Ground screws before installation

Ground screw installation in Sidmouth

We install ground screws in Sidmouth for buildings with a suitable supported floor or frame. Localised screw supports can reduce the excavation and spoil associated with preparing a full continuous base, and the screws need no concrete curing period. Ask JustBases about the installed foundation alone or an agreed timber-frame package.

Ground screw foundations for your building

A screw foundation supports a suitable floor or frame at the required positions. Loads from the building pass through that construction and its connections into the screws and ground. We consider the building’s bearing requirements when agreeing the foundation.

Sheds

Sheds

The shed’s bearer arrangement establishes where its floor needs support. We discuss the connections beneath that floor so the foundation matches the chosen shed and its use.

Learn more: Sheds
Garden rooms

Garden rooms

The supplied floor, frame and doorway set important requirements for the supports. Agreeing what the room company provides helps define the foundation work and the proposed floor height.

Learn more: Garden rooms
Summerhouses

Summerhouses

A suitable summerhouse frame can be considered with a screw foundation. For a shaped model, its actual support plan helps establish the bearing positions below the floor.

Learn more: Summerhouses
Log cabins

Log cabins

Cabin wall and floor loads need the support set out by its manufacturer. The proposed frame, connections and screw positions are coordinated with that information.

Learn more: Log cabins
Workshops

Workshops

Include the workshop’s intended contents in the discussion. Heavy equipment or concentrated storage can affect the floor and foundation requirements as well as the building’s own weight.

Learn more: Workshops
Browse 74 application guides

Ground screw and frame prices

The installed-screw guide is for a frame provided by others; the timber-frame package includes the stated supporting frame. Establish which order fits your supplier’s building package. Steel or other non-standard frames are individually assessed and quoted, together with any separately requested monitoring or testing.

Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.

Building sizeInstalled ground screwsFrame by othersInstalled screws + timber frame
8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² From £1,271From £1,777
10' x 8' 3m x 2.4m 80 ft² / 7.43 m² From £1,378From £1,884
12' x 10' 3.6m x 3m 120 ft² / 11.15 m² From £1,508From £1,992
16' x 10' 4.8m x 3m 160 ft² / 14.86 m² From £1,615From £2,207
20' x 10' 6m x 3m 200 ft² / 18.58 m² From £1,723From £2,638

No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.

Ask about your ground screw installation

Send the postcode and a short description of the proposed building. If you already know who supplies its frame, tell us; a plan or model link is useful when available.

Call 01202 039753, WhatsApp Craig or use the form to discuss the foundation.

Request your free quote

Tell us what you want the ground screw foundation to support. A building idea and postcode are enough to begin.

Your enquiry

Ground screw installation in Sidmouth

Please provide either an email address or a phone number.

Add site photos, video or a drawing (optional)

Upload up to 5 photos or a short video of your site to help us provide an accurate quote.

0/5 files. JPG, PNG, WebP, PDF, MP4, MOV accepted — up to 100MB each.

Free, no-obligation quote. Your details are used to respond to this enquiry; see our privacy policy.

How we install the foundation

We agree the installation around the building’s support requirements and the proposed site. The quotation makes the division between foundation, frame and building work clear.

Agree the building supports

Agree the building supports

We establish the required support positions, loads, finished heights and connections with the appropriate building information and site assessment. Any frame construction and requested testing or records are defined for the order.

Set out and install the screws

Set out and install the screws

We mark the agreed positions and carry out the required preparation and installation. Relevant service checks, existing construction and working access are considered before the specified supports are installed.

Complete the frame connections and handover

Complete the frame connections and handover

We complete the frame or connection work included in the quotation and provide the agreed records. Where the frame is by others, the interface for their work is confirmed at handover.

Site preparation and foundation details

Tell us about the route to the position and any known services, old foundations or other construction in the ground. These help establish the assessment and preparation needed at the proposed supports. Any removal or extra preparation should be clear in the accepted work.

The required height is considered with the complete floor and frame, including its stability and doorway. Appropriate connection details establish how that construction is supported. We assess these requirements for the building and site before installation.

If an obstruction affects the planned work, the affected support or preparation needs review and an agreed response. Known service information should be shared before work; do not excavate around services to prepare information for an enquiry.

Testing and installation records

The project may require particular records or physical loading evidence. Discuss those needs before installation so the relevant work can be agreed at the right stage. Ground screw testing in Sidmouth is available separately for suitable trial or existing screws.

Insertion-torque monitoring records turning resistance during driving and is price on application. Applied torsional testing is a different, separately priced-on-application service that investigates twisting-load response. Pull-out, compression and lateral tests instead investigate their agreed upward, downward or sideways forces. These services are not automatically included in an installation order.

Planning the installation with your building supplier

Confirm whether the building order includes a frame, a floor and their fitting. Agreeing those responsibilities lets the supplier and foundation work meet at the required support positions and levels. The next stage follows the completed work and readiness confirmed at handover.

For the building proposal, East Devon provides planning information and a separate building-regulations route. The Sidmouth overview explains the other base methods, and Devon service locations gives the wider directory. You can discuss the foundation while the building requirements are being clarified.

Sidmouth and nearby installation enquiries

In Sidmouth, we welcome enquiries from the town centre, Woolbrook, Stowford Rise, Primley, Manstone, Bulverton, Bickwell Valley and Higher Fortescue.

Nearby places include Sidford, Sidbury, Salcombe Regis, Harcombe, Greenhead, Furzehill, Cotford and Putts Corner.

Enquiries are also welcome from Newton Poppleford, Harpford, Venn Ottery, Southerton, Tipton St John, Fluxton, Metcombe and Wiggaton.

Towards Ottery St Mary, the surrounding communities include West Hill, Alfington, Fairmile, Fenny Bridges and Gosford.

Other nearby enquiry areas include Colaton Raleigh, Otterton, East Budleigh, Bicton, Yettington and Budleigh Salterton.

Enquiries are welcome from Weston, Branscombe and Beer.

Inland communities include Farway, Northleigh, Southleigh, Gittisham and Honiton.

Local postcode examples include EX10 for Sidmouth and Colaton Raleigh, EX11 around Ottery St Mary, EX9 around East Budleigh, EX12 at Branscombe, EX24 at Northleigh and EX14 around Gittisham and Honiton. Give the full postcode with your project so availability, travel and working arrangements can be confirmed for the address; these examples do not promise attendance at every address in a district.

Feedback on Craig’s earlier work

Feedback on Craig’s earlier groundwork and customer service.

"Craig and the team are absolutely fantastic. From courtesy, to standard of work, to tidiness — everything exceeded expectations. The job was arranged, booked and done extremely quickly and we are very happy with the results. Nothing was too much trouble, and communication was easy."
— Verified CustomerMyBuilder · SO · Cobble edge and gravel strip
"Craig and his crew were excellent from the first communication, quote, timing of work and quality of work. Highly recommended."
— Verified CustomerCheckatrade · BH20 · Garage base

Ground screw installation questions

Which garden buildings can screws support?

They can be considered for buildings whose floor or frame is suitable for individual supports. The maker’s bearings, loads and connection requirements determine the arrangement. Tell us which building you are considering so the foundation can be discussed with its actual construction in mind.

What is frame-by-others installation?

It is an installed screw foundation intended to receive a compatible frame from another provider. The frame itself is outside that package unless specifically quoted. The required support positions, head connections and heights need coordinating so the separate frame can be fitted to the foundation.

Can you include a timber frame?

Yes, the stated timber-frame package can be discussed for a suitable building. The quotation identifies the supporting frame supplied with the screws. Check that scope alongside the building order, particularly which floor elements and assembly work the building company provides.

How are steel frames quoted?

A proposed steel frame is considered individually, including its support and connection requirements. Its construction and any supplied frame work need their own quotation.

Why can screws reduce preparation?

Supports are installed at individual bearing positions beneath the suitable frame. This can reduce the need to excavate and replace material over the complete footprint, with less resulting spoil. Required clearance and preparation around the actual supports are still established for the installation.

Do screws need a concrete curing period?

The screws themselves do not need concrete to cure before carrying their agreed load. The foundation still needs its specified connections and any included frame completed and ready. Discuss that handover point when arranging the building assembly that follows.

Who agrees positions and supports?

The building’s support requirements and relevant design input are considered with the site assessment to establish the foundation. Loads, bearings, heights and connection details all contribute to the agreed installation.

Can different ground levels be accommodated?

They can be considered as part of a suitable frame and support design. The required floor level, stability and connections need to work together, including the entrance and surrounding surfaces.

What should I share about underground services?

Tell us about known service routes, connections and records that affect the proposed foundation. Proper checks and any resulting constraints need to be resolved for the work. Share what is already known safely; do not uncover or disturb a service to make an enquiry.

What if an obstruction is found?

The effect on the specified work needs assessment before an appropriate response is agreed. That may involve the preparation or support arrangement. The decision should follow the building’s requirements and the actual finding.

How much access is needed?

The practical route and working area are assessed for the installation. Let us know about gates, corners, steps and space at the proposed supports; photos or measurements can help explain them.

Are testing or torque records included?

Only the evidence and records expressly agreed for the order are included. Ask while planning installation if particular information is required. Monitoring during driving, applied torsion and physical tests have different scopes; the local testing page explains the separate testing offer.

How do lifespan and guarantee differ?

The expected 50-plus-year life of a correctly specified hot-dip galvanised product depends on ground conditions and correct installation. JustBases’ full 10-year guarantee covers its installation workmanship and supplied foundation materials, subject to the written quotation. The building’s own warranty and standalone testing results are separate.

Can I enquire while plans change?

Yes. Tell us what the building is for and where it will stand, using the information you have now. Let us know when a change affects its size, floor or support requirements so the foundation and frame scope can be settled for the building ultimately ordered.

Start with the building you have in mind

Ask us about the installation and we can discuss the foundation and any frame package to quote. For a direct conversation, call 01202 039753 or message Craig.