
Concrete base installation in Farnborough
Give your new building a continuous poured concrete base in Farnborough. JustBases can prepare the area, form the footprint and pour and finish the agreed slab for a suitable shed, garage, workshop or garden building. We discuss the floor, its height and getting the materials to it as part of the job.
Poured bases for your building
A poured base gives continuous support across its agreed area and can provide the building’s floor. It is a different construction from individual paving slabs on a concrete or mortar bed, or separate pads beneath a frame. The building and its intended use determine the floor you need.

Shed bases
A firm, accurately sized base helps the shed fit and its doors work as intended. Confirm whether the shed includes a timber floor and what its supplier requires beneath it.
Learn more: Shed bases
Garage bases
The vehicle entrance, floor finish and connection with the driveway are important parts of the specification. Share the garage type and how it will be used when discussing the slab.
Learn more: Garage bases
Workshop bases
A continuous working floor can suit benches, storage and equipment. Identify substantial machinery and its supports so the relevant loads are considered before construction.
Learn more: Workshop bases
Garden room bases
The room’s bearing and fixing requirements establish the base detail. Discuss the finished floor and doorway height with the room supplier so both trades work to the agreed arrangement.
Learn more: Garden room bases
Log cabin bases
An exact bearing plan helps set out the slab for the cabin walls and floor. It also shows any fixing requirements that need to be considered before pouring.
Learn more: Log cabin bases
Summerhouse bases
A shaped summerhouse needs its actual foundation outline marked out. The entrance and surrounding surface can then be considered alongside the corner or polygonal footprint.
Learn more: Summerhouse basesBrowse 74 application guides
Garden & residential
Work & modular buildings
Garages & storage
Leisure & wellness
Energy & equipment
Renewable energy
Animal & agricultural
Commercial & community
Leisure accommodation
Concrete base prices in Farnborough
The rectangular, corner, hexagonal and octagonal guides below help you budget for standard poured bases. A shaped building’s final quotation follows its exact base plan. A more demanding floor or additional site work is priced for the agreed construction.
What affects your quotation
The required footprint, slab construction and finish determine the concrete work. We also consider excavation, the existing surface, finished levels, material access and any old-base removal or waste handling. The quotation records the agreed preparation and any additional design-dependent work, so you know the extent of the installation.
Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.
Rectangular poured bases: all guide sizes
| Size | Guide price |
|---|---|
| 8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² | From £845 |
| 10' x 6' 3m x 1.8m 60 ft² / 5.57 m² | From £1,004 |
| 10' x 8' 3m x 2.4m 80 ft² / 7.43 m² | From £1,216 |
| 12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² | From £1,323 |
| 12' x 10' 3.6m x 3m 120 ft² / 11.15 m² | From £1,482 |
| 14' x 10' 4.2m x 3m 140 ft² / 13.01 m² | From £1,588 |
| 16' x 10' 4.8m x 3m 160 ft² / 14.86 m² | From £1,800 |
| 18' x 10' 5.4m x 3m 180 ft² / 16.72 m² | From £1,907 |
| 20' x 10' 6m x 3m 200 ft² / 18.58 m² | From £2,119 |
Corner, hexagonal and octagonal poured bases
Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.
| Size | Guide price |
|---|---|
| 7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² | From £845 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,004 |
| 9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² | From £1,216 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,323 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £855 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,307 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,689 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £2,039 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £855 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,307 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,689 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £2,039 |
No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.
Get a concrete base quote
Tell us the postcode and what the concrete will support. An approximate size is useful if known; you can send a photo or the building supplier’s plan later. Craig will help establish what is needed to price the installation.
Request your free quote
Just give us your contact details and a short description of what you want to build. We will guide you through the rest.
Your enquiry
Concrete bases in Farnborough
How we install a concrete base
The work is planned around an agreed base and a clear handover to whoever assembles the building. We establish the construction and working arrangements before the pour.
Agreeing the footprint and finished level
We use the building requirements to confirm the supported area, shape and fixing details. The proposed top of the base is considered with the floor build-up, doorway and adjoining ground or drive.
Preparing the base area
The agreed preparation can include excavation, a suitable sub-base and forming the edges. Any membrane, reinforcement or other specified construction is included according to the project requirements. Removal and disposal are identified in the scope.
Pouring and finishing the concrete
The agreed finish matters if a floor covering will be fitted later. We place the concrete to the specified levels and finish, with delivery and handling arranged before the pour.
Curing and building assembly
We explain how the new base should be protected and when the next work can take place. Walking access, building assembly, anchors and substantial loads can need different readiness checks; agree those with the concrete and building suppliers.
Access, existing bases and finished levels
A useful access description starts where materials can be delivered and follows the route to the base. Mention steps, narrow sections and anything that limits working space. This helps us assess practical delivery and preparation.
Where an old slab remains, we need to consider whether its condition and construction are suitable for the new use. If it needs replacing, agree what is to be removed and where waste can be handled. Breaking out an existing base and pouring a new one are separate parts of the written scope.
The finished level deserves attention before the edges are formed. Show us how the building will be approached, any difference in surrounding ground height and where water currently runs or collects. The floor and doorway can then be agreed with any required drainage or separate ground work.
Planning a concrete base in Farnborough
If you need to check permissions for a proposed building, Rushmoor’s planning service explains the household-project routes and how property conditions can affect the answer. Ask about building regulations separately where relevant. These checks can proceed alongside your initial base enquiry.
For a property outside Rushmoor, find the local council using its postcode. Give the authority the actual work address and proposal when requesting its advice.
Still deciding between a solid floor and a raised construction? Our Farnborough base options include paving and post-supported timber frames, and local ground screw installation explains the screw and frame packages. Separate Farnborough screw testing is also available.
Areas we cover around Farnborough
We welcome enquiries from Farnborough town centre, Cove, Southwood, North Camp and South Farnborough, West Heath, Cherrywood, Fernhill, Empress, Knellwood and St John’s. Nearby residential areas include the Prospect Estate, Mayfield and Grange, Pinewood Park, Sycamore Park, St Christopher’s estate, the Hawley Estate and Fox Lane area, Farnborough Street, Pinehurst Road, Westmead and the streets around Queen Elizabeth Park.
Around Blackwater we also consider work in Hawley, Hawley Green, Minley, Frogmore, Darby Green and Yateley, and nearby Sandhurst, Little Sandhurst, College Town and Owlsmoor. To the east are Frimley, Frimley Green, Mytchett, Deepcut and Camberley, including Heatherside, Parkside, Old Dean, St Michaels and Watchetts.
The surrounding area includes Fleet, Ancells Farm, Elvetham Heath, Hartland Village, Church Crookham, Crookham Park, Crookham Village, Zebon Copse, Edenbrook, Dogmersfield, Ewshot and Crondall. We also welcome enquiries from Aldershot, Wellesley, Ash Vale, Ash, Ash Green and Tongham.
Send the full site postcode so we can confirm the work and travel in your quotation. Farnborough addresses include GU14; nearby examples fall within GU11, GU12, GU15, GU16, GU17, GU46, GU47, GU51, GU52 and GU10. Availability is confirmed for your address and requested service.
Feedback on Craig’s earlier work
"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
Frequently asked questions
What is included in a poured concrete base installation?
The agreed job can run from preparing the ground and sub-base through forming, pouring and finishing the slab. Its construction, membranes or reinforcement and the required finish are settled for the building. Check the written scope for excavation, taking away an old base and waste disposal, as these depend on what is needed at your property.
How is a poured base different from paving slabs?
Concrete is placed to form one continuous base, whereas a paving-slab installation uses separate units laid on a concrete or mortar bed. The building supplier may accept one or both arrangements. If you need the foundation to be the working floor, explain the use and finish you expect so the appropriate construction can be discussed.
How do you decide the finished base dimensions?
We work to the required bearing and fixing dimensions for the selected building. Ask its supplier for the base plan, which may differ from the advertised roof or overall building size. Before setting out, confirm the shape, orientation and doorway so the finished base matches the kit being delivered.
Can you make a corner, hexagonal or octagonal base?
Corner, hexagonal and octagonal work is included in the guide schedules. For installation, we use the building’s actual foundation outline, including the entrance position. The formwork and agreed slab construction are quoted for that footprint and the site where it will be built.
Can a base form the floor of my garage?
A suitable poured slab can provide the garage floor. The specification needs to allow for the building, vehicles and intended use, and the door threshold has to work with the approach. Tell us about those requirements and any garage supplier’s details before the floor level and construction are finalised.
What if a workshop will contain heavy equipment?
Workshop equipment can put concentrated loads into a small part of the floor. If its maker gives floor or anchoring requirements, pass those to the person specifying the slab and identify where it will stand. Those details are resolved before construction; an initial enquiry can begin while the equipment is still being selected.
How are concrete thickness and reinforcement agreed?
They form part of the specification for the actual building and foundation. The intended loads, support beneath the slab, fixing requirements and any design or approval requirements are considered together. Your quotation should make the agreed construction clear; we do not ask you to select reinforcement or a thickness before making an enquiry.
Can an existing slab be reused or removed?
Reusing it needs an assessment of what is there and whether it can serve the replacement building. A slab that looks level may still need its dimensions, condition or construction checked. If removal is required, we can discuss breaking it out and include the agreed handling and disposal in the work to be priced.
How can concrete reach a garden with steps or limited access?
The delivery and handling arrangement is considered for the route available. Describe where vehicles can reach, any gates or steps and the distance to the work. Photographs can make that discussion easier, and a site visit may be useful before the method and price are agreed.
How do you set the floor height on a sloping site?
Start with the required finished building floor and entrance, then consider the ground around the proposed slab. Differences in height can affect preparation and the edge construction. Any necessary retaining, drainage or other ground work needs its own agreed scope.
When can the building be assembled on the base?
The timing is agreed for the concrete, site conditions and loads involved. Protect the new surface and follow the handover advice before bringing in materials, drilling fixings or starting assembly. Later vehicle or machinery use and applied floor finishes may have additional timing requirements, so share the intended programme before the pour.
What do you need for an initial concrete quotation?
Give us the project postcode and an outline of the building or floor you need. Add the approximate size if you know it. You do not need to commission drawings first; we can explain which supplier or site details will help establish the final base and written installation price.
What happens next
We discuss the building and site, establish the preparation and floor specification, then set out a written quotation. Once the work is agreed, the installation and handover can be arranged around the building programme.
Request a concrete quote, call 01202 039753 or use WhatsApp to speak with Craig. See the Hampshire service directory for other listed towns.
