
Concrete base installation in New Milton
JustBases installs poured concrete bases in New Milton and nearby communities. Get a continuous slab for your building, with preparation, finished height and access agreed as part of the work.
A continuous floor for your chosen building
A poured slab gives you a solid, continuous base beneath the building. It can form the working floor or support the manufacturer's floor construction. We establish which role it needs to fulfil before deciding the build-up and finish.
The way you will use the space matters as much as its outline. Storage, a vehicle, workshop equipment and an occupied garden room place different demands on the floor. Tell us about your plans and we can discuss the relevant specification with you and your building supplier.

Shed bases
A firm footprint helps the shed go together squarely and supports its floor. The base dimensions should follow the selected shed's requirements, including the position of the walls and doorway.
Learn more: Shed bases
Workshop bases
A concrete floor can provide a useful working surface for benches and tools. Explain where substantial equipment will stand so its loading and any fixing requirements can be considered.
Learn more: Workshop bases
Garage bases
Plan the garage floor together with the door opening and approach. We discuss vehicle use, the supplier's fixing details and the transition from the drive to the new floor.
Learn more: Garage bases
Log cabin foundations
A cabin needs a base that matches its particular wall and bearer arrangement. Obtain the base plan for the model you choose so edges and support can be coordinated before the pour.
Learn more: Log cabin foundations
Summerhouse bases
A shaped summerhouse can have different base dimensions from its advertised overall size. We can work from the manufacturer's footprint and agree how the entrance meets the garden.
Learn more: Summerhouse bases
Garden room bases
For a room used throughout the year, the slab must work with the proposed floor, insulation and service entries. Bring your supplier into the discussion when those details are available.
Learn more: Garden room basesBrowse 74 application guides
Garden & residential
Work & modular buildings
Garages & storage
Leisure & wellness
Energy & equipment
Renewable energy
Animal & agricultural
Commercial & community
Leisure accommodation
Concrete base guide prices
Use the poured-concrete guides to budget for the size and shape you are considering. A standard rectangular base is a useful starting point; garages, equipment loads and particular building specifications are quoted for their agreed requirements.
The written quotation identifies the base work and preparation included. It also makes clear any agreed removal, material delivery arrangements and additional work around the slab.
What affects your quotation
The footprint, concrete specification, depth of excavation and required sub-base influence the work. A membrane, reinforcement, shaped edges or a particular finish may also form part of the agreed construction.
Practical arrangements matter too: carrying materials through a garden, clearing an old base, taking excavated material away and reaching the pour area can change the labour and delivery needed. We discuss these details before confirming your price.
Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.
Rectangular poured bases: all guide sizes
| Size | Guide price |
|---|---|
| 8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² | From £805 |
| 10' x 6' 3m x 1.8m 60 ft² / 5.57 m² | From £957 |
| 10' x 8' 3m x 2.4m 80 ft² / 7.43 m² | From £1,159 |
| 12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² | From £1,260 |
| 12' x 10' 3.6m x 3m 120 ft² / 11.15 m² | From £1,412 |
| 14' x 10' 4.2m x 3m 140 ft² / 13.01 m² | From £1,513 |
| 16' x 10' 4.8m x 3m 160 ft² / 14.86 m² | From £1,716 |
| 18' x 10' 5.4m x 3m 180 ft² / 16.72 m² | From £1,817 |
| 20' x 10' 6m x 3m 200 ft² / 18.58 m² | From £2,019 |
Corner, hexagonal and octagonal poured bases
Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.
| Size | Guide price |
|---|---|
| 7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² | From £805 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £957 |
| 9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² | From £1,159 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,260 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £815 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,245 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,609 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £1,943 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £815 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,245 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,609 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £1,943 |
No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.
Ask Craig about your New Milton base
A postcode and a short description of the building are enough to open the conversation. If you have already chosen a model, its dimensions are useful; a plan or photos can follow when you have them. We will help establish the work needed for a written quotation.
Request your free quote
Start with your postcode and the building you have in mind. An approximate size is useful if you know it.
Your enquiry
Concrete bases in New Milton
From the base plan to the finished slab
Clear decisions before the pour help the foundation and building fit together. The following stages are agreed for your project, including who is responsible for any work outside the base installation.
Set the dimensions and height
We confirm the required footprint, orientation and finished level with reference to the building. Door clearances, neighbouring paths and any proposed floor layers are considered at this stage.
Prepare the formation
The agreed excavation and sub-base preparation create the support for the slab. Edges are set out, and any specified membrane, reinforcement and service provisions are arranged before concrete is placed.
Pour and finish
Concrete is brought to the prepared area using the agreed access arrangement, then placed and finished for the intended use. The finish and levels are part of the specification discussed with you.
Protect and hand over
Fresh concrete needs suitable protection and time to develop strength. We explain the care required, when you can use the surface and when the building and heavier contents can be placed on it.
Make the floor work with the garden
Decide how you want to enter the building while its position is being planned. A threshold that meets a path comfortably, space to open doors and clearance around the walls all affect the finished arrangement. Show us adjoining paving and any changes in level so the base height can be considered alongside them.
If electricity, water or another service will enter through the slab, involve the relevant installer before the pour. Agreed entry positions and suitable provisions can then be coordinated with the foundation. Supply connections and specialist service work should be identified separately in the project responsibilities.
We also discuss what happens to anything already occupying the footprint. An old slab, paving or unwanted material may need removal, and the quotation should identify the agreed clearance and disposal. Photos showing both the base area and the route from the entrance are helpful when assessing the practical work.
If your building has a suitable structural floor, there may be other foundation choices worth considering. The New Milton base overview explains poured concrete, paving on concrete or mortar, timber frames on concreted-in posts and ground screws. Ground screw installation in New Milton covers a raised foundation with an appropriate frame arrangement.
A nearby building display and useful base information
For a nearby place to view garden buildings, Coastal Garden Buildings' showsite is at Stewarts Christchurch Garden Centre, Lyndhurst Road, Christchurch, BH23 4SA. Once you have a model in mind, ask for its base drawing and floor requirements. These help us match the concrete work to the building you actually intend to order.
Ask the supplier to identify the drawing for your chosen model and any floor option you select. It is useful to know which parts must bear on the base, where the doorway sits and how the building is fixed. Sharing those instructions lets us discuss the concrete installation with the same information the building fitter will use.
New Milton and nearby communities
We welcome enquiries from New Milton town centre, Old Milton, Barton-on-Sea, Ashley, Bashley and Wootton, including Ballard, Becton, Fernhill, Ashley Arnewood and Ossemsley. Nearby addresses in Highcliffe, Walkford, Hinton Admiral and residential streets around Chewton Bunny are welcome too.
Surrounding communities include Hordle, Everton, Downton, Tiptoe and Sway, with enquiries also welcome from Holmsley, Burley, Brockenhurst and Milford on Sea. We also discuss projects towards Christchurch and Lymington. Give us the full site address so the practical work and travel can be included in your quotation.
BH25 is a useful starting point for New Milton enquiries, with BH23 and SO41 among the neighbouring districts. Some nearby Forest addresses use BH24 or SO42. These district examples help locate a project; availability, access and the agreed service are checked for the particular address.
Feedback on Craig’s earlier work
"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
New Milton concrete base questions
When is a poured concrete base a useful choice?
A garage or working building can benefit from having concrete as the floor you use every day. Other buildings need a continuous slab beneath a separate floor system. Ask your supplier what foundation its model requires, then discuss with us how you want the space to function so the concrete construction can be agreed.
Will the slab be the finished floor inside my building?
That depends on the building. Some structures use the concrete as their floor; others include timber bearers, insulation or a complete floor above it. Let us know which arrangement your supplier requires so the finished slab level and any additional layers can be coordinated.
Should I use the building's advertised size for the base?
Ask for the manufacturer's exact base dimensions. Advertised measurements may include roof overhangs or describe an overall size, while the foundation needs to suit the supported footprint. We can discuss a provisional budget first, then confirm the footprint from the selected model before setting out.
What should I mention about workshop equipment?
Tell us about substantial machinery, concentrated loads and any planned floor fixings. Its weight and position are useful when specifying the slab. If the equipment supplier or designer provides loading or anchoring information, we can consider it with the building details when the construction is agreed.
Can you remove the base that is already there?
Ask us to include removal when you enquire. We need to understand what is present, its approximate extent and how material can leave the site. The quotation can then identify the agreed breaking-out, clearance and disposal alongside the new base work.
Is a narrow side passage a problem for a concrete base?
It is something to assess early. Tell us about the narrowest opening, steps, corners and the distance to the base area. A short video can be useful. We can discuss a workable material delivery arrangement and include its cost before you commit to the job.
How do we decide the height of the base?
Start with the intended floor and doorway, then consider adjoining paths, garden levels and any layers above the concrete. We agree the finished level as part of the base plan. If a retaining edge or drainage work is required, its design and responsibility also need to be clear.
Can service pipes or cables pass through the slab?
Planned service entries can be coordinated before the concrete is placed. Discuss their location with your building supplier and the relevant service installer, then share the agreed information with us. The quotation should distinguish foundation provisions from electrical, plumbing or other specialist installation work.
Can you quote for a corner or octagonal building?
Yes, send the shape and model details you have. The shaped-base guides help with initial budgeting, while the manufacturer's actual base drawing allows us to confirm the outline and formwork. Access, preparation and specification are considered with the shape when we prepare the quotation.
How long before I can use the new concrete?
We will explain the curing and loading timetable for the agreed concrete and conditions. Light access, fitting the building and bringing in heavy contents may be appropriate at different stages. Arrange the building delivery around that advice and follow the protection instructions given at handover.
Should I book the base before ordering the building?
You can contact us while comparing buildings. Once you settle on a model, obtain its base requirements and coordinate delivery with the foundation programme. This gives time to confirm the footprint, prepare the site and allow the concrete to become ready for the building installation.
Where should I check permission for the proposed building?
Use the actual address when seeking planning advice. The National Park property checker helps establish whether the Park Authority handles planning; New Forest District Council handles its district outside the Park, while Highcliffe and Walkford are in BCP's area. Building control is a separate council responsibility, as the Park's FAQ explains. You can enquire about the foundation while these checks are underway, with the permissions needed for the work resolved before it starts.
Arrange your concrete base
Call 01202 039753 or use the enquiry form to tell Craig about your building. For other support options, see the New Milton overview and local ground screw service; standalone testing has its own page.
