A poured concrete base before the building is fitted

Concrete base installation in Marlborough

JustBases prepares and pours concrete bases in Marlborough for sheds, workshops, garages and other suitable garden buildings. We agree the footprint, construction and finish for what the base will support, then explain when it can be used for the next stage.

Concrete bases for your project

A poured base supports the building over a continuous area. Where specified for it, the concrete can also be the floor you work or store things on. Its construction needs to reflect that use as well as the building above.

Individual paving slabs on a concrete or mortar bed are a different option, and isolated concrete pads provide point supports rather than a continuous floor. If your building has a suspended floor, we can also discuss the other Marlborough base methods before you commit to a slab.

Shed bases

Shed bases

The shed’s own floor and bearer arrangement determine what it needs beneath it. We can discuss a continuous base that supports the required footprint and gives the doors a practical height above the surrounding surface.

Learn more: Shed bases
Workshop floors

Workshop floors

Tell us whether the concrete will remain the working floor and what you will put on it. Benches, storage and machinery can create different demands, so identify substantial equipment while the construction is being agreed.

Learn more: Workshop floors
Garage bases

Garage bases

The garage supplier’s wall and door details need to work with the proposed floor and approach. Include the vehicle use and any fixing requirements when discussing the base specification.

Learn more: Garage bases
Garden room bases

Garden room bases

Some rooms use a slab beneath their floor layers; others arrive with a floor that needs defined supports. If concrete is specified, we agree its dimensions and top level with the room’s floor and entrance construction.

Learn more: Garden room bases
Greenhouse bases

Greenhouse bases

A solid floor can provide useful standing and working space. If you want growing beds open to the soil, we can instead discuss the required perimeter support and appropriate paved areas with the greenhouse details.

Learn more: Greenhouse bases
Browse 74 application guides

Concrete base prices in Marlborough

The poured-concrete guides below cover standard sizes and the listed shape options. They are a starting point for budgeting; a base for vehicle use, substantial workshop equipment or another special requirement is quoted to the construction it needs.

Use your written quotation to check the complete scope, including the finish and what happens at the edges of the base. Paving, individual supports and surrounding paths are separate work unless expressly included.

What affects your quotation

The amount of preparation, the route for concrete delivery and the agreed size and levels all affect the work. Tell us if an old building or slab needs removing, and whether soil or broken concrete must be taken away.

The price also follows the specified slab construction and finish, including any required membrane, reinforcement or extra work at the base edges. We list the agreed excavation, removal and making-good arrangements so you can see what the quote covers.

Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.

Rectangular poured bases: all guide sizes
SizeGuide price
8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² From £836
10' x 6' 3m x 1.8m 60 ft² / 5.57 m² From £994
10' x 8' 3m x 2.4m 80 ft² / 7.43 m² From £1,204
12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² From £1,310
12' x 10' 3.6m x 3m 120 ft² / 11.15 m² From £1,467
14' x 10' 4.2m x 3m 140 ft² / 13.01 m² From £1,572
16' x 10' 4.8m x 3m 160 ft² / 14.86 m² From £1,783
18' x 10' 5.4m x 3m 180 ft² / 16.72 m² From £1,888
20' x 10' 6m x 3m 200 ft² / 18.58 m² From £2,098
Corner, hexagonal and octagonal poured bases

Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.

Corner
SizeGuide price
7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² From £836
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £994
9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² From £1,204
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,310
Hexagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £847
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,294
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,672
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £2,019
Octagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £847
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,294
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,672
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £2,019

No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.

Get a concrete base quote

What are you building, and where will it go? Give us the postcode and a rough size if known. A building link or a photograph can be useful, but you can start without them.

Send the form, call 01202 039753 or use WhatsApp to discuss the base. We can ask about the details that matter for your particular project.

Request your free quote

Just give us your contact details and a short description of what you want to build. We will guide you through the rest.

Your enquiry

Concrete bases in Marlborough

Please provide either an email address or a phone number.

Add site photos, video or a drawing (optional)

Upload up to 5 photos or a short video of your site to help us provide an accurate quote.

0/5 files. JPG, PNG, WebP, PDF, MP4, MOV accepted — up to 100MB each.

Free, no-obligation quote. Your details are used to respond to this enquiry; see our privacy policy.

How we install a concrete base

The agreed construction gives each stage a clear purpose: support the intended use, produce the right size and level, and hand over concrete ready for its next load at the appropriate time.

Agree the footprint and finished height

We establish the base dimensions from the selected building’s requirements. The proposed top level is considered with the floor construction, entrance and any adjoining work that needs to meet it.

Prepare the ground and supporting layers

The quoted preparation creates the area and support for the slab. This can include removing existing material, preparing the ground and sub-base, and setting the edges and any specified membrane or reinforcement.

Pour and finish the concrete

Concrete is placed and finished to the agreed specification and use. We plan how it reaches the footprint and what working space the placing and finishing stages need.

Agree readiness for the building

The concrete needs an appropriate curing period. We explain the agreed protection and handover, including when assembly or other loading can proceed; fixings and floor coverings may have their own readiness requirements.

Access, old bases and floor levels

The delivery point and the base can be some distance apart. Show us the practical route, including gates, changes of level and anything that must stay in use. This helps us decide the material-handling arrangements and price the work without assuming a vehicle can reach the footprint.

If an existing base might be retained, its visible surface is only part of the assessment. Its dimensions, construction, condition and level need to suit the proposed building. Where removal is needed, we agree how much is to come out, what will leave the site and any work to surrounding surfaces.

The concrete’s top is a construction level, not always the final room-floor level. Floor layers, the supplier’s sill or threshold and the route into the building should be considered together. Tell us about any existing drainage or water collecting at the proposed position so the relevant detail can be addressed before pouring.

Planning a concrete base in Marlborough

For property and building questions in Marlborough, Manton and the listed Wiltshire villages, use Wiltshire Council’s planning and building-control guidance. Marlborough Town Council identifies Wiltshire as the planning authority. Checking the finished building’s position and use is useful before committing to its base.

Building-regulations approval is separate from planning permission. Those checks can run alongside a base enquiry; you do not need to arrive with an approval pack to start a conversation.

If the building would suit a supported floor instead, see ground screw installation in Marlborough. We also offer standalone screw testing. The Marlborough overview explains all base methods, and our Wiltshire service area shows the wider coverage.

Areas we cover around Marlborough

We welcome enquiries from Marlborough, Manton and the surrounding places below. Send the site postcode so we can confirm arrangements and include the requested work and travel in your quotation.

Useful postcode examples include SN8 around Marlborough and many adjoining villages, SN4 around Broad Hinton and Winterbourne Bassett, and SN9 around Pewsey and Milton Lilbourne. Coverage is confirmed for the address, rather than every property within those districts. Wootton Rivers also has SN8 addresses.

Marlborough and Manton

Marlborough town centre and High Street, The Green, College Fields, St Margarets Mead, St Martins, Poulton Hill, Elcot Lane, Bath Road, London Road, Salisbury Road, Preshute Lane, West Manton and Manton.

Adjoining parish areas

Preshute, Manton House, Clatford, Mildenhall (Minal), Poulton and Stitchcombe; Savernake, Forest Hill, Cadley and Clench Common.

Ogbourne villages

Ogbourne St Andrew, Ogbourne Maizey, Rockley and Ogbourne St George.

Kennet villages and Avebury

Fyfield, Lockeridge, West Overton, East Kennett, Avebury, Avebury Trusloe, Beckhampton and West Kennett.

Broad Hinton and neighbouring villages

Broad Hinton, Winterbourne Bassett, Uffcott, Berwick Bassett and Winterbourne Monkton.

Ramsbury and Bedwyn villages

Axford, Ramsbury, Aldbourne, Baydon, Froxfield, Little Bedwyn, Chisbury, Great Bedwyn, Crofton and St Katharine’s.

Pewsey-side villages

Oare, Huish, Wilcot, Pewsey, Wootton Rivers, Milton Lilbourne, Easton Royal, Burbage, Durley, Stibb Green and Ram Alley.

Grafton villages

East Grafton, West Grafton, Wilton near Grafton, Marten and Wexcombe.

Feedback on Craig’s earlier work

"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
— Alan, ChristchurchMyBuilder · BH23 · Concrete base
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
— Paul Leister, BroadstoneMyBuilder · BH18 · 6m x 4m Concrete shed base

Concrete base questions

The details below help you prepare for a quotation and coordinate the base with your building.

When does a building benefit from a continuous poured base?

A continuous base is useful where the building needs support across its footprint or the slab will also form a working or storage floor. The proposed loads and the supplier’s construction requirements matter. We can discuss that role alongside the alternatives before you decide.

Can you quote a shaped base rather than a rectangle?

Yes. The price guides include the stated shaped options, and we can discuss the actual footprint for your building. The exact base outline, dimensions and edge work need to be agreed before construction. An approximate size or building link is enough for the first enquiry if the final base plan is not yet available.

Is the building’s advertised size enough to set out the slab?

It is useful for the initial discussion, but the slab should follow the required foundation dimensions. An advertised size might describe the walls, roof or overall building rather than the base. Before installation, we agree the actual footprint and any perimeter or fixing details with the information for the chosen model.

What matters when the concrete will be my workshop floor?

Explain the work you will do and what will stand on the floor, including heavy or fixed equipment. That lets the required construction, finish and any localised loads be considered together. It is also helpful to know whether a covering will be fitted later, because the surface and readiness requirements may differ.

Does a garage base include an apron or approach?

The written quotation identifies where the base ends and whether any approach work is included. Tell us how vehicles will enter and share the garage supplier’s doorway requirements when available. We can then discuss the base height and adjoining surface as part of the proposal, with any separate work clearly identified.

How are reinforcement and membranes decided?

They follow the agreed construction and intended use of the base. Relevant requirements may come from the building supplier or responsible designer. We confirm the specified work in the quotation so you know what is provided.

Can the old base stay underneath the new project?

It may be possible to retain existing work after assessment. Its construction and condition need to provide suitable support, and its size and height must suit the new building. Send what you know about it and any useful photos. We will discuss what can be established and whether retention, removal or replacement needs further consideration.

How are excavation and old concrete removal priced?

We agree the required removal with the rest of the preparation and identify it in the written quote. Access, the quantity and type of material, and disposal arrangements affect the work. Please mention an existing slab or building early so that breaking out, taking away material and any making good can be considered explicitly.

What if concrete cannot be unloaded beside the footprint?

We consider how to get it from the practical delivery point to the work area. A description or photo of the route helps identify distance, gates, steps and working space. The agreed delivery and handling method forms part of the quotation; you do not need to choose that method yourself before calling.

How is the finished base height agreed?

We relate the top of the concrete to the building’s required floor construction and entrance. Relevant adjoining paths, ground levels and drainage details also need to be considered. A room with floor layers above the slab may need a different concrete level from a building where the slab is the final floor.

When can the building be assembled or fixed down?

We agree readiness for the actual concrete, conditions and intended loading, taking relevant supplier advice into account. Light foot traffic, building assembly, fixing down and adding a floor covering can require different stages of readiness. Please coordinate the building delivery with that handover rather than rely on the concrete looking dry.

Can I start a quote before the building plan is ready?

Yes. Give us the project postcode, what the building is for and any rough dimensions you have. We can discuss the base and the likely next information needed. The final dimensions, construction and any necessary property checks are agreed before work, not made a condition of the first conversation.

What happens next

Tell us about your concrete base. We will discuss the intended use and practical arrangements, confirm the proposed work in writing and agree how the installation fits the building programme.

Call 01202 039753 or use WhatsApp if it is easier to explain the project in a conversation.