
Concrete base installation in Seaton
For a continuous base beneath your Seaton building, JustBases can prepare the ground and install poured concrete. We quote work for garages, workshops and garden buildings, including the supporting construction and finish required for their use.
Concrete bases for your project
A poured slab gives a building continuous support and can be its usable floor. Alternatively, it can be the foundation below a separately supplied floor system. We clarify which role the concrete has, then agree the preparation, dimensions and finish.
If you are considering individual paving on a concrete or mortar bed, or a suitable frame supported on posts or screws, see the other Seaton base options. Those methods provide different supporting arrangements from the poured work described here.

Garages
A garage floor is planned for the vehicles and the building’s fixing requirements. We discuss the door opening and the way it meets the approach, alongside the concrete construction required for the garage being supplied.
Learn more: Garages
Workshops
A hard floor can be useful for workshop activities and storage. Substantial equipment and its loading need considering with the building itself. Tell us how you want to use the completed floor when discussing its finish and construction.
Learn more: Workshops
Sheds
Concrete can form the floor in a suitable shed supplied without one. For a shed with a floor kit, the concrete instead receives the specified bearing arrangement. The selected shed’s fixing and support instructions help define that work.
Learn more: Sheds
Garden rooms
The base may sit beneath an insulated floor and wall system provided by the room supplier. Its construction detail establishes the support required and the concrete level below the finished floor.
Learn more: Garden rooms
Log cabins
The cabin maker’s foundation plan identifies the outline and support required below walls and floor members. We use it to agree the continuous base, with the appropriate top level for the complete cabin construction.
Learn more: Log cabins
Summerhouses
Corner and shaped summerhouses can need an outline that follows the chosen model. Obtain its actual base plan and floor information so the poured construction can be prepared for the building that will be assembled.
Learn more: SummerhousesBrowse 74 application guides
Garden & residential
Work & modular buildings
Garages & storage
Leisure & wellness
Energy & equipment
Renewable energy
Animal & agricultural
Commercial & community
Leisure accommodation
Concrete base prices in Seaton
The schedules cover rectangular, corner, hexagonal and octagonal poured bases. Use them to explore the budget for the outline you are considering, then confirm the required dimensions against the building maker’s base plan. The written quotation is for the construction and site work agreed for your project.
What affects your quotation
Access for materials, excavation and the work needed below the concrete affect the installation. Include any clearance, old-base removal and waste disposal you want priced. Finished levels, the required surface and specified construction details also matter, including membrane or reinforcement where required. We make clear which preparation is supplied by us and which is arranged separately.
Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.
Rectangular poured bases: all guide sizes
| Size | Guide price |
|---|---|
| 8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² | From £850 |
| 10' x 6' 3m x 1.8m 60 ft² / 5.57 m² | From £1,010 |
| 10' x 8' 3m x 2.4m 80 ft² / 7.43 m² | From £1,224 |
| 12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² | From £1,331 |
| 12' x 10' 3.6m x 3m 120 ft² / 11.15 m² | From £1,491 |
| 14' x 10' 4.2m x 3m 140 ft² / 13.01 m² | From £1,598 |
| 16' x 10' 4.8m x 3m 160 ft² / 14.86 m² | From £1,812 |
| 18' x 10' 5.4m x 3m 180 ft² / 16.72 m² | From £1,919 |
| 20' x 10' 6m x 3m 200 ft² / 18.58 m² | From £2,133 |
Corner, hexagonal and octagonal poured bases
Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.
| Size | Guide price |
|---|---|
| 7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² | From £850 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,010 |
| 9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² | From £1,224 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,331 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £861 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,315 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,700 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £2,053 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £861 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,315 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,700 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £2,053 |
No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.
Get a concrete base quote
Let Craig know the building or floor you are planning and the site postcode. Add the size if known, but you can begin with an outline of the project. Any supplier plan or photographs can follow when available.
Call 01202 039753, message Craig on WhatsApp or use the form here for a written concrete quotation.
Request your free quote
Describe the proposed building or use of the floor, with the site postcode.
Your enquiry
Concrete bases in Seaton
How we install a concrete base
Agreeing the footprint and top level
We establish the required base outline and its height. This includes understanding any floor layers above the concrete and the building’s doorway, so the formed base is prepared for the construction that follows.
Preparation and supporting construction
The position is cleared and prepared to the agreed scope. We construct the required supporting layers and form the edges, with any specified membrane, reinforcement or other details in place for the pour.
Pouring and finishing
Concrete is placed and the surface finished for its planned purpose. We protect the new work as required while it cures.
Curing and handover
Allow for the advised curing and protection before the next work starts. We discuss readiness for building assembly and any equipment or vehicle use, which can involve different loads. The handover arrangements follow the specified concrete and relevant conditions.
Access, existing bases and finished levels
Show us how materials can reach the position and where there is room to work. Gates, changes in level and the available route help establish practical delivery and removal arrangements.
If a base is already present, explain whether you hope to keep it or want it removed. Its suitability needs assessing for the new use. Where breaking out and disposal are wanted, those tasks must be included in the work priced.
Set the concrete level from the complete building floor and entrance. A floor system above the slab takes up height, while concrete used directly as the floor has a different relationship to the doorway. The proposed approach and any necessary drainage detail are considered before construction.
Planning a concrete base in Seaton
For advice about the proposed building’s permission requirements, use East Devon’s planning enquiry route. Ask a building-control body about the separate regulations requirements; GOV.UK explains where to apply.
A nearby property may use a different council service from Seaton. Check the actual address with the council finder when needed.
Areas we cover around Seaton
We welcome enquiries in Seaton town centre and the Seaton Hole, Seaton Down Road, Seaton Down Hill, Harepath Hill, Harepath Road, Colyford Road, Beer Road, Harbour Road and The Underfleet areas.
Nearby communities include Beer, Branscombe, Southleigh, Northleigh, Farway, Netherton, Sallicombe and Woodbridge. You can also ask about work around Offwell, Wilmington, Widworthy and Honiton.
We consider projects in Colyford, Colyton, Whitford, Shute, Seaton Junction, Umborne and Hampton, together with Kilmington, Dalwood, Stockland and Axminster.
Other local enquiry areas include Axmouth, Dowlands, Stedcombe Vale, Boshill, Musbury, Combpyne and Rousdon.
Enquiries are also welcome from Weston, Salcombe Regis, Sidbury, Sidford and Sidmouth, as well as Uplyme and Lyme Regis.
EX12, EX24, EX13, EX14, EX10 and DT7 are district examples for the places listed. Send the full site postcode and the work required so we can confirm availability and allow for the arrangements and travel in your written quotation.
Feedback on Craig’s earlier work
"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
Frequently asked questions
What will the concrete do beneath my building?
It may be both the foundation and the surface you use inside, or a base below the supplier’s own floor system. Tell us what construction comes with the building and how the space will be used. That establishes the concrete’s role and the finish needed at handover.
Which information from the building maker matters?
Its current base plan gives the required outline and the support and fixing details. Information about the floor above the base helps establish the top level of the concrete. We use the selected building’s requirements when defining the work, particularly where its shape or edge detail needs matching.
Which base shapes can I discuss?
We quote rectangular and shaped poured work, with corner, hexagonal and octagonal guides alongside the rectangular schedule. A guide size is a budgeting reference. The actual manufacturer’s foundation plan is used to settle the shape, dimensions and formwork for the installation being ordered.
How does the quote account for ground preparation?
It identifies the preparation needed at the proposed position and which parts we are carrying out. That can include clearance, excavation, supporting construction and dealing with removed material. Access and existing foundations also affect the work, so explain what is there and what you need us to undertake.
Can somebody else clear or prepare the position?
Yes, that division of work can be agreed. We need to establish the condition in which the position will be handed over and any preparation still needed for our installation. Make clear who is dealing with material on site so the quoted tasks and responsibilities are understood.
What should I tell you about an existing slab?
Say what you know about its construction and what you want to build on it. An assessment is needed before it is relied on for the proposed use.
What finish can be discussed for a workshop floor?
Explain the activities, equipment and storage you expect to use the workshop for. Those requirements help define both the floor surface and supporting concrete construction. Loading information for substantial machinery is useful when available, so its effect can be considered before the base is specified.
What changes for a garage taking vehicles?
The concrete must be specified for the garage and its intended vehicle use. We also need the maker’s base and fixing requirements and a suitable relationship between the floor, door and approach. Those details are agreed before forming the base and when planning its loading after curing.
How are the concrete level and doorway coordinated?
The required finished floor level is considered with any construction above the slab. That establishes where the concrete surface sits relative to the door and the approach outside.
How are membrane, reinforcement and other construction details established?
Pass on the building supplier’s foundation detail when available and explain how the floor will be used. We assess those requirements with the site and define the construction in your quote, including any membrane or reinforcement required.
When can I arrange the building assembly?
Plan it around the curing and readiness advice for the concrete being used. The new base needs the specified protection and time before receiving the planned loads. Assembly, floor work and heavier equipment or vehicles may have different readiness requirements; those stages are agreed for the project.
Can I request a price before the drawings are finished?
Yes. Give us the proposed use and the postcode, with an approximate size if you know it. Supplier plans and photographs are helpful as the details develop, but are optional for the first enquiry.
What happens next
We agree the required concrete construction and the preparation to price. The written quotation sets out that work before arrangements are made for installation. We explain the curing and loading advice for the completed base so the building work can be planned around its readiness.
Request a concrete quote, call 01202 039753 or contact Craig on WhatsApp.
