
Concrete base installation in Salisbury
JustBases installs poured concrete bases in Salisbury and the surrounding villages, preparing the ground and finishing the slab to the agreed building requirements. Whether you need a shed foundation or a working floor, we help you settle the dimensions, access and handover before the building arrives.
Concrete floors and foundations for garden buildings
A concrete slab gives a building a firm, continuous supporting surface. It can also provide a practical floor where you want to roll equipment in, stand benches or keep storage clear of the ground. The preparation beneath it and the finished detail are chosen together with the building and its intended use.
We agree which parts of the project are included: ground preparation, the slab itself and any specified damp protection, reinforcement or other details. If the building has a timber floor, its maker's bearing requirements still matter; if the slab will be the floor, the surface finish and door threshold need attention too.

Sheds
A properly sized base supports the shed's floor bearers and helps the assembled walls and doors sit square. Confirm the maker's base dimensions so an unnecessary exposed concrete ledge does not collect water beside the timber.
Learn more: Sheds
Workshops
For a workshop, tell us about machinery, benches and wheeled equipment as well as the building. Their loads and fixing requirements help determine the slab detail and whether a particular finish or threshold arrangement is needed.
Learn more: Workshops
Garden rooms
Coordinate the slab with the garden-room supplier's wall supports, floor build-up and insulation detail. Agreeing the finished level early helps the doorway connect sensibly with the path or terrace outside.
Learn more: Garden rooms
Summerhouses
A level supporting base gives the summerhouse installer a useful starting point for the floor and wall assembly. The base shape should follow the selected model, including any angled corners, veranda or separate step detail.
Learn more: Summerhouses_1768039694155.CrOLEM4N_1XJ4xe.webp?dpl=dpl_BC3QiZExVcAMF6meDzMb7s6ibQnq)
Greenhouses
Choose the internal growing arrangement before deciding on full concrete coverage. A greenhouse may need a firm perimeter and fixing surface while keeping growing beds open; we can discuss the required concrete work against the frame supplier's plan.
Learn more: GreenhousesBrowse 74 application guides
Garden & residential
Work & modular buildings
Garages & storage
Leisure & wellness
Energy & equipment
Renewable energy
Animal & agricultural
Commercial & community
Leisure accommodation
Concrete base prices in Salisbury
Use the guide below to put an initial budget against the size you have in mind. Your written quotation then identifies the agreed preparation and slab work, so you can plan the building purchase and the base installation together.
What affects your quotation
The main factors are the base dimensions and specification, the amount of excavation and supporting material, and how concrete and other materials can reach the work. Removing an old base, taking spoil away, reinforcement, damp protection and a particular finish also affect the scope when required.
Describe the route from the vehicle position to the base, including gates, steps and anything that must be protected. We use those details to quote the work and agree whether any clearance or removal belongs in the installation package.
Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.
Rectangular poured bases: all guide sizes
| Size | Guide price |
|---|---|
| 8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² | From £811 |
| 10' x 6' 3m x 1.8m 60 ft² / 5.57 m² | From £964 |
| 10' x 8' 3m x 2.4m 80 ft² / 7.43 m² | From £1,168 |
| 12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² | From £1,270 |
| 12' x 10' 3.6m x 3m 120 ft² / 11.15 m² | From £1,422 |
| 14' x 10' 4.2m x 3m 140 ft² / 13.01 m² | From £1,524 |
| 16' x 10' 4.8m x 3m 160 ft² / 14.86 m² | From £1,728 |
| 18' x 10' 5.4m x 3m 180 ft² / 16.72 m² | From £1,830 |
| 20' x 10' 6m x 3m 200 ft² / 18.58 m² | From £2,034 |
Corner, hexagonal and octagonal poured bases
Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.
| Size | Guide price |
|---|---|
| 7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² | From £811 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £964 |
| 9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² | From £1,168 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,270 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £821 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,254 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,621 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £1,958 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £821 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,254 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,621 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £1,958 |
No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.
Tell us about the base you need
A brief description of the building or intended use and the postcode is enough for a first enquiry. Approximate measurements or a photograph are welcome if you have them; drawings can follow later. Call 01202 039753 or use the quote and WhatsApp options here.
Request your free quote
Just give us your contact details and a short description of what you want to build. We will guide you through the rest.
Your enquiry
Concrete bases in Salisbury
From setting out to a usable base
The installation follows an agreed plan for the building position, supporting preparation and finished surface. We also agree how long the concrete must be left before the next part of the project can begin.
Confirm the building and levels
We establish the base footprint and orientation, compare it with the building requirements and agree the top level. Door positions, nearby ground and the route into the building help settle the threshold and edge details.
Prepare the ground and base layers
The agreed area is excavated and prepared for the supporting build-up. We form the edges and install the specified materials and details, with service routes resolved before they become difficult to reach.
Place and finish the concrete
Concrete is placed within the prepared formwork and finished to the specified level and surface. The work is coordinated with the access arrangements and the area available for handling materials.
Cure and agree the handover
The fresh slab needs protection and curing time. We explain when access, building assembly and heavier loading are appropriate for the specification and conditions, and confirm any remaining work included in the quotation.
Planning access and the finished floor
Good access information helps us plan the installation accurately. Include the narrowest opening, changes of level, the distance to the proposed base and surfaces along the way. Let us know whether the route passes through a building, shared entrance or area that must remain available during the work.
Keep the base location available for assessment and discuss any existing shed, paving, vegetation or concrete that needs removing. Clearance and disposal can be included where agreed; the quotation should make the boundary between your preparation and our work clear.
Think about how you will use the finished floor. A mower, trolley or mobility aid may need a considered entrance rather than a large step. External ground should direct water appropriately without compromising the building's damp protection or required floor clearance. Any ramp, path or surrounding paving is a separate item unless included.
If power or other services will enter through the base, agree their positions and the responsibility for installing conduits before the pour. Tell us about known underground pipes, cables and drains, and any nearby trees or structures that could affect the work.
Choosing a building and checking permissions
Selecting the building model makes it easier to confirm the foundation detail. For example, The Shed Shop in South Newton makes custom timber buildings at South Newton Industrial Estate. Ask your chosen maker for the final base size, floor support and fixing requirements, then pass those to us when available.
Check permissions for the building, its use and any relevant ground works before fixing the installation date. Wiltshire Council's property register provides an address-led route to application information; its conservation-area guidance is useful if your property has a designation. Building regulations are a separate check from planning permission.
For enquiries towards Redlynch or Landford, the New Forest National Park property checker and planning search helps identify whether the address is within the park. Use the authority responsible for the actual property when seeking advice.
If your building would work better on a raised frame, explore ground screw installation in Salisbury. Where a screw foundation needs measured load evidence, Salisbury ground screw testing can be arranged separately.
Salisbury and surrounding-area enquiries
We welcome concrete-base enquiries from Salisbury and the villages below. Send the full postcode with the project outline so we can confirm the access, work and installation arrangements for your address. SP1 and SP2 cover city and nearby addresses; we also consider surrounding SP3, SP4 and SP5 enquiries on that address-led basis.
- Salisbury neighbourhoods and immediate surroundings: city centre, Harnham, Bemerton, Bemerton Heath, Fisherton, Churchfields, St Paul's, Stratford-sub-Castle, Milford, Milford Hill, Petersfinger, Bishopdown, Bishopdown Farm, Hampton Park, Riverdown Park, Laverstock, Ford, Old Sarum and Longhedge.
- Wilton and neighbouring villages: Wilton, Quidhampton, Netherhampton, Burcombe, South Newton, Stoford, Great Wishford, Stapleford, Steeple Langford, Barford St Martin, Compton Chamberlayne, Dinton and Fovant.
- Woodford, Amesbury and nearby villages: Lower Woodford, Middle Woodford, Upper Woodford, Great Durnford, Little Durnford, Netton, Salterton, Newtown, Amesbury, Winterbourne Earls, Winterbourne Dauntsey, Winterbourne Gunner, Hurdcott, Porton, Idmiston, Gomeldon, Allington, Boscombe, Newton Toney and Cholderton.
- Alderbury and adjoining villages: Alderbury, Whaddon, Pitton, Farley, Firsdown, Winterslow, East Grimstead, West Grimstead, West Dean and Whiteparish.
- Britford, Downton and the southern villages: Britford, Odstock, Nunton, Bodenham, Downton, Charlton All Saints, Standlynch, Redlynch, Morgan's Vale, Woodfalls, Lover, Bohemia, Landford, Nomansland and Hamptworth.
- Coombe Bissett and the Chalke villages: Coombe Bissett, Homington, Stratford Tony, Bishopstone, Broad Chalke, Bowerchalke and Ebbesbourne Wake.
Feedback on Craig’s earlier work
"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
Concrete base questions
These answers explain the main choices before a site-specific quotation.
When is a poured concrete base a useful choice?
It is useful when the building needs continuous support or you want a solid floor as part of the foundation. Storage, workshop use and equipment access can make that attractive. We compare those needs with the supplier's support detail and the practical work required to prepare the site.
Should the base match the advertised shed size?
Use the supplier's foundation dimensions rather than relying only on the model name or roof size. Wall lines, floor bearers, roof overhangs and optional features can have different measurements. We confirm the agreed footprint before setting out and can start an enquiry while you are still choosing the building.
How are slab thickness and reinforcement decided?
The intended loads, building requirements and supporting ground inform the specification. Heavy equipment or a structural design may require particular reinforcement or other details. Tell us what the building will contain so the quotation covers the appropriate work; any required design information is agreed before installation.
Can you remove an existing concrete base?
Removal and disposal can be allowed for in the written quotation. A photograph, approximate dimensions and an indication of the access help us assess the work. We also establish whether anything is attached to the old base and whether services or nearby structures affect its removal.
Can concrete be installed on a sloping site?
A level base may be achievable with suitable excavation, edge construction and supporting preparation. The amount of level change and the surrounding ground affect the solution. Retaining work and changes to paths need their own agreed scope, and a raised foundation may be worth comparing where it suits the building.
Will the slab be suitable as the inside floor?
That can be part of the plan. Tell us whether the concrete will remain exposed or receive a floor covering, and describe the intended use. Surface finish, damp protection, insulation and any later flooring requirements should be coordinated with the building detail before the pour.
Is damp protection included?
The quotation identifies the damp-protection detail included for the agreed base. Its position and continuity need to work with the building's wall and floor construction. If a supplier or designer specifies a membrane or particular junction, share that requirement before the installation is finalised.
When should I decide where electricity enters the building?
Decide the entry route before the slab is poured if a conduit or opening will pass through it. Your electrician or other appropriate installer should agree the service requirements and responsibilities with the foundation work. A base quotation does not automatically include the electrical installation.
What access information helps you quote?
Describe where a vehicle can stop and the whole route from there to the base. Useful details include gate widths, steps, corners, overhead restrictions and surfaces requiring protection. Photographs make those details easier to discuss, but you can begin by explaining the route in words.
How soon can the building go on the finished concrete?
We agree the curing and loading interval for the slab specification, weather and intended next operation. Walking on the surface, erecting a building and bringing in heavy equipment can require different timings. Coordinate delivery with the agreed handover instead of assuming that the pour date is the building installation date.
Does arranging a base settle planning and building regulations?
Those checks concern the proposed building, its use and the property as well as the foundation. Obtain any necessary advice or consent from the responsible authority before work is booked. Tell us about conditions affecting the base, protected trees or specified construction details so they can be considered in the scope.
Can I enquire before I have drawings or a final building order?
Yes. Tell us the purpose, site postcode and roughly what size you are considering. We can discuss the options and information needed next. The final dimensions and any required specification must be settled before installation, but they do not need to be ready for your first call.
Discuss your Salisbury concrete base
Send your building idea and postcode, and we will help identify the next useful details. You can also return to bases in Salisbury or see our Wiltshire service areas.
