
Concrete base installation in Fleet
JustBases installs poured concrete bases in Fleet for suitable sheds, garages, workshops and garden buildings. We agree what the slab needs to support, prepare the area and pour the specified base, with its finish and curing advice matched to the next stage of your building project.
Concrete bases for your project
A concrete base can do two jobs: carry the building and provide its solid floor surface. Which of those jobs it performs affects the details we need to agree, such as the finish, floor layers above the slab and the loads it will carry.
Poured concrete creates a continuous slab. It is a separate construction from individual paving slabs bedded on concrete or mortar, and from separate supports carrying a raised frame. Our Fleet base services explain those alternatives if the building does not require a slab.

Sheds
For a floorless shed, discuss the surface you want to use inside. Where the shed has its own timber floor, confirm the bearing arrangement it needs from the concrete. We match the base outline to the required support and edge details of the model.
Learn more: Sheds
Workshops
Tell us how the workshop will be used and whether equipment will place substantial or concentrated loads on the floor. The concrete specification and any fixing requirements should account for that use, while the chosen surface finish should suit the planned work.
Learn more: Workshops
Garages
A garage base needs to work with its wall and door arrangement and the vehicles or storage it will take. The height at the entrance is agreed in relation to the drive and any floor detail, so the slab and the building can be coordinated before construction.
Learn more: Garages
Garden rooms
If the room supplier calls for a slab, share the required support and floor detail when available. We discuss what is supplied as part of the concrete work and which insulation, structural floor or finish is part of the building contract above it.
Learn more: Garden rooms_1768039694155.CrOLEM4N_1XJ4xe.webp?dpl=dpl_BC3QiZExVcAMF6meDzMb7s6ibQnq)
Greenhouses with a solid base
A full slab can provide a solid greenhouse interior where the model’s perimeter and fixing requirements accept it. Discuss growing areas and staging before choosing the scope; open soil within supported edges is a different arrangement from a complete concrete floor.
Learn more: Greenhouses with a solid baseBrowse 74 application guides
Garden & residential
Work & modular buildings
Garages & storage
Leisure & wellness
Energy & equipment
Renewable energy
Animal & agricultural
Commercial & community
Leisure accommodation
Concrete base prices in Fleet
The guide below covers the stated poured-base sizes and shapes. It is useful for budgeting while you choose the building, with the actual footprint and construction confirmed for the quotation.
The scope should tell you what happens below, within and around the slab. That includes agreed preparation and removal work as well as the concrete itself, so you know what remains for any other contractor.
What affects your quotation
The existing site, amount of excavation, route for materials and available working space influence the preparation. Old-base removal and disposal need pricing when required, while changed levels or a project-specific construction can add work beyond a standard base.
We confirm the specified supporting layers, concrete and finish with any design-dependent details, such as a required membrane or reinforcement. Tell us about tasks you will arrange elsewhere so the quotation includes the right work without overlap.
Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.
Rectangular poured bases: all guide sizes
| Size | Guide price |
|---|---|
| 8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² | From £842 |
| 10' x 6' 3m x 1.8m 60 ft² / 5.57 m² | From £1,000 |
| 10' x 8' 3m x 2.4m 80 ft² / 7.43 m² | From £1,212 |
| 12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² | From £1,318 |
| 12' x 10' 3.6m x 3m 120 ft² / 11.15 m² | From £1,477 |
| 14' x 10' 4.2m x 3m 140 ft² / 13.01 m² | From £1,582 |
| 16' x 10' 4.8m x 3m 160 ft² / 14.86 m² | From £1,794 |
| 18' x 10' 5.4m x 3m 180 ft² / 16.72 m² | From £1,900 |
| 20' x 10' 6m x 3m 200 ft² / 18.58 m² | From £2,111 |
Corner, hexagonal and octagonal poured bases
Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.
| Size | Guide price |
|---|---|
| 7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² | From £842 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,000 |
| 9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² | From £1,212 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,318 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £852 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,302 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,683 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £2,032 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £852 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,302 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,683 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £2,032 |
No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.
Get a concrete base quote
Tell us what you intend to put on the base and where it will be, starting with the postcode. Approximate dimensions help us discuss the scale; a supplier link, photograph or plan is welcome if already available.
We can begin before the building and every construction detail are settled. Use the form, call 01202 039753 or contact us through WhatsApp, and we will explain the next useful step.
Request your free quote
Just give us your contact details and a short description of what you want to build. We will guide you through the rest.
Your enquiry
Concrete bases in Fleet
How we install a concrete base
The installation follows the agreed construction and finished level. We settle those details before preparing the site, then explain how the completed base should be protected and when the relevant building work can follow.
Confirm the required base
We establish the building’s base dimensions and position, intended loads and required surface height. The supplier’s floor and fixing details help define how it will sit on the slab. Existing structures and any separately arranged work are identified in the scope.
Prepare the supporting ground and layers
We carry out the agreed clearance and excavation, prepare the supporting layers and set the edges to the required outline. Any specified membrane, reinforcement or other construction detail is provided for as agreed before the pour.
Pour and finish the slab
We place the concrete into the prepared base and finish it for its stated role. The agreed levels and edges are important for the building installation, while any additional floor finish or work adjoining the slab follows its own specified scope.
Explain curing and handover
We give advice about the concrete’s readiness for the next operation. Careful foot access, fixing into the slab and full building or equipment loads can need different curing periods. The handover should guide the next contractor’s start, rather than the pour date alone.
Access, existing bases and finished levels
A view of the route to the footprint is useful when arranging the job. Tell us where materials can be brought to and what lies between that point and the base. Narrow openings, turns, steps and the distance through the site can affect the handling and working arrangements we quote.
An old slab needs considering against the proposed building if you want to use it again. If it is coming out, agree the extent of breaking out and disposal, and tell us whether there is an old building to remove as a separate task. That makes the preparation before the new slab clear.
Agree the finished floor with the building details before the concrete goes in. The slab, any layers above it, the door and the adjoining surface have to work together. Work on steps, drainage or landscaping belongs in the quotation when required, rather than being assumed to follow automatically from the slab.
Allow the base handover to inform delivery and assembly arrangements. The concrete’s strength development and intended load matter when deciding readiness, including later drilling or equipment placement.
Planning a concrete base in Fleet
For Fleet and the surrounding Hart properties, use Hart’s planning guidance to check the building proposal and its property map for local records and information. Check the actual address where the site is towards a boundary.
Building regulations are separate from planning permission. Hart’s building-control service is shared with Rushmoor, but the proposed building still needs the requirements relevant to its property and use established. You can discuss the base with us while obtaining that advice.
If a continuous slab is not required, compare the options on our Fleet overview or ask about ground screw installation in Fleet for a suitable framed floor. You can also see the Hampshire places we serve.
Areas we cover around Fleet
We welcome enquiries from Fleet, the surrounding Hampshire villages and adjoining border communities below. Give the site postcode so we can confirm the work, travel and visit arrangements for the actual address.
Examples include GU51 and GU52 around Fleet and the Crookhams; GU10 at Ewshot and Crondall; RG27 around Winchfield, Dogmersfield, Hartley Wintney and Hook; RG29 around Odiham and North Warnborough; GU17 around Blackwater, Hawley and Darby Green; and GU46 at Yateley.
We also install concrete bases in Farnborough (GU14), Aldershot (GU11), Farnham (GU9), Camberley (GU15), Frimley and Mytchett (GU16), and Sandhurst (GU47). For a replacement base, show what should be removed and which paths or paving must stay. Include the route from a usable unloading point so preparation, material handling and agreed disposal can be allowed for in your quotation.
See the separate Farnborough, Aldershot and Farnham services, or where we work in Hampshire.
Fleet and its residential areas
The centre, North Fleet, Blue Triangle area, West Fleet, South Fleet, Calthorpe Park area, Courtmoor, Court Manor, Ancells Farm, Pondtail, Dinorben, Velmead Road area, Basingbourne, Oakley Park area, Elvetham Heath, Edenbrook and Hareshill.
Church Crookham and Crookham Village
Church Crookham, Gally Hill, Sandy Lane Triangle, Queen Elizabeth area, Tweseldown Road area, Quetta Park, Wakefords Park, Crookham Village, Zebon Copse and Netherhouse Moor.
Crondall and Ewshot
Crondall, Rye Common, Ewshot, Beacon Hill, Warren Corner, Dora’s Green and Dippenhall.
Dogmersfield, Winchfield and Hartley Wintney
Dogmersfield, Pilcot and Pilcot Hill, Winchfield, Winchfield Hurst, Winchfield Court, Beauclerk Green, Shapley, Shapley Heath, Potbridge Road area, Hartley Wintney, Phoenix Green, Hartfordbridge, Dipley, West Green, Elvetham, Hook, Murrell Green and the Bartley Heath area.
Odiham and nearby villages
Odiham, North Warnborough, Greywell, Long Sutton, Well and South Warnborough.
Other nearby Hart communities
Rotherwick, Mattingley, Hound Green, Hazeley, Hazeley Lea, Hazeley Bottom, Hazeley Heath, Heckfield, Bramshill, Eversley Village, Eversley Centre, Eversley Cross, Eversley Street, Up Green, Lower Common, Yateley, Darby Green, Frogmore, Blackwater, Hawley, Hawley Green, Minley and Hartland Village.
Neighbouring towns and the county borders
Farnborough, Cove, Southwood and Aldershot in Hampshire; Farnham, Camberley, Frimley, Frimley Green and Mytchett in Surrey; Sandhurst, Little Sandhurst, College Town and Owlsmoor in Berkshire.
Feedback on Craig’s earlier work
"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
Frequently asked questions
Details to help you plan the poured base and the building work that follows it.
Can the concrete form the floor as well as the building base?
It can where that is the arrangement required for the building. A floorless shed or workshop may use the slab as its working surface, while another building may have floor layers above it. Explain how you want to use the inside so the construction and finish are agreed for that role.
How do you establish the slab’s outside dimensions?
We confirm the base footprint and edge detail the selected building requires. The building supplier’s base plan is more useful for setting out than a general advertised size, which may include eaves or an overhang. You can still start the quotation with approximate dimensions and confirm the model details later.
What should a garage owner tell you about the proposed use?
Tell us the garage model, intended vehicles and any other substantial storage or equipment. The wall support, door threshold and relationship with the drive also need to be established. Those details help define the base construction and level, with any necessary design information agreed before installation.
Do shaped buildings need a different quotation?
The shaped schedules are a guide for budgeting, but the work follows the actual base plan. Corners, projections and required bearing areas can affect the formed outline and construction. Send the chosen model or drawing when available so the written price describes that shape rather than an assumed rectangular footprint.
Can a workshop be quoted before the equipment is chosen?
We can begin discussing it from the intended use and approximate size. Let us know that the equipment is still being selected, particularly if significant loads or floor fixings are likely. The relevant weights, positions and any design requirements need to be resolved before the construction is finalised and poured.
Does the guide price include everything needed to clear the site?
The guide is not a substitute for identifying the preparation at your site. The written quotation says which clearance, excavation, removal and disposal are included. Mention work you will do yourself or have another contractor carry out so the area is made ready under an agreed division of tasks.
Will you assess an existing slab before recommending new concrete?
We can discuss its suitability for the intended building, including its dimensions, condition, level and support. Describe what is there and send safe photographs if you can. Further assessment may be needed before deciding whether it can remain; any removal or replacement work is then quoted expressly.
How will materials reach the base if access is restricted?
We establish the practical route and handling arrangements for the job. A description or photographs of the entry, turns and steps can help us begin, with measurements or a closer assessment where needed. The agreed method and any extra handling form part of confirming the work and price.
Can the concrete level be coordinated with a garden-room floor?
Yes. The supplier’s floor build-up and doorway should be considered with the slab height and adjoining ground or paving. Tell us who supplies the floor layers and any separate entrance work. We agree the relevant levels and responsibilities before pouring so the room’s next stage has a clear base to work from.
Who sets the concrete specification?
The construction follows the building requirements, intended loads, assessed ground and any relevant designer’s information. We establish the details needed for the project and describe the agreed work in the quotation. You can ask us about the base before knowing the technical specification yourself.
Is being able to walk on the slab enough to start building?
Not necessarily. The concrete must be ready for the particular operation and loads that follow. Assembly, drilling fixings and placing equipment may need a different curing period from careful foot traffic. Follow the project handover advice and coordinate the building supplier’s attendance with that readiness.
Can I start an enquiry while checking permissions?
Yes. Contact us with the project and postcode while you establish which planning or building-regulations requirements apply. Hart provides the local guidance for Fleet, with the appropriate authority checked for border addresses. Requirements that affect construction need to be settled before the relevant work, not before an initial conversation.
What happens next
Begin with the building’s purpose, approximate size if known and postcode. We can discuss the preparation and concrete work, identify what needs confirming and provide a written quotation for the agreed base.
Request a quotation, call 01202 039753 or use WhatsApp. We then agree installation arrangements and the curing handover needed for your project.
