
Concrete base installation in Frome
JustBases builds poured concrete bases in Frome for sheds, workshops and garden buildings. A continuous slab provides firm support beneath the building and can serve as its hard floor when specified for that use. We agree the preparation, construction and finish with you before installation.
Concrete bases for your project
A poured base gives the building a continuous supporting area, with its top surface finished for the intended floor arrangement. It is a useful option where the building or its use calls for a solid surface. The construction beneath that surface is selected for the proposed loads, building details and supporting ground.
We discuss how the concrete meets the building as well as its overall dimensions. A shed with a supplied floor, an exposed workshop slab and a greenhouse foundation each need their own supporting and edge details. A poured slab is also different from separate concrete pads or a jointed paving slab base.

Workshops
Concrete can provide a durable working surface beneath benches, tools and stored materials. Tell us about equipment that needs particular support or fixings so the proposed construction and finish can be coordinated with those requirements.
Learn more: Workshops
Sheds
The shed's foundation plan establishes the support its walls and floor require. We confirm that outline and the top level, allowing for any floor supplied with the shed and how you will move stored items through its doorway.
Learn more: Sheds
Garden rooms
An insulated room may have a separate floor assembly above the concrete. Its depth, bearing requirements and moisture details need to be coordinated with the slab, with responsibility for each part agreed between the base and room installers.
Learn more: Garden rooms_1768039694155.CrOLEM4N_1XJ4xe.webp?dpl=dpl_BC3QiZExVcAMF6meDzMb7s6ibQnq)
Greenhouses
A greenhouse's supporting perimeter and anchors need to work with the chosen interior. We can discuss the required concrete area around any planting beds or paths, using the model's foundation and door details to agree the layout.
Learn more: Greenhouses
Summerhouses
For a corner, shaped or verandah model, the foundation should follow the supplier's required outline. The support under the floor and the position of the entrance are considered before the formwork and finished height are agreed.
Learn more: SummerhousesBrowse 74 application guides
Garden & residential
Work & modular buildings
Garages & storage
Leisure & wellness
Energy & equipment
Renewable energy
Animal & agricultural
Commercial & community
Leisure accommodation
Concrete base prices in Frome
Use the poured-concrete guides for an initial budget, then request the price for your building and site. They describe a different base from paving slabs or individual pads. A shaped footprint follows the building manufacturer's actual plan when the quotation and installation details are confirmed.
What affects your quotation
The footprint, supporting preparation, concrete specification and finish define the slab work. Access, excavation, level changes and any removal of existing material also influence the installation. We identify the handling and disposal included, plus any additional design-dependent work, so the written quotation covers the agreed result.
Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.
Rectangular poured bases: all guide sizes
| Size | Guide price |
|---|---|
| 8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² | From £833 |
| 10' x 6' 3m x 1.8m 60 ft² / 5.57 m² | From £990 |
| 10' x 8' 3m x 2.4m 80 ft² / 7.43 m² | From £1,199 |
| 12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² | From £1,303 |
| 12' x 10' 3.6m x 3m 120 ft² / 11.15 m² | From £1,460 |
| 14' x 10' 4.2m x 3m 140 ft² / 13.01 m² | From £1,565 |
| 16' x 10' 4.8m x 3m 160 ft² / 14.86 m² | From £1,774 |
| 18' x 10' 5.4m x 3m 180 ft² / 16.72 m² | From £1,879 |
| 20' x 10' 6m x 3m 200 ft² / 18.58 m² | From £2,088 |
Corner, hexagonal and octagonal poured bases
Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.
| Size | Guide price |
|---|---|
| 7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² | From £833 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £990 |
| 9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² | From £1,199 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,303 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £843 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,288 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,665 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £2,010 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £843 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,288 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,665 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £2,010 |
No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.
Ask for a concrete base quote
Tell us where the work is and what the base will support. The postcode and intended use are enough to begin; add a rough size or building link if you know one. We can talk about the likely construction before detailed plans have been obtained.
We will explain which site or supplier details are needed to confirm the foundation and prepare a written quotation. Photos of the position and access are helpful when available. Enquire using the form, call 01202 039753 or message Craig on WhatsApp.
Request your free quote
Just give us your contact details and a short description of what you want to build. We will guide you through the rest.
Your enquiry
Concrete bases in Frome
How your concrete base is installed
The preparation, pour and handover are planned as a complete installation. We establish what is included and coordinate the sequence with the person fitting the building, allowing an appropriate interval before the slab is loaded.
Agree the position and dimensions
The supplier's foundation information is checked against the proposed location. We establish the slab outline, required supporting details and finished height in relation to the doorway and nearby ground.
Build the supporting preparation
The agreed clearance and ground preparation are completed, and formwork defines the concrete edges. Supporting layers, membranes, reinforcement and any other construction details follow the specification agreed for the project.
Pour and finish the slab
Concrete is delivered and placed using the planned access arrangement. The surface is finished for its intended use, with attention to the required level and edge details before the fresh concrete is protected.
Allow curing and hand over
We explain the appropriate protection and when the next work can begin. The readiness for building assembly, fixing or heavy loads follows the concrete, conditions and design requirements, with the installation handover made clear.
Getting the site ready for concrete
The delivery and working route are considered before a pour is arranged. Tell us about the unloading area, gates, passages, steps and the distance to the base. Where access affects material handling, we agree a practical method and include it in the quotation.
If a slab or paving already occupies the site, we discuss whether it should be assessed, retained or removed. Removal and disposal are quoted as agreed work. Let us know what the old foundation supported and whether any neighbouring path or structure must remain, so the preparation can be defined accurately.
The finished slab height should allow the building's floor and entrance to meet the surrounding garden properly. Include any later insulation, floor covering, threshold or separately supplied step in that discussion. Show where water currently collects or runs towards the proposed area so the level and any drainage requirements can be considered before construction.
If a landscaper or another contractor will prepare the site, agree the required footprint, level and condition with us first. The final preparation and slab then follow one coordinated specification. Building assembly and any floor fitted above the concrete remain with the party named for that work.
Planning a concrete base in Frome
Check the building proposal before committing to its foundation position. Somerset Council's planning service can advise on requirements for Frome properties, and its conservation maps and appraisals help with designated areas. Use the actual building size, height and intended use for the enquiry.
Building regulations are dealt with separately through Somerset Building Control or your appointed professional. For a site in a neighbouring Wiltshire village, identify the authority for the address through the council finder. Pass on any foundation requirements that must be included in the slab construction.
You can compare the wider Frome base services and Somerset coverage. Where the chosen building uses a raised floor, ground screw installation in Frome offers a different support arrangement; testing can be discussed separately for screw-foundation evidence.
Concrete base coverage around Frome
Ask us about a base or test in Frome and the surrounding places below. BA11 is the main local postcode district; nearby enquiries can also come from BA2, BA3, BA4, BA12 and BA13 addresses. Give us the full site postcode so the work and visit arrangements can be confirmed for that address.
- Frome town areas: town centre, Keyford, Lower Keyford, Little Keyford, The Butts, Trinity, Gould's Ground, Welshmill, Innox Hill, Packsaddle, Fromefield, Stonebridge, Clink, Berkley Down, Wallbridge, Adderwell, Easthill, The Mount, Marston Gate, Critchill, Egford Hill and Low Water.
- Selwood and the immediate surroundings: Oldford, Spring Gardens, Rodden, Rodden Down, Friggle Street, Elliots Green, Feltham, Blatchbridge, Tytherington, East Woodlands, West Woodlands, Egford and Hapsford.
- Beckington and other surrounding villages: Berkley, Beckington, Standerwick, Rudge, Lullington, Rode, Tellisford, Woolverton, Norton St Philip, Farleigh Hungerford, Laverton, Hemington, Hardington, Foxcote, Faulkland and Buckland Dinham.
- Mells, Whatley and neighbouring villages: Great Elm, Mells, Upper Vobster, Lower Vobster, Whatley, Chantry, Leigh on Mendip, Coleford, Kilmersdon, Babington, Nunney and Nunney Catch.
- Trudoxhill and adjoining villages: Trudoxhill, Marston Bigot, Witham Friary, Upton Noble, Wanstrow and Cloford.
- Wiltshire fringe enquiries: Chapmanslade, Huntenhull Green, Short Street, Thoulstone, Corsley, Corsley Heath, Whitbourne Springs, Longhedge, Lane End, Dertford, Sturford, Lyes Green and Horningsham.
Feedback on Craig’s earlier work
"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
Frequently asked questions
These questions cover the decisions that shape a concrete installation, from the surface you want to the timing of the building delivery.
Can the poured base become the floor I use inside?
It can when designed and finished for that role. Tell us about the building and activities, including substantial equipment or storage, so the construction suits the loads and surface use. If a separate floor is being supplied above the slab, its bearing and moisture details are considered instead.
How does poured concrete differ from a paving slab base?
Poured concrete forms a continuous slab within the agreed outline. A paving slab base is assembled from individual slabs on a concrete or mortar bed, leaving a jointed surface. They have different construction and finish characteristics, and we can discuss which meets the selected building's requirements.
Can you build a shaped concrete foundation?
We can discuss rectangular and shaped bases using the building's actual foundation plan. Its dimensions, bearing edges and fixing requirements need to be established before formwork is set out. The shaped price guides help with budgeting; your quotation confirms the particular outline and construction.
Who establishes the slab thickness and supporting construction?
The required construction follows the building, intended loading and ground assessment, with structural design input where needed. Share any supplier or designer requirements when available. We confirm the appropriate preparation, concrete details and additional elements before installation rather than expecting you to design the slab yourself.
Can somebody else clear or excavate the area first?
Yes, provided the preparation is coordinated before it starts. The required outline, excavation and condition for handover should follow the agreed base specification. Tell us which contractor is involved so responsibilities are clear and the concrete installation can be priced against the preparation they will actually provide.
What if there is concrete hidden beneath the existing shed?
Mention any known old foundation even if it cannot yet be photographed. Its size, condition and access influence the assessment and removal work. We identify the agreed breaking out, handling and disposal in the quotation and discuss any further inspection needed once the area becomes accessible.
How will materials reach a base at the back of the garden?
We plan the delivery and handling from the available access. Show the unloading point and route, including narrow sections, steps and turns. Those details help establish how the preparation materials and concrete will be brought in and which arrangements need to be allowed for in the price.
How is the base height coordinated with an existing path?
We consider the intended floor and doorway first, then the level of the approach. Bearers, insulation and floor finishes may raise the interior above the concrete. Share the building's threshold detail and any separate access work so the finished arrangement can be agreed before the slab is formed.
Should I mention a later floor coating or covering?
Yes, because its preparation and moisture requirements can affect the concrete finish and the order of work. Obtain the product supplier's requirements and tell us who will apply it. The time for receiving a coating or covering may differ from the time the slab can take building loads.
When will the base be ready for assembly and loading?
We establish that from the agreed concrete and construction, the curing conditions and the loads being introduced. The fresh slab is protected and given the appropriate period before the next stage. Coordinate the building delivery with that advice so installation and curing are allowed for in the programme.
Which permission checks are relevant before the pour?
Check the proposed building and property with the relevant planning authority and consider building regulations separately. Any approved foundation details or conditions affecting the base should reach us before construction is confirmed. You can still discuss the work and obtain advice while those checks are being completed.
Can you give advice before I have a manufacturer's base drawing?
Yes. Start with what the building will be used for and its postcode, plus an approximate size if known. We can explain the options and the details to obtain from the supplier. The final foundation outline and construction are confirmed before the installation goes ahead.
Arrange the next step
Send the Frome-area postcode and describe the base you need. We will help establish the installation details, give you a written price and agree the preparation and timing before work is booked.
