Concrete base installation in Gosport
JustBases installs poured concrete bases in Gosport for sheds, workshops, garages and suitable garden buildings. We discuss how the base will support the building and whether its surface will be your finished floor, then quote the preparation, concrete work and handover required for the project.
A continuous concrete base for your building
Poured concrete is useful when the project needs support across the footprint and a solid surface throughout. Its finish can be chosen for direct use or for the floor layers above it. Good preparation and the agreed construction beneath the surface are essential to that finished base.
This service is a continuous poured slab. Separate paving units laid on a concrete or mortar bed, individual pads and a suspended timber floor are different constructions. We can discuss those through the Gosport base options if they better match the building.

Shed bases
A shed can be anchored to an appropriate slab, with its own floor supported as required or the concrete serving as the internal surface. Confirm which type of shed you are buying so the base provides the right perimeter, level and fixings.
Learn more: Shed bases
Workshop floors
A concrete working floor can suit benches, equipment and regular movement. Explain the activities and contents when specifying the slab, including known heavy items or anchoring. Any later surface treatment needs to be compatible with the agreed concrete finish.
Learn more: Workshop floors
Garage foundations
The construction needs to carry the garage and its intended vehicle or storage use. Agree the supplier’s wall or post supports, fixing positions and door detail. The entrance should be considered with the adjoining drive before the slab height is fixed.
Learn more: Garage foundations
Garden-room bases
The room supplier may require a concrete foundation below its own floor system. Use its current base detail to coordinate the wall support, insulation and final floor level, so the slab is handed over for the construction that will follow.
Learn more: Garden-room bases
Summerhouse bases
A summerhouse benefits from correctly supported, level wall and floor lines. Rectangular, corner and polygonal models need their own exact outline. We can form the quoted base to the selected model’s requirements, including its doorway.
Learn more: Summerhouse basesBrowse 74 application guides
Garden & residential
Work & modular buildings
Garages & storage
Leisure & wellness
Energy & equipment
Renewable energy
Animal & agricultural
Commercial & community
Leisure accommodation
Concrete base prices in Gosport
The guide schedules below give standard poured-concrete prices for rectangular and shaped bases. Use the size nearest your proposed building to begin budgeting, then confirm the manufacturer’s exact supported outline before the quotation is finalised.
The written price identifies the construction and work we will carry out. It also distinguishes base installation from any separate building assembly or surrounding landscaping, so the project’s different costs can be understood.
What affects your quotation
The quantity of preparation and excavation, access for materials, removal and disposal of an existing base, and the finished level all influence the job. A custom outline or specified reinforcement, membrane and concrete construction can also change the work. Tell us which associated tasks you would like included so the quote covers the agreed scope.
Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.
Rectangular poured bases: all guide sizes
| Size | Guide price |
|---|---|
| 8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² | From £827 |
| 10' x 6' 3m x 1.8m 60 ft² / 5.57 m² | From £983 |
| 10' x 8' 3m x 2.4m 80 ft² / 7.43 m² | From £1,191 |
| 12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² | From £1,295 |
| 12' x 10' 3.6m x 3m 120 ft² / 11.15 m² | From £1,450 |
| 14' x 10' 4.2m x 3m 140 ft² / 13.01 m² | From £1,554 |
| 16' x 10' 4.8m x 3m 160 ft² / 14.86 m² | From £1,762 |
| 18' x 10' 5.4m x 3m 180 ft² / 16.72 m² | From £1,866 |
| 20' x 10' 6m x 3m 200 ft² / 18.58 m² | From £2,074 |
Corner, hexagonal and octagonal poured bases
Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.
| Size | Guide price |
|---|---|
| 7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² | From £827 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £983 |
| 9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² | From £1,191 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,295 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £837 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,279 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,653 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £1,996 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £837 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,279 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,653 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £1,996 |
No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.
Get a price for your concrete work
You can contact Craig with the intended use and postcode before choosing the final base dimensions. If a building has already been selected, its product link or base plan helps us understand what will follow the concrete work.
We discuss the site and what needs pricing, then explain any further checks or information needed. Send the form below, call 01202 039753 or use WhatsApp; you do not need to arrange drawings just to ask.
Request your free quote
Just give us your contact details and a short description of what you want to build. We will guide you through the rest.
Your enquiry
Concrete bases in Gosport
Preparing, pouring and handing over the base
We agree the construction and practical arrangements before work starts. That lets the preparation, concrete delivery and next building stage be planned as one sequence.
Agree the outline and floor detail
Confirm the supported dimensions and shape with the building information. Discuss the finished surface, floor height, doorway and any required openings, along with the removal or preparation to be carried out.
Prepare the position and base layers
Carry out the quoted clearance and ground preparation, form the edges and install the required supporting layers. Include any specified membrane and reinforcement, with the preparation ready for the chosen concrete construction.
Place and finish the concrete
Get the concrete to the working area using the agreed arrangement, place it within the prepared formwork and finish the surface for its intended use. The dimensions and levels follow the agreed base detail.
Protect the pour and plan the next trade
Give advice on protecting the new concrete and when different loading stages can proceed. Confirm readiness for the building and its contents with the relevant contractors rather than treating first walking access as the full handover.
Practical details before the pour
Explain how the installation team and materials will reach the proposed base. A garden path, side entrance or shared drive can form part of the route, and the working area needs room for the agreed method. Photos help show surfaces to protect and any gates, steps or turns.
If you have a building or slab to remove, describe both. Clearing the structure, breaking out its foundation, disposing of material and making good retained surfaces should each have an agreed responsibility. We can price the requested work or coordinate with preparation you arrange separately.
The finish at the top of the slab should be decided with its intended use. If insulation, flooring or a coating will be added later, obtain that supplier’s requirements before agreeing the concrete finish and construction. The total floor build-up also affects the height at the door.
Known drains, services and any planned openings should be raised while the base is being detailed. We agree the necessary checks and how the base meets the surroundings before concrete is placed. Separate drainage, paths or steps are identified where they form part of the project.
After the pour, protection and loading advice follow the actual construction and conditions. Agree the building installer’s programme with that advice, including any delivery or storage on the new base. The floor needs appropriate time to develop strength before it carries the planned loads.
Choosing a building and checking the property
If you want to see garden buildings before deciding, Johnsons’ Gosport display village is at Alver Valley Garden Centre, Barrington Close. Ask for the exact foundation instructions for the model and floor package you choose, then bring them into the concrete discussion.
Gosport’s built-heritage map provides an address search for relevant property checks. The Building Control Partnership explains planning and building-regulations approval separately and links the council planning teams. Check requirements for the complete building with the authority responsible for your site.
Our Gosport overview explains the other base methods. You can compare ground screw installation for an accepted framed floor, or check where we work in Hampshire for other towns.
Areas we cover around Gosport
We welcome concrete-base enquiries for Gosport and the neighbouring places below. Send the full site postcode and the work you are considering so we can confirm the visit, installation and travel arrangements.
Many local sites are in PO12 or PO13. The adjoining places also include parts of PO14, PO15, PO16, PO17 and SO31; the quotation is agreed for the individual address and project.
- Gosport town and nearby neighbourhoods: the town centre and harbourside, Stoke Road, Newtown, Leesland, Forton, Camdentown and Ann’s Hill.
- Alverstoke and adjoining areas: Anglesey, Gomer, Clayhall, Haslar, Stokes Bay, Brockhurst and Privett.
- Elson and Hardway: Priddy’s Hard, Royal Clarence Yard and the surrounding Gosport neighbourhoods.
- Rowner and north Gosport: Holbrook, Bridgemary, Bedenham, Fleetlands and Peel Common.
- Lee-on-the-Solent and nearby areas: Cherque Farm, Browndown, Grange and Alver Valley.
- Adjoining Fareham-area places: Stubbington, Hill Head, Titchfield, Catisfield, Fareham, Portchester, Wallington, Downend and Funtley.
- Further nearby enquiries: Titchfield Common, Hook, Warsash, Locks Heath, Park Gate, Sarisbury Green, Swanwick, Burridge and Whiteley, plus Wickham and Knowle.
Feedback on Craig’s earlier work
"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
Concrete installation FAQs
These answers explain what is useful to decide before pouring and what can be developed after your first enquiry.
Can you install the concrete as well as prepare the ground?
Yes. We can quote the preparation and poured-base construction needed for the agreed project. Describe what is already on the site and whether you want removal included. The quotation identifies our work and any preparation or related tasks left to you or another contractor.
When is a continuous slab preferable to individual paving?
A continuous slab can be useful for a building needing solid support throughout, particularly when the concrete will also be the working floor. Paving units on a concrete or mortar bed provide a different surface and construction. Compare them against the building’s accepted base, the use inside and the finish you want.
Can I put a timber shed floor on top of the concrete?
Where the shed supplier accepts that arrangement, its floor bearers can be supported by the correctly prepared slab. Follow the maker’s bearing and moisture-protection detail as well as the anchoring instructions. We need those requirements when settling the base, even though the concrete will not be the visible internal floor.
Do you pour shaped bases?
Yes, ask about the outline your building requires. The guide includes shaped schedules, while the final quotation follows the actual dimensions and formwork. A model plan is particularly useful for corners and polygonal buildings; an approximate size is still enough for the first discussion.
How should I describe the intended workshop use?
Tell us what you will do in the space and what substantial equipment or storage it will contain. Known weights, bearing points and fixing needs help establish the appropriate slab. If the floor will receive a coating or another finish, include that intention so the concrete surface can be coordinated with it.
What needs agreeing with the garage supplier?
Obtain the foundation plan, wall or post support requirements, anchor detail and door arrangement. Explain the intended vehicle use as well. Those details let the slab and its approach be considered together, including the finished level at the entrance and any work outside the main base.
Can I arrange the old base removal myself?
You can arrange suitable preparation separately, with the ready condition agreed before the new installation. Let us know what your contractor will remove and how the remaining ground and access will be left. This keeps the concrete quote clear and allows any further preparation to be identified in advance.
Will I need a particular membrane or reinforcement?
The construction is specified for the building, floor use and site. A membrane or reinforcement may be required, and its detail must work with the rest of the base. We establish those requirements before quoting the final construction.
Could a long route to the garden affect the price?
Yes. Material handling and the practical pouring arrangement depend on the route as well as the slab area. Describe the distance, entrances and changes in level, with photos if convenient. We assess the work and confirm the agreed approach and price before the installation is booked.
When should service openings and drains be discussed?
Raise them while the base plan is being developed. Share known service information and any proposed connections so suitable checks and details can be agreed before excavation and pouring. If another contractor is supplying drainage or services, coordinate its work with the foundation scope.
How will I know when the base can be used?
We give project-specific protection and loading guidance at handover. The concrete may be walkable before it can carry assembly work, stored materials or the building’s full use. Agree the relevant stages with us and the building installer, using the actual concrete and conditions rather than a universal waiting period.
Can you quote before I have a supplier’s drawing?
Yes. Begin with the postcode and the kind of building or floor you need, adding an approximate size if known. We can discuss the likely work and budget, then identify the information needed for the final dimensions and specification. Plans are useful later, not a condition of making contact.
Discuss your Gosport concrete base
Tell Craig what the base will support through the concrete enquiry form, by calling 01202 039753 or on WhatsApp. We will discuss the preparation and construction, then provide a written quotation.
For a question about existing screws rather than a new slab, see Gosport ground screw testing. It can be booked separately.