
Concrete base installation in Sidmouth
JustBases installs poured concrete bases in Sidmouth for garden buildings. We agree the building outline and construction, prepare the area, and place and finish the concrete. Handover includes advice on curing and when the base is ready for the next work.
Poured concrete support for garden buildings
Concrete can create a continuous floor or a firm supporting surface beneath a building’s own floor. We establish which role it will serve, together with the loads and required finish. Individual paving slabs on a bed are a different base method.

Shed bases
Match the concrete to the shed’s required base dimensions and floor construction. Its bearers, wall supports and doorway all need the intended relationship to the finished surface.
Learn more: Shed bases
Workshop bases
A continuous hard floor can suit working and storage use. Tell us about substantial equipment and any particular surface requirements when discussing the slab construction.
Learn more: Workshop bases
Garden-room bases
Where additional floor layers will be fitted, the concrete level is agreed with that complete build-up. The room company’s bearing and doorway details help define the work before pouring.
Learn more: Garden-room bases
Summerhouse bases
Corner and multi-sided summerhouses need the foundation outline for the actual model. The concrete can then be planned with its bearing edges and entrance position.
Learn more: Summerhouse bases_1768039694155.CrOLEM4N_1XJ4xe.webp?dpl=dpl_BC3QiZExVcAMF6meDzMb7s6ibQnq)
Greenhouse bases
Explain whether the inside needs a solid surface or open planting areas. The maker’s frame and door requirements establish the support needed around that intended layout.
Learn more: Greenhouse basesBrowse 74 application guides
Garden & residential
Work & modular buildings
Garages & storage
Leisure & wellness
Energy & equipment
Renewable energy
Animal & agricultural
Commercial & community
Leisure accommodation
Concrete base prices
Use the rectangular, corner, hexagonal and octagonal schedules for initial guidance. Final dimensions come from the building’s base plan, with the specified construction and preparation confirmed in your quotation.
What affects your quotation
The price depends on the work required to reach the agreed construction: clearance, excavation, existing-base removal and waste disposal where ordered, access for materials, supporting layers and finished levels. Specified membranes, reinforcement and the required surface finish also need to be established.
Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.
Rectangular poured bases: all guide sizes
| Size | Guide price |
|---|---|
| 8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² | From £856 |
| 10' x 6' 3m x 1.8m 60 ft² / 5.57 m² | From £1,018 |
| 10' x 8' 3m x 2.4m 80 ft² / 7.43 m² | From £1,233 |
| 12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² | From £1,341 |
| 12' x 10' 3.6m x 3m 120 ft² / 11.15 m² | From £1,502 |
| 14' x 10' 4.2m x 3m 140 ft² / 13.01 m² | From £1,610 |
| 16' x 10' 4.8m x 3m 160 ft² / 14.86 m² | From £1,825 |
| 18' x 10' 5.4m x 3m 180 ft² / 16.72 m² | From £1,933 |
| 20' x 10' 6m x 3m 200 ft² / 18.58 m² | From £2,148 |
Corner, hexagonal and octagonal poured bases
Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.
| Size | Guide price |
|---|---|
| 7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² | From £856 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,018 |
| 9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² | From £1,233 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,341 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £867 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,325 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,712 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £2,067 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £867 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,325 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,712 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £2,067 |
No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.
Request a concrete base quotation
Start with the postcode, the type of building and the size you have in mind. A supplier drawing or photographs can help when available, but the first discussion can begin without them.
Use the form, call 01202 039753 or message Craig on WhatsApp to talk about the base and preparation.
Request your free quote
Ask about your proposed concrete base, even if the building details are still being chosen.
Your enquiry
Concrete bases in Sidmouth
How your concrete base is installed
The finished floor and the supporting construction are agreed before the pour. We then carry out the accepted work in the following stages.
Agree the footprint and finished level
We use the building requirements to establish the concrete outline and top level. Any floor above the slab and the relationship to the doorway and adjoining surfaces are included in that planning.
Prepare the ground and supporting layers
We carry out the quoted preparation and establish the specified base construction. This includes the agreed excavation and supporting layers, with membrane or reinforcement details provided where required by the specification.
Place and finish the concrete
We place concrete to the accepted dimensions and finish the surface for its intended use. The agreed edge and floor details establish what is being supplied for the building and any subsequent floor work.
Confirm curing and handover
We explain the care and curing the new base needs and discuss when assembly and loading can proceed. Follow that advice when arranging delivery, fixings or further construction on the concrete.
Preparation, access and the finished floor
Let us know what currently occupies the building position. An old base may need assessment, or clearance may form part of the order. The quotation should make the extent of removal and disposal clear, including any preparation you are arranging separately.
Material access is considered for the route that actually reaches the work. Gates, corners, steps and the distance to the position can affect handling. A vehicle does not have to reach the footprint for you to enquire; we discuss suitable arrangements for the proposed work.
Agree the floor level before construction, allowing for the building’s doorway and any layers above the concrete. Adjoining paths and any required water-management detail at the edges also belong in that discussion.
Coordinating your base and building
Ask the building company for its foundation dimensions and required construction. That lets the base and building be ordered to an agreed plan, with the assembly date allowing for the concrete’s readiness.
For the proposed building, East Devon has planning guidance and separate building-regulations information. Check the requirements relevant to the property and use while the project is developed.
See Sidmouth base and testing services for the other methods, including ground screw installation for suitable framed floors. Our Devon locations cover further enquiry areas.
Concrete base enquiries around Sidmouth
In Sidmouth, we welcome enquiries from the town centre, Woolbrook, Stowford Rise, Primley, Manstone, Bulverton, Bickwell Valley and Higher Fortescue.
Nearby places include Sidford, Sidbury, Salcombe Regis, Harcombe, Greenhead, Furzehill, Cotford and Putts Corner.
Enquiries are also welcome from Newton Poppleford, Harpford, Venn Ottery, Southerton, Tipton St John, Fluxton, Metcombe and Wiggaton.
Towards Ottery St Mary, the surrounding communities include West Hill, Alfington, Fairmile, Fenny Bridges and Gosford.
Other nearby enquiry areas include Colaton Raleigh, Otterton, East Budleigh, Bicton, Yettington and Budleigh Salterton.
Enquiries are welcome from Weston, Branscombe and Beer.
Inland communities include Farway, Northleigh, Southleigh, Gittisham and Honiton.
Local postcode examples include EX10 for Sidmouth and Colaton Raleigh, EX11 around Ottery St Mary, EX9 around East Budleigh, EX12 at Branscombe, EX24 at Northleigh and EX14 around Gittisham and Honiton. Give the full postcode with your project so availability, travel and working arrangements can be confirmed for the address; these examples do not promise attendance at every address in a district.
Feedback on Craig’s earlier work
"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
Concrete base questions
How does poured concrete differ from paving?
Poured concrete is placed and finished as one continuous base. Paving uses individual slabs laid on a prepared concrete or mortar bed. The building’s support and the surface you want determine which construction is relevant.
Is concrete useful for a shed with its own floor?
It can provide continuous support beneath the shed, subject to the maker’s requirements. Confirm how the supplied floor and bearers are constructed and fixed. That information establishes the base they need and helps decide whether concrete or another support arrangement suits the proposal.
How is a workshop or summerhouse footprint agreed?
Use the foundation dimensions for the selected building, including its required bearings and outline. A roof overhang or advertised overall size may not describe the base. For a shaped building, the actual plan is useful for establishing the corners and edges before construction.
What can change the quotation?
Preparation, removal, material handling, finished levels and the specified floor construction can all change the work. Tell us about an existing base or clearance you want included. The quotation identifies the scope for your site, including the surface and any necessary construction details.
Can old-base removal be included?
Yes, it can be discussed and expressly included where required. The existing base and any known construction below it need to be considered when assessing the work. Agree the breakout, disposal and subsequent preparation so the accepted price makes those responsibilities clear.
What if vehicles cannot reach the base?
Describe the route through to the proposed position and any gates, turns or steps. That helps establish how materials and work can be arranged for the site. Share safe photographs or rough measurements if useful; access is assessed before the agreed handling is priced.
How are thickness and reinforcement chosen?
The concrete construction is established for the building loads, floor requirements and site, with relevant supplier or design input. Thickness, supporting layers and reinforcement are parts of that specification. The agreed work is then identified in the quotation before construction begins.
Can the base match the doorway level?
The top level is planned with the doorway, the floor construction above it and the surrounding approach. Tell us about any intended floor covering or changes outside. Those details allow the required levels and any additional work to be established for the actual building.
When can the building go on new concrete?
Use the readiness advice given for the completed base and the next work you intend to carry out. Concrete needs time to cure before the relevant assembly or loading. Discuss the building programme with us so its delivery and construction allow for that stage.
Does a greenhouse need a full solid floor?
Not necessarily. The frame may need perimeter support while you want open growing beds inside. Work from the chosen model’s base and door requirements, then discuss where paths, staging or a solid working area are wanted. That establishes how much concrete or other surface is appropriate.
Who checks permission and building regulations?
The proposal’s requirements need checking with the relevant authority and any responsible professional advisers. East Devon offers separate planning and building-control routes for this area. The base enquiry can proceed while you check the intended building, use and property requirements.
Can I ask before drawings are final?
Yes. Explain the proposed building and give the postcode, with a rough size if known. We can discuss the work at that stage.
Discuss the base you need
Request a quotation for the concrete work and its preparation. We can discuss the floor and building before confirming the scope. To speak to Craig, call 01202 039753 or send a WhatsApp message.
