Ground screws before installation

Ground screw installation in Lyme Regis

JustBases installs ground screws ready for the agreed frame beneath your Lyme Regis garden building. We coordinate the supports with its floor construction, install and check the foundation, and make clear which frame and connection work each party provides.

Ground screws for your building

A screw foundation carries loads at agreed support points. The building or floor frame transfers those loads through its connections to the screws and into the ground. We coordinate the positions, heights and connections with the building’s requirements.

Where suitable, this concentrates the foundation work instead of excavating the full area for a slab. It can reduce spoil and bulk material movement, while providing supports for a level framed construction. Once installed and checked, the agreed frame can follow without waiting for concrete to cure.

Garden rooms

Garden rooms

The room’s floor construction determines what the foundation has to carry. We agree the support arrangement with the maker’s details, including frame responsibility and the finished height needed for the room.

Learn more: Garden rooms
Log cabins

Log cabins

A cabin’s bearers need support in the positions required by its design. We use those requirements to discuss the screw foundation and compatible frame, keeping the base ready for the cabin installer’s next stage.

Learn more: Log cabins
Summerhouses

Summerhouses

A raised frame can support a suitable summerhouse with its floor clear of direct ground contact. The base shape, entrance and fixing requirements are considered together when confirming the arrangement.

Learn more: Summerhouses
Sheds

Sheds

For an accepted shed floor, a screw-supported frame can provide the required support beneath it. The quotation makes clear whether we are supplying that frame or installing the supports for another supplier’s construction.

Learn more: Sheds
Workshops

Workshops

The intended workshop use belongs in the foundation discussion. Equipment and concentrated loads must be allowed for in the floor, frame and supports, with connections appropriate to the agreed construction.

Learn more: Workshops
Browse 74 application guides

Ground screw prices in Lyme Regis

The price guide distinguishes the installed foundation from the frame above it. We confirm the actual building, layout, access and site requirements in the written quotation; larger or nonstandard arrangements are individually priced.

Installed ground screws — frame by others

This option is for the installed supports where another party provides the frame. We agree the bearing positions, finished support heights and connections needed for that frame, and make the division of work clear.

Installed screws with a timber frame

This option includes the stated timber support frame with the screws. It must suit the chosen building and its floor requirements. Steel and other nonstandard frame packages are quoted separately.

Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.

Building sizeInstalled ground screwsFrame by othersInstalled screws + timber frame
8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² From £1,252From £1,750
10' x 8' 3m x 2.4m 80 ft² / 7.43 m² From £1,358From £1,856
12' x 10' 3.6m x 3m 120 ft² / 11.15 m² From £1,485From £1,962
16' x 10' 4.8m x 3m 160 ft² / 14.86 m² From £1,591From £2,175
20' x 10' 6m x 3m 200 ft² / 18.58 m² From £1,697From £2,599

No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.

Get a ground screw quote

Tell us what you want to support and the postcode. A rough footprint and description of the proposed position will help if you have them. We can discuss the options while your building choice is still developing.

The supplier’s support plan, photos or drawings can be added when available. We establish what further information or assessment is needed before agreeing the installation.

Request your free quote

Just give us your contact details and a short description of what you want to build. We will guide you through the rest.

Your enquiry

Ground screw installation in Lyme Regis

Please provide either an email address or a phone number.

Add site photos, video or a drawing (optional)

Upload up to 5 photos or a short video of your site to help us provide an accurate quote.

0/5 files. JPG, PNG, WebP, PDF, MP4, MOV accepted — up to 100MB each.

Free, no-obligation quote. Your details are used to respond to this enquiry; see our privacy policy.

How ground screws are installed

The installation is planned around the approved building and frame arrangement. We establish what is being fitted and what the next contractor needs before setting out the supports.

Ground screws positioned around a marked building footprint

Confirm the support positions

We coordinate the building’s loads and bearing requirements with the support layout and finished heights. The plan also identifies who provides the frame and the agreed connections.

A ground screw being installed at a support position

Install and check the screws

After the relevant site and buried-service checks, the screws are set out and installed to the agreed arrangement. We check positions and finished levels; an obstruction is assessed and any necessary layout change agreed before proceeding.

Artist’s impression of a timber garden building above a screw-supported frame

Complete the agreed frame and handover

We complete the frame work included in the quotation and explain the foundation handover to the building installer. Required records and any separately commissioned monitoring or testing are confirmed within their own scope.

Access, ground conditions and existing foundations

We assess the ground and building requirements when selecting the screw specification and support arrangement. Finished heights also account for the frame and floor above them. A suspended base can accommodate suitable level differences through its designed supports and connections.

Tell us about the route into the work area and anything that needs to remain in place. Gates, steps and working room around the proposed footprint are useful details when planning access. We can discuss those from your description, with photographs or a visit where helpful.

Known buried services and retained foundations need considering before installation. Share any available information about them. The relevant checks and safe working arrangements are part of planning the work; please leave existing construction undisturbed while we discuss it.

Ground screw testing in Lyme Regis

Some projects need site evidence as part of selecting or assessing the foundation. We offer ground screw testing in Lyme Regis separately, including suitable trial installations and existing screws fitted by another installer.

Pull-out, compression and lateral tests apply upward, downward and sideways loads respectively. The appropriate test and criteria are agreed for the project. Recorded results and a written report are supplied, with project-specific load calculations within the agreed quotation scope.

Installation torque monitoring records turning resistance while fitting the screws. Specialist torsional testing is a separate applied twisting test. Each is priced on application and neither is automatically included in the installation or physical testing.

Planning your installation in Lyme Regis

Let us know which floor and frame components the building supplier will provide. Its requirements help us coordinate the foundation package, leaving a clear handover for the building assembly.

Check property matters with the council for the work address. Dorset Council’s guidance is useful for Lyme Regis and Charmouth; East Devon’s guidance covers Uplyme and Combpyne Rousdon. Building Regulations approval is separate from planning. You can ask about installation while developing the proposal.

Compare the other options on our Lyme Regis base services page, including poured concrete installation where a continuous slab is needed. The Dorset service area shows where you can enquire beyond this town.

Areas we cover around Lyme Regis

Ask us about work in Lyme Regis and the neighbouring Dorset and Devon villages below. Send the full work address or postcode so we can confirm the job arrangements and include travel in the written quotation.

Useful district examples are DT7 around Lyme Regis, Uplyme and Rousdon; DT6 around Charmouth, Marshwood and Bridport; EX13 around Axminster, Hawkchurch and Kilmington; EX12 around Axmouth; and TA20 around Thorncombe. Please give the complete postcode for the proposed work.

For nearby projects, you can also explore our services in Axminster, Seaton and Bridport, or check the Dorset service area.

Lyme Regis centre, Cobb and adjoining areas

Town centre, Cobb, Silver Street, Pound Street, Coram Court, Holmbush and West Hill.

Woodmead, Colway and adjoining areas

Woodmead Road, Hill Road, Colway Mead, Colway Lane, Lym Close, Charmouth Road, Anning Road, Kingsway, Summerhill Road, Fairfield Park, Pine Ridge, Queens Walk, Henry’s Way, Timber Hill, Dragon’s Hill, Haye Lane, Haye Close, Haye Gardens, St George’s Hill, Woodroffe Meadow, Somers Road and Uplyme Road.

Uplyme and its hamlets

Uplyme, Yawl, Burrowshot, Ware, Cannington, Shapwick, Holcombe, Woodhouse Hill, Cathole, Springhead, Rocombe and Harcombe.

Raymond’s Hill and the Axminster area

Raymond’s Hill, Hunters Lodge, Blackpool Corner, Monkton Wyld, Axminster, Kilmington and Musbury.

Rousdon, Combpyne and the Axmouth area

Rousdon, Combpyne, Whitlands, Dowlands, Pinhay, Axmouth and Seaton.

Charmouth and Char Valley villages

Charmouth, Catherston Leweston, Wootton Fitzpaine, Whitchurch Canonicorum, Fishpond Bottom, Ryall, Morcombelake and Stanton St Gabriel.

Marshwood and nearby border villages

Marshwood, Birdsmoorgate, Bettiscombe, Thorncombe and Hawkchurch.

Chideock and Bridport area

Chideock, Seatown and Bridport.

Feedback on Craig’s earlier work

Feedback on Craig’s earlier groundwork and customer service.

"Craig and the team are absolutely fantastic. From courtesy, to standard of work, to tidiness — everything exceeded expectations. The job was arranged, booked and done extremely quickly and we are very happy with the results. Nothing was too much trouble, and communication was easy."
— Verified CustomerMyBuilder · SO · Cobble edge and gravel strip
"Craig and his crew were excellent from the first communication, quote, timing of work and quality of work. Highly recommended."
— Verified CustomerCheckatrade · BH20 · Garage base

Frequently asked questions

More about the installed supports, frame choices and planning the work.

What kind of building can use a ground screw foundation?

A building needs a floor or supporting frame that can transfer its loads to the agreed screw positions. Suitable garden rooms, cabins, sheds, summerhouses and workshops can use that arrangement. We assess the actual building requirements and site before confirming the foundation, including any frame supplied with it.

What do you install if my supplier provides the frame?

We can quote the installed screws for that frame, with support positions and heights coordinated to its requirements. The connection detail and who fits it must also be agreed. This gives the frame supplier the foundation it needs while keeping its work separate from ours in the quotation.

Can you provide the timber frame as well?

Yes, we offer the stated screws-and-timber-frame option for suitable buildings. We confirm how the building’s own floor bears on it and any connection requirements before agreeing the package. The support frame should not be confused with the room’s complete floor, insulation or internal finish.

How is a steel-framed building priced?

Steel or other nonstandard arrangements need an individual quotation. We discuss the frame design, loads and connection details and establish which party supplies it.

Why can screws reduce the amount of ground preparation?

They put support at the selected bearing points instead of requiring a continuous slab across the footprint. On a suitable project this reduces full-area excavation and the movement of soil and concrete. Clearance and site preparation may still be needed, and the installed arrangement must suit the ground and building.

Who agrees the layout beneath the building?

The support plan brings together the building’s bearing requirements, loads, ground assessment and the frame connections. We coordinate those details with the supplier or responsible designer before installation. That establishes where the supports go and the heights the frame will use.

Can installation continue through different seasons?

Ground screw installation can be planned throughout the year and has no concrete curing period. Actual ground conditions, weather and safe access still affect when work can proceed.

How should I show you the access route?

If convenient, send photos from the approach into the work area and mention gates, steps or other restrictions. Approximate dimensions can help where the route is narrow. A description is enough to start; we can decide together whether more detail or a visit would be useful.

What happens where an old foundation or buried service is present?

Tell us what you know and share any records already available. We consider retained construction and carry out the relevant checks before fitting supports. If a position conflicts with an obstruction or service, the installation needs a safe, agreed response; leave excavation and structural changes until the work is planned.

When is the base ready for the building installer?

Once the agreed supports and any quoted frame work are complete and checked, there is no concrete curing delay before the next stage. The handover identifies what is ready and any remaining frame or connection work by others. Coordinate the building delivery with those arrangements.

Is physical load testing included with installation?

It is a separately agreed service, selected for the project’s evidence requirements. If a designer or approval process needs testing, raise it when discussing the foundation so the method and timing can be arranged. Our local testing page also covers suitable trial and existing screws without an installation order.

How are installation torque monitoring and torsional testing different?

Monitoring records the resistance to turning as a screw is driven into the ground. A specialist torsional test deliberately applies a twisting action to assess the agreed rotational response. They are different services, each priced on application and neither automatically included with installation or physical load tests.

What protection applies to the installation and supplied materials?

The full 10-year JustBases guarantee covers installation workmanship and the screws and foundation materials we supply, subject to the written quotation. Correctly specified hot-dip galvanised screws can have an expected lifespan of 50 years or more, depending on ground conditions and correct installation. The building supplier’s warranty is separate.

Can I enquire before the building order is final?

Yes. Tell us what you are considering and the postcode, with a rough size if known. We can explain the foundation and frame options at that stage. The selected building’s support details and the final installation scope are agreed before work, rather than being required to start the conversation.

What happens next

Request your ground screw quotation, call 01202 039753 or use WhatsApp to describe the project. We will discuss suitability and frame responsibility, agree the written work and price, then arrange the installation and handover.