in height between the road and the base. Photographs and approximate widths help us consider a practical method and identify anything needing a closer site assessment.

If an old base occupies the footprint, tell us its approximate size and construction. Removal, disposal and any retained parts are agreed in the written scope. The new foundation can then be planned from the required support and finished level, with any building move or dismantling separately coordinated.

Share known buried-service information and point out features that need protection. We consider these alongside the working area and excavation. Clearance by you or another contractor is identified before the installation visit so the area is ready for the agreed work.

The top of concrete, surrounding surfaces and door threshold need to work together. We consider how water is kept away from the building's vulnerable edges and whether paths, steps or a separate drainage detail are required within the project. A suitable base size and building detail help keep the finished arrangement practical.

Planning a concrete base in Chichester

Obtain the building supplier's base drawing or instructions once you have selected the model. The required support footprint can differ from an advertised roof or overall dimension. Include the floor construction and fixing requirements so the slab and building can be coordinated before the final quote.

For the proposed position, Chichester District Council's planning map can help identify conservation areas, listed buildings, tree protection and the National Park boundary. Check any relevant requirements for the completed building, base and associated work with the appropriate planning service; building control may need a separate enquiry. Within the South Downs National Park, planning authority rests with the National Park Authority.

Compare the other base choices in our Chichester service overview. A compatible suspended-floor building may also suit ground screws and a frame; ground screw testing is a separate service where that evidence is needed. Our West Sussex hub sets out the wider service towns.

Areas we cover around Chichester

Contact us about a poured concrete base in Chichester or these nearby neighbourhoods and villages. Your full postcode and project description let us confirm the work and site arrangements in the quotation.

  • Chichester city areas: city centre, Parklands, East Broyle, West Broyle/Minerva Heights, Summersdale, Graylingwell, Roussillon Park, Oaklands, Portfield, Whyke, Kingsham, Stockbridge, Westgate and St Pancras.
  • Fishbourne, Bosham and Southbourne area: Fishbourne, Apuldram (Appledram), Bosham, Broadbridge, Chidham, Hambrook, Nutbourne, Southbourne, Prinsted, Hermitage, Lumley, Thornham, Westbourne, Aldsworth and Woodmancote.
  • Funtington and Stoughton area: Funtington, East Ashling, West Ashling, West Stoke, Stoughton, Walderton, Racton and Lordington.
  • Lavant and Dean villages: Lavant, Mid Lavant, East Lavant, West Lavant, Binderton, West Dean, Chilgrove, Singleton, Charlton and East Dean.
  • Westhampnett and Boxgrove area: Westhampnett, Maudlin, Westerton, Boxgrove, Halnaker, Strettington, Crockerhill, Tangmere and Eartham.
  • Oving and Mundham area: Shopwyke, Oving, Colworth, Drayton, Merston, Hunston, North Mundham, South Mundham and Runcton.
  • Birdham and Wittering area: Donnington, Birdham, West Itchenor, West Wittering, East Wittering, Bracklesham, Earnley, Almodington, Batchmere and Somerley.
  • Sidlesham area: Sidlesham, Sidlesham Church, Sidlesham Common, Highleigh, Ham and Sidlesham Quay, plus nearby Selsey enquiries.
  • Aldingbourne and Pagham area: Aldingbourne, Norton, Westergate, Woodgate, Lidsey, Shripney, Eastergate, Barnham, Pagham, Nyetimber and Rose Green.
  • Postcode enquiries: PO18, PO19 and PO20, with nearby addresses in PO10, PO21 and PO22. The complete postcode helps us confirm the arrangements for your site.

Feedback on Craig’s earlier work

"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
— Alan, ChristchurchMyBuilder · BH23 · Concrete base
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
— Paul Leister, BroadstoneMyBuilder · BH18 · 6m x 4m Concrete shed base

Frequently asked questions

These answers cover slab construction, levels and coordinating the base with your chosen building.

What information helps you price a concrete base?

Start with the postcode, intended building and approximate dimensions. To agree the price, we establish the final base footprint, preparation, concrete construction and finish, plus access and any removal. A supplier drawing and route photos are useful when available, but you can begin the enquiry before obtaining them.

Should I order the slab to the building's advertised size?

Use the supplier's required base footprint and fixing detail to agree the final dimensions. Advertised sizes may refer to other parts of the building, such as its roof. We coordinate the support area with the floor, edges and doorway so the constructed slab matches the selected model.

What is the difference between concrete and paving slab bases?

A poured concrete base is formed as a continuous slab. A paving base uses separate slabs laid on an agreed concrete or mortar bed, so it has joints and a different construction. Either must suit the building's support requirements; the preferred internal floor and site work also help determine which arrangement is appropriate.

Can I work directly on the concrete floor?

Yes, where the slab is specified and finished for that intended use. Explain the workshop activities, equipment and expected loads when discussing the quote. If you plan a coating, floor covering or additional floor build-up, include that as well so the surface and finished height can be coordinated.

Who prepares the footprint?

Preparation responsibilities are set out in the written quotation. We establish what is present, the supporting construction required and whether clearance or removal forms part of our work. If you or another contractor are doing a stage, agree the required condition and level before starting it.

How are concrete thickness and reinforcement chosen?

They follow the building requirements, intended loads, supporting ground assessment and agreed construction design. We identify the appropriate specification before installation, including reinforcement where required. A workshop with particular equipment should have those loads considered along with the building itself.

Will the base need a moisture membrane?

The moisture detail depends on the building, floor construction and agreed slab specification. We coordinate any specified membrane with the building's own moisture protection and floor layers. Tell us if the space will be insulated or finished internally so those requirements can be settled before concrete is placed.

Can an old concrete base be reused or removed?

We can assess an existing base against the new building's dimensions, condition, support and levels. Where replacement is agreed, the quote identifies removal and disposal responsibilities. Share photos and explain any cracks, movement or previous alterations that you know about so the assessment can focus on what is there.

How do you set the slab height?

We start with the required finished floor and doorway, allowing for any layers above the concrete. Adjacent ground, paths and the approach to the building are considered at the same time. The agreed height should support both the building detail and practical access once the project is complete.

How is water around the base considered?

We look at the proposed slab level, its footprint and the surrounding surfaces alongside the building supplier's edge details. The aim is to coordinate the base with the way water is kept away from vulnerable building edges. If changes to paths, ground levels or drainage are needed, their design and responsibility are agreed within the project scope.

When can the building be installed after the pour?

The concrete must be protected and allowed to cure sufficiently for the proposed loading. The timing depends on the specified mix, conditions and building or equipment loads, so we agree the handover advice for your slab. Coordinate delivery and erection with that advice before booking the next stage.

Can I ask for advice before I have drawings?

Certainly. Tell us the intended use, approximate size and postcode, and describe the area where the building will go. We can discuss the base approach and explain which supplier details or site checks are needed next. Construction dimensions and specification are agreed as the project progresses.

What happens next

Request a concrete base quote, call 01202 039753 or message Craig on WhatsApp. We will discuss your building and site, establish the preparation and slab requirements, and confirm the written scope before arranging installation and handover.