
Concrete base installation in Lymington
JustBases installs poured concrete bases in Lymington, Pennington and nearby villages. A properly prepared slab gives your building continuous support and can provide a practical floor, with its size, levels and construction agreed for the building you choose.
A concrete base for the building you have chosen
Concrete gives a building a firm, continuous platform rather than a set of individual supports. It is useful where walls, floor bearers or equipment need the support of a slab, and where you want a durable surface beneath everyday use.
Start with the building supplier's base requirements. The foundation may become the finished working floor, sit below a separate timber floor, or carry an insulated floor build-up. Agreeing that arrangement early lets us position doors, edges and any required fixings correctly.

Shed bases
A level slab supports the shed's bearers and helps the wall panels and doors assemble squarely. The base footprint follows the chosen shed's requirements.
Learn more: Shed bases
Garden room bases
Bring the floor construction, insulation and threshold level into the foundation discussion so the finished room meets its surrounding access neatly.
Learn more: Garden room bases
Workshop bases
Plan a floor around the work you intend to do, including the position of substantial benches or equipment and any later floor coating.
Learn more: Workshop bases
Garage bases
The slab and entrance detail can be specified for the garage, its vehicle use and the connection to the existing drive.
Learn more: Garage bases
Log cabin foundations
Match the concrete to the cabin's foundation plan, including the bearing lines and any supplier requirements for keeping the timber above surrounding ground.
Learn more: Log cabin foundations_1768039694155.CrOLEM4N_1XJ4xe.webp?dpl=dpl_BC3QiZExVcAMF6meDzMb7s6ibQnq)
Greenhouse bases
A continuous concrete floor can suit a greenhouse where that is the chosen growing arrangement. Agree the frame fixings, doorway and water-management details with the supplier.
Learn more: Greenhouse basesBrowse 74 application guides
Garden & residential
Work & modular buildings
Garages & storage
Leisure & wellness
Energy & equipment
Renewable energy
Animal & agricultural
Commercial & community
Leisure accommodation
Concrete base guide prices
The guide sizes below let you compare a likely footprint with your building plans. A written quotation then sets out the preparation and concrete work for your property, so you can make the decision with the complete scope in view.
What affects your quotation
The footprint and shape are only part of the work. We also consider the ground preparation, any existing base to remove, the route for materials and spoil, and the specified concrete construction. Reinforcement, moisture protection, insulation, unusual edges or a particular finish are included where agreed for the project.
Tell us whether the site is clear or still has a building on it. Separating removal, preparation and the new base in the quotation makes it easier to coordinate your building delivery and any other trades.
Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.
Rectangular poured bases: all guide sizes
| Size | Guide price |
|---|---|
| 8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² | From £808 |
| 10' x 6' 3m x 1.8m 60 ft² / 5.57 m² | From £960 |
| 10' x 8' 3m x 2.4m 80 ft² / 7.43 m² | From £1,163 |
| 12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² | From £1,264 |
| 12' x 10' 3.6m x 3m 120 ft² / 11.15 m² | From £1,417 |
| 14' x 10' 4.2m x 3m 140 ft² / 13.01 m² | From £1,518 |
| 16' x 10' 4.8m x 3m 160 ft² / 14.86 m² | From £1,721 |
| 18' x 10' 5.4m x 3m 180 ft² / 16.72 m² | From £1,823 |
| 20' x 10' 6m x 3m 200 ft² / 18.58 m² | From £2,026 |
Corner, hexagonal and octagonal poured bases
Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.
| Size | Guide price |
|---|---|
| 7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² | From £808 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £960 |
| 9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² | From £1,163 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,264 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £818 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,249 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,615 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £1,950 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £818 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,249 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,615 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £1,950 |
No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.
Ask for a Lymington concrete base quote
A description of the building and your postcode are enough to begin. If you already have a model link, a base plan or a few garden photos, you are welcome to add them. We will ask for any further measurements needed to prepare the quotation.
Request your free quote
Tell us a little about the building or floor you need. We can help you work out the next step.
Your enquiry
Concrete bases in Lymington
From the base plan to the finished pour
We plan the work around the finished building, then explain the preparation, pour and curing arrangements before a date is agreed. This gives you a clear point at which to book the building installer.
Agree the footprint and level
The base drawing establishes the required dimensions and bearing area. We check its position against boundaries, door openings and adjoining surfaces, and agree the finished level with you. Any specified services or floor details can then be incorporated in the plan.
Prepare the supporting layers
The agreed area is excavated and prepared for the specified foundation build-up. A stable, compacted supporting layer and properly set formwork help produce the required slab shape and level. Removal of old concrete or surplus material is covered by the agreed scope.
Form and pour the slab
Required membranes, reinforcement and service provisions are arranged before concreting. The concrete is placed and finished to the agreed specification, with the entrances and edges formed for their intended use. The finish can be discussed according to whether the slab will remain exposed or receive another floor.
Protect and hand over the concrete
Fresh concrete needs appropriate protection and time to cure. We explain when the surface may be accessed and when the planned building or loads can be introduced. Keep the building delivery date flexible until that programme has been confirmed.
Plan the route into the garden
A simple view from the entrance to the base position is particularly useful when arranging concrete work. Include a side gate, sharp turn, steps or a change in level if any of those are on the route. We can then discuss how materials will reach the work area and how excavated material will leave it.
Let us know which paving, planting or other garden features you want to retain beside the route. The method of handling materials, any agreed surface protection and the space needed while work is under way belong in the preparation discussion. You can send photos by WhatsApp rather than trying to describe every turn on the phone.
If another contractor is taking down the old building, agree who removes its floor and foundation as well. A cleared footprint and a removed base are different starting points for the new work; knowing which will be available helps us quote and schedule it accurately.
Choosing a building and checking the property
If you want to see garden buildings before selecting one, Purewell Timber's display site is at Unit 4, Lea Green Farm, Christchurch Road, Lymington, SO41 0LA. Check the current display with the supplier before travelling. Once you choose a model, ask for its base drawing as well as its advertised overall size; the drawing is what we use to agree the support and edge detail.
For a proposed building, the New Forest planning property map helps you check the actual address, planning history and relevant boundaries. The Park boundary cuts across the wider local area, so use the property location when deciding where to send a planning enquiry. The Park Authority deals with planning inside its boundary; New Forest District Council is the planning authority for district properties outside it.
Building regulations are a separate matter from planning. The Park's planning and building-control explanation directs building-control questions to the relevant council, including New Forest District Council for its area. You can contact JustBases about the foundation while you establish the building's requirements; share any approved details or conditions that affect the base when they are available.
Lymington and nearby areas
We welcome concrete base enquiries from Lymington town centre, Buckland, Pennington, Lower Pennington and the residential streets around Woodside. Nearby areas include Efford, Everton, Hordle, Tiptoe, Downton, Leagreen, Broadmead, Gordleton and Flexford, along with Milford on Sea, Lymore and Keyhaven.
You can also enquire from Boldre, Pilley, Pilley Bailey, Battramsley, Sandy Down, Portmore, Walhampton, South Baddesley, Norley Wood, East End and East Boldre; from Sway, Shirley Holms, Setley and Brockenhurst; and from New Milton, Ashley, Bashley and Barton on Sea. The full address lets us confirm travel and the arrangements for your particular site.
SO41 covers many of the Lymington-area addresses, with SO42 examples around Setley and Brockenhurst and BH25 addresses around New Milton. Send the full postcode rather than only the district, and mention the entrance to use if it is different from the postal address.
Feedback on Craig’s earlier work
"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
Concrete base questions
What does your concrete base service include?
We prepare and pour the agreed foundation, with the dimensions, construction and finish set out in the quotation. Site clearance, old-base removal and disposal can be discussed as part of that work. The garden building itself and its assembly are separate unless the quotation expressly includes them, so you can coordinate the foundation with your chosen supplier.
Can I get a price before I choose the exact building?
Yes. Tell us the likely use and approximate size, together with the postcode. That is enough to discuss the options and guide costs. Once you have selected the building, its foundation plan lets us confirm the footprint and details for a firm quotation before the work is booked.
Which measurement should I use for the slab?
Use the manufacturer's required foundation dimensions rather than a roof or advertised nominal measurement. Some buildings have a separate bearing footprint, projecting roof or particular edge detail. Send us the base plan when available and we can agree the setting out with the supplier's requirements in view.
Can you provide a base for a working workshop?
Yes, subject to agreeing the construction for its use. Describe what you will keep or operate in it, particularly substantial equipment or concentrated loads. This helps establish whether specific design details, reinforcement or fixing provisions are needed and whether the concrete will be the finished floor or receive another surface.
Will an old concrete base need to be removed?
That depends on its condition, position, level and suitability for the new building. Photos are a useful start, followed by any checks needed before relying on it. If removal is the agreed route, we can identify that work separately in the quotation and plan the replacement level at the same time.
Can you work through a narrow side access?
Send a photo of the narrowest point and show any turns or steps beyond it. The whole route matters when planning material movement. We will discuss a workable method and its effect on the quotation before booking, including any need for access permission or temporary clearance that you must arrange.
What finish can the concrete have?
The right finish depends on the floor's next use. A surface beneath a separate floor has different requirements from exposed concrete in a working building. Let us know about any planned coating or floor covering so the slab finish and curing arrangements can be agreed with that subsequent work.
Can moisture protection and insulation be included?
They can be included where required by the agreed floor design. Their position affects the complete build-up and finished threshold, so discuss them before the base level is fixed. The building supplier or designer should confirm the floor arrangement, and the quotation will state the foundation details we are supplying.
How do you choose the height beside an existing path?
We consider the building entrance, surrounding levels and the proposed treatment of surface water together. Show us the path or patio that you want to connect to the building and any planned future landscaping. That allows the slab and adjoining work to be coordinated while there is still room to adjust the layout.
When can the building be installed after the pour?
The concrete needs time to develop strength, and the suitable interval depends on the specified concrete, conditions and loads to follow. We will explain the agreed curing and loading programme for your base. Confirm that timing with the building installer before committing to a delivery or assembly date.
Who should I ask about permission for my Lymington building?
Check the actual property on the New Forest planning map to establish the planning authority. The Park Authority handles properties within its boundary and NFDC handles planning in the district outside it; building control is a separate council service. You are welcome to ask us about the base while you seek the relevant advice for the building.
Could I choose ground screws instead of concrete?
A compatible framed building may be suited to ground screws with an agreed supporting frame. Concrete is useful when continuous slab support or a solid floor is wanted. Send the building information and tell us how you intend to use it; we can discuss both routes and direct you to the local installation page for the screw options.
Talk to JustBases about your base
Call 01202 039753, use WhatsApp or send the enquiry above. Tell us the intended building and postcode, and we can help you move from a rough idea to an agreed foundation scope.
The Lymington overview explains the other base choices. You can also ask about local ground screw installation or standalone screw testing. For more detail, see our concrete base guide and Hampshire service areas.
