Ground screws before installation

Ground screw installation in Pewsey

JustBases installs ground screw foundations in Pewsey for compatible garden buildings and supporting frames. We can provide installed screws ready for a frame by others, or quote for screws with the stated timber-frame package. Ask us about your building and site to establish the support arrangement and price.

Ground screws for your building

Screws provide individual foundation supports for the frame or building above. Loads pass from the building and frame, through the connections and screws, into the ground. The foundation therefore needs to be planned with the floor it will carry.

On a suitable site, screw foundations can reduce the excavation and spoil associated with preparing the entire footprint for a slab. There is no poured-concrete curing period for the screw foundation itself, which can help coordinate the next stage. Installation can be planned throughout the year where ground conditions, safe access and working conditions allow.

Garden rooms

Garden rooms

Match the supports to the room's floor structure and connection requirements. Establish who supplies the frame and how the building fitter will use it, including the intended entrance and finished floor level.

Learn more: Garden rooms
Summerhouses

Summerhouses

A compatible timber floor can be supported without a continuous concrete slab. The summerhouse supplier's bearer arrangement and any veranda support should be included when planning the foundation.

Learn more: Summerhouses
Sheds

Sheds

Screw support can suit a shed floor carried on an appropriate frame. Agree what sits between the screw heads and the shed floor so that the quotation covers the foundation actually required.

Learn more: Sheds
Workshops

Workshops

The frame and foundation must account for the way the workshop will be used, including substantial equipment or storage. Describe those loads alongside the building itself before the support layout is settled.

Learn more: Workshops
Log cabins

Log cabins

Use the cabin supplier's requirements for its floor, wall bearing and fixing details. The screw and frame proposal must support those requirements; the cabin's overall dimensions are only the starting point.

Learn more: Log cabins
Browse 74 application guides

Ground screw prices in Pewsey

The guide separates installed screws with a frame by others from the stated screws-and-timber-frame package. Compare the foundation and frame responsibilities as well as the footprint, then ask us for the written price for your building.

Screw selection, support positions, ground assessment and access affect the proposed work. A steel frame or another non-standard arrangement is specified and quoted individually. Physical testing and the two torque services are not automatically included. Installation torque monitoring: price on application. Specialist torsional testing: price on application.

Installed screws, frame by others

This option provides the agreed installed foundation supports for another contractor's frame. Head connections, positions and levels need to suit that frame, with the handover responsibilities confirmed before installation.

Screws with a timber frame

This option adds the stated timber frame to the installed screws. Confirm its dimensions and construction, along with the building floor and assembly work that remain with the building supplier or another contractor.

Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.

Building sizeInstalled ground screwsFrame by othersInstalled screws + timber frame
8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² From £1,227From £1,716
10' x 8' 3m x 2.4m 80 ft² / 7.43 m² From £1,331From £1,820
12' x 10' 3.6m x 3m 120 ft² / 11.15 m² From £1,456From £1,924
16' x 10' 4.8m x 3m 160 ft² / 14.86 m² From £1,560From £2,132
20' x 10' 6m x 3m 200 ft² / 18.58 m² From £1,664From £2,548

No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.

Get a ground screw quote

Start with the building you have in mind and your postcode. A rough footprint, product link or photos can help, but you do not need a screw design to open the conversation.

Use the form, message Craig on WhatsApp or call 01202 039753. We will work through the support and frame details needed for the quotation with you.

Request your free quote

Just give us your contact details and a short description of what you want to build. We will guide you through the rest.

Your enquiry

Ground screw installation in Pewsey

Please provide either an email address or a phone number.

Add site photos, video or a drawing (optional)

Upload up to 5 photos or a short video of your site to help us provide an accurate quote.

0/5 files. JPG, PNG, WebP, PDF, MP4, MOV accepted — up to 100MB each.

Free, no-obligation quote. Your details are used to respond to this enquiry; see our privacy policy.

How ground screws are installed

The aim is an installed foundation that the agreed frame can connect to and use. We resolve the building requirements and site arrangements before installation, then complete the agreed checks and handover.

Plan the supports with the building

Plan the supports with the building

Review the building, its floor or frame and the loads to be supported. Agree the support positions, screw specification and connections using the relevant design requirements and site assessment, with the intended floor height established.

Set out, install and check

Set out, install and check

Mark out the agreed positions and prepare the working area, including the necessary service checks. Install the specified screws and check their positions and levels against the agreed layout. If site findings require a change, resolve that change before proceeding with the affected support.

Complete the agreed frame work

Complete the agreed frame work

Fit the quoted frame or hand over the screws for the frame contractor as agreed. Confirm the connection arrangements and installation information needed for the next stage, so the building fitter knows what is ready and what work remains.

Preparing access and the foundation position

We need a practical route to the proposed footprint and room to carry out the installation safely. Show us the entrance, route and working area, and mention existing structures or surfaces you want to retain. We can then agree what preparation is required and who will carry it out.

Tell us about any known buried services, previous foundations or other information relevant to the support positions. The installation specification takes account of the building requirements and the site assessment. You do not need to dig trial holes or disturb existing supports simply to ask for a price.

Ground screw testing in Pewsey

Our separate Pewsey testing service can provide loading evidence where the project calls for it. Pull-out testing acts upwards, compression testing acts downwards and lateral testing acts sideways. Agree the required evidence and criteria with the responsible project designer before commissioning the test.

Installation torque monitoring records turning resistance while a screw is inserted. Specialist torsional testing applies a separate twisting action. These are different services, priced separately: price on application for each service, and neither should be assumed within a standard installation quotation.

Planning your Pewsey installation

The building and its use still need the appropriate property checks. Wiltshire Council's planning and building-control information gives the relevant routes; Pewsey Parish Council is a consultee, not the final planning decision-maker. Building regulations and planning permission are separate matters.

You can ask us about installation before those details are complete. We will discuss the foundation scope while the required building information and approvals are resolved. For alternative methods, see all our Pewsey base services; for other locations, see our Wiltshire service area.

Areas we cover around Pewsey

Send the postcode for your Pewsey or surrounding-village project and we will confirm arrangements for the work you need. The following places help identify the enquiry area, including the smaller settlements between the larger villages.

Useful postcode examples include SN9 around Pewsey and Woodborough, SN8 around Huish, West Stowell and Burbage, and SN10 around Marden. Coverage and visit arrangements are confirmed for the actual address; these examples do not include every property in those districts.

Pewsey and its smaller settlements

Central Pewsey, High Street, North Street and River Street; Pewsey Wharf, Southcott, Kepnal and Sharcott; and the Buckleaze, Knowle and King's Corner areas.

Wilcot and Milton Lilbourne side

Wilcot, Huish, Oare, West Stowell, Clench Common, Wootton Rivers, Clench, Fyfield near Milton Lilbourne, Milkhouse Water, Milton Lilbourne and Easton Royal.

Alton and Woodborough villages

Alton Barnes, Alton Priors, Honeystreet, Stanton St Bernard, Woodborough and Beechingstoke.

Cannings and Marden villages

Patney, Marden, Chirton, Conock, All Cannings and Allington near All Cannings.

Manningford and Upavon villages

Manningford Abbots, Manningford Bruce, Manningford Bohune, North Newnton, Bottlesford, Hilcott, Charlton St Peter, Wilsford, Rushall and Upavon.

Burbage and Grafton villages

Burbage, Durley, Stibb Green, Ram Alley, East Grafton, West Grafton, Wilton near Grafton, Marten and Wexcombe.

Bedwyn villages

Great Bedwyn, Crofton, St Katharine's, Little Bedwyn, Chisbury and Froxfield.

Further surrounding villages

Ham, Shalbourne, Buttermere, Tidcombe and Fosbury. Please include the postcode so we can discuss the particular site.

Feedback on Craig’s earlier work

Feedback on Craig’s earlier groundwork and customer service.

"Craig and the team are absolutely fantastic. From courtesy, to standard of work, to tidiness — everything exceeded expectations. The job was arranged, booked and done extremely quickly and we are very happy with the results. Nothing was too much trouble, and communication was easy."
— Verified CustomerMyBuilder · SO · Cobble edge and gravel strip
"Craig and his crew were excellent from the first communication, quote, timing of work and quality of work. Highly recommended."
— Verified CustomerCheckatrade · BH20 · Garage base

Ground screw installation questions

These answers clarify the installed supports, frame arrangements and practical steps involved in planning the foundation.

What is supported by the screws rather than by a slab?

The screws carry the agreed frame or building support points through their head connections. A compatible floor structure spans between those supports. The screws themselves do not create a continuous floor surface, so the frame and building floor must be included in the overall arrangement. We establish which contractor provides each part before confirming the foundation scope.

Why can screws reduce ground disturbance?

Where suitable, individual supports can replace the full-footprint excavation and material build-up needed for a slab. That can reduce the volume of spoil to handle and the amount of new material brought through the garden. The actual preparation still depends on the installation positions and site; it is not a promise of no excavation or no effect on roots.

Can the work be planned outside summer?

Yes. Screw installation does not rely on a concrete pour curing before the frame can use the supports, which gives useful flexibility in planning. We still need safe working conditions and suitable access and ground conditions at the time.

Can another contractor fit the supporting frame?

Yes. We can quote for installed screws ready for a frame by others. That contractor's connection requirements, support positions and levels must be coordinated with the screw installation. Agree the handover and who checks the frame interface before work, so both contractors understand the foundation they are providing or receiving.

How is the timber-frame package different?

The quoted timber-frame option includes the stated frame along with the installed screws. Its construction and dimensions are agreed for the intended building. Ask what the building supplier provides above it, because the supporting frame, the building's finished floor and the assembly work are separate parts of the overall project and should be identified clearly.

What if the building needs a steel frame?

Bring that requirement into the initial discussion, even if its details are still being developed. A steel frame needs its own specification, compatible connections and an individual quotation. It should not be priced by treating it as the timber-frame package. The screw foundation and frame must be designed to work together.

Who decides the screw specification and layout?

Selection brings together the required building loads, the floor or frame's bearing points, the connections and an assessment of the site. The relevant design requirements establish what the foundation must achieve, and the installation proposal provides supports to suit. The chosen screw and head arrangement are confirmed as part of that process before installation.

How is the floor height set on changing ground levels?

We begin with the required building floor level and consider the frame and supports underneath it. Different exposed support heights can affect the structural arrangement, connections and access around the building. Those details need to be resolved together. We also identify any additional perimeter or approach work instead of assuming it forms part of the screw package.

What preparation is needed at the proposed footprint?

We agree the clearance, working area and access needed for the installation, including any existing materials that must be removed or kept. Known services and retained foundations should be discussed before setting out. Wait for the agreed preparation instructions before carrying out ground work yourself; a first enquiry needs only the project and postcode.

How is an obstruction dealt with during fitting?

If an installation position encounters an obstruction, the affected work is assessed and an appropriate response agreed. A change in position or foundation detail needs to remain compatible with the frame and its design requirements. That may require input from the responsible designer or frame supplier before installation continues at that point.

When is the foundation ready for the building fitter?

Once the agreed installation checks and any supplied frame work are complete, we confirm the handover for the next stage. Screw foundations do not have a concrete-curing wait, but the fitter still needs the correct connections, completed support arrangement and agreed access.

Can physical testing be arranged with installation?

Yes, where a test is required it can be discussed alongside the installation programme. Define the purpose, loading direction and required criteria so the test can be scoped and quoted separately. It is not automatically included with installed screws. The Pewsey testing page explains the available services and normal results and report.

What is installation torque monitoring?

It records the turning resistance encountered as a screw is driven into the ground. Monitoring is a separately requested service: price on application. It is distinct from a physical upward, downward or sideways load test, and from specialist applied torsional testing, which is separately price on application. Any interpretation must be appropriate to the actual product and project; there is no universal capacity conversion.

How do lifespan and the guarantee differ?

A correctly specified hot-dip galvanised screw product can have an expected lifespan of 50 years or more, depending on ground conditions and correct installation. JustBases' full 10-year installation guarantee covers its workmanship and the screws and foundation materials it supplies, subject to the written quotation. That is separate from the building supplier's warranty and does not guarantee a standalone test result.

What happens next

Tell us about your project and we will discuss its foundation, confirm what needs to be supplied and prepare a written quotation. The technical details are agreed before installation, not required before your first call.

Call or use the WhatsApp option if you prefer a conversation. Where loading evidence is needed, ask about the local testing service as a separate, defined part of the project.