
Concrete base installation in Swanage
JustBases installs poured concrete bases in Swanage for suitable garden buildings, workshops and garages. We agree the footprint, construction and finish for your project, including whether the concrete supports a supplied floor or forms the hard floor inside.
Concrete bases for your project
A continuous base can give a building full-area support and an agreed hard surface. The construction is developed around the building and its use, including the floor finish and significant loads. Poured concrete is a different arrangement from individual paving slabs or a floor carried on isolated supports.

Sheds
The base can sit beneath the shed's supplied timber floor or provide a hard floor for a suitable floorless building. Confirming the model helps establish its outline and bearing requirements.
Learn more: Sheds
Workshops
A workshop needs a floor suitable for the work you intend to do. Let us know about equipment and storage so those requirements can be included when the construction and finish are agreed.
Learn more: Workshops
Garden rooms
The room's structural floor and any insulation or finishing layers affect the foundation arrangement. We coordinate the agreed concrete level with the building supplier's requirements.
Learn more: Garden rooms
Garages
Vehicle or storage use, building construction and the door opening all matter to a garage floor. The quoted base should identify the appropriate construction and finish for that project.
Learn more: Garages_1768039694155.CrOLEM4N_1XJ4xe.webp?dpl=dpl_BC3QiZExVcAMF6meDzMb7s6ibQnq)
Greenhouses
Agree the greenhouse's perimeter, doorway and internal growing layout before deciding the extent of the concrete. The foundation needs to follow the actual base instructions.
Learn more: GreenhousesBrowse 74 application guides
Garden & residential
Work & modular buildings
Garages & storage
Leisure & wellness
Energy & equipment
Renewable energy
Animal & agricultural
Commercial & community
Leisure accommodation
Concrete base prices in Swanage
The guides below cover rectangular, corner, hexagonal and octagonal bases. Use the proposed building outline when comparing shapes, then ask for the work to be priced for the actual site and intended floor.
A written quotation brings the construction and preparation together. It should be clear what surface will be ready for the building installer and which existing materials, if any, are being removed.
What affects your quotation
The price depends on the footprint and agreed construction, the preparation and excavation required, access for the work, and the finished level and surface. Breakout, waste removal and disposal of an existing base are included only where agreed. Any design-dependent reinforcement, supporting layers or other details belong in the quoted scope.
Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.
Rectangular poured bases: all guide sizes
| Size | Guide price |
|---|---|
| 8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² | From £824 |
| 10' x 6' 3m x 1.8m 60 ft² / 5.57 m² | From £980 |
| 10' x 8' 3m x 2.4m 80 ft² / 7.43 m² | From £1,187 |
| 12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² | From £1,290 |
| 12' x 10' 3.6m x 3m 120 ft² / 11.15 m² | From £1,446 |
| 14' x 10' 4.2m x 3m 140 ft² / 13.01 m² | From £1,549 |
| 16' x 10' 4.8m x 3m 160 ft² / 14.86 m² | From £1,757 |
| 18' x 10' 5.4m x 3m 180 ft² / 16.72 m² | From £1,860 |
| 20' x 10' 6m x 3m 200 ft² / 18.58 m² | From £2,067 |
Corner, hexagonal and octagonal poured bases
Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.
| Size | Guide price |
|---|---|
| 7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² | From £824 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £980 |
| 9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² | From £1,187 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,290 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £835 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,275 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,648 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £1,990 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £835 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,275 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,648 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £1,990 |
No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.
Get a concrete base quote
Tell us the building or use and your postcode. An approximate size helps if you know it, but drawings are not needed for the first discussion. Call 01202 039753, use WhatsApp or send the form below.
Request your free quote
What will the concrete base be used for, and where is the site? Approximate details are fine to start.
Your enquiry
Concrete bases in Swanage
How we install a concrete base
The work is planned around the required base and the condition of the proposed area. We also discuss when the building can follow, so the concrete has the appropriate protection and curing time.
Confirm the building outline and floor level
We establish the required footprint from the building information and agree the finished level. The discussion includes the entrance and any floor layers that sit above the concrete, so the base and building assembly can be coordinated.
Prepare the area and supporting construction
Clearance, excavation, supporting layers and any specified membrane or reinforcement follow the agreed construction. Existing-base work and waste arrangements are settled beforehand, with responsibilities clear if you are undertaking any preparation.
Place and finish the concrete
The concrete is placed to the agreed form and finished for the intended purpose. An exposed workshop floor and a base beneath a supplied floor may have different requirements; the expected surface is part of the scope.
Protect the base and agree readiness
Handover includes advice on protecting the fresh concrete and the appropriate stages for access, building assembly and loading. Those arrangements depend on the specified construction and conditions, and should be coordinated with anyone delivering or fitting the building.
Access, existing bases and finished levels
Before the work is arranged, we need to understand the route to the proposed base and the space available to prepare and place the concrete. Mention gates, steps and changes of level, and share photos if convenient. The material-handling arrangements are worked out for the job.
An old slab, paving or other construction may affect both preparation and the new floor level. It can be assessed for the proposed use, then retention, alterations or removal can be agreed. Please identify anything you intend to clear yourself so the expected condition of the area is understood.
Consider the full finished floor when discussing height. A building may add bearers, a structural floor or other layers above the base. The doorway and adjoining surfaces need to be considered alongside that build-up.
Planning a concrete base in Swanage
If you need advice on the building's permissions, Dorset Council's householder guidance considers the proposed work and property. Its explanation of planning and building control helps distinguish the two checks. You can start a concrete enquiry while confirming those requirements.
For other foundation choices, our Swanage services page includes bedded paving and frames as well as ground screw installation. If you need evidence from screws already on a project, see Swanage ground screw testing.
Areas we cover around Swanage
We welcome enquiries in Swanage, Durlston, Herston, Ulwell and New Swanage.
Around Langton Matravers, enquiries include Acton, Blacklands, Coombe, Knitson and the Knaveswell and Putlake localities. Nearby villages and areas include Harman's Cross, Worth Matravers, Kingston, Corfe Castle, Studland and Norden.
The surrounding catchment also includes Church Knowle, Furzebrook, Steeple, Kimmeridge and East Creech; and Wareham, Stoborough, Sandford, Arne, Ridge, Stoborough Green and Worgret.
You can also ask about a site in the Rempstone Estate/Forest area or around Godlingston Heath. Please identify the actual property or work location so that arrangements and any relevant permissions can be considered.
For a concrete base in BH19 or BH20, show the proposed doorway and the paths, steps or other surfaces that will remain beside it. We can plan the finished level and any agreed surrounding drainage with those features, then confirm the preparation and material access for your site postcode. See our Wareham page for that town or the Dorset service directory for other listed locations.
Feedback on Craig’s earlier work
"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
Frequently asked questions
What does the poured base provide beneath the building?
It provides a continuous concrete surface constructed for the agreed project. That may support a building's timber floor, or it may be intended as the hard floor inside a suitable building. Tell us which arrangement you need, because the surface finish, construction and finished height should be considered with that use in mind.
Which dimensions should be confirmed before construction?
The important dimensions are the supplier's required foundation outline and support details, including the relationship to walls and door openings. A catalogue's overall building size may not give every base detail. Rough measurements are useful for an initial discussion; the dimensions for construction should be confirmed before the base is formed.
Can you quote a corner or multi-sided base?
Yes. The guide schedules include corner, hexagonal and octagonal shapes alongside rectangular bases. Send the model information or a sketch if available so the actual outline can be discussed. The quotation also needs to account for the construction and site preparation, as well as the footprint's shape and size.
What should I explain about the floor's intended use?
Tell us whether the concrete will remain exposed and what the building will contain. Significant machinery, vehicles, storage or other concentrated loads should be identified when relevant. That information helps establish the necessary construction and finish with the responsible project parties.
How are construction details such as reinforcement agreed?
The proposed building, floor use and site requirements inform the specification. The written scope should identify the construction being supplied, including supporting layers, reinforcement or a membrane where specified. We do not ask you to choose those details just to make an enquiry; available supplier or design information can be reviewed as the work is developed.
What happens to an old slab on the proposed footprint?
Its suitability and effect on the new work need to be considered first. Keeping it, altering it and breaking it out are different options with different preparation and waste requirements. The quotation should say what has been agreed, including disposal where required, so there is a clear starting condition for the new base.
Can I arrange part of the preparation myself?
You can discuss that with us before the scope is finalised. We need to agree what you will undertake, the required outcome and how readiness will be checked before the next stage. This is particularly useful where clearance or old-base removal is being handled separately, because the concrete work depends on suitable preparation.
How do access details affect the quotation?
They help establish how materials and work can reach the proposed footprint safely. Gate widths, steps, the route and available working space can affect preparation and handling arrangements. You can describe them or send photos if you have them; detailed access decisions are made for the actual site and scope.
How is the concrete height coordinated with the building?
We consider the complete floor and the supplier's required base level, including any layers or structure above the concrete. The entrance and surrounding ground also matter. Agreeing those relationships before construction helps the foundation and building installers work to the same intended finished arrangement.
When can the building and its contents go on the base?
Follow the curing and loading advice agreed for the supplied construction and conditions. Being able to walk on a surface does not necessarily mean it is ready for every assembly operation or final load. Tell us the intended delivery and fitting dates so appropriate readiness can be discussed before the programme is fixed.
What if I need paving rather than a continuous pour?
JustBases also offers paving slabs laid on a concrete or mortar bed. That is a separate base arrangement, with its own prepared support and layout. We can discuss which service suits the building and floor requirement; the paving guide and Swanage overview explain that option alongside poured concrete.
What will the written concrete order identify?
It will set out the agreed work, including the base outline and construction, preparation and finish, and any removal or disposal included. Responsibilities for work undertaken separately should be clear too. The handover arrangements cover protection and readiness for the building. You can begin the discussion with your project and postcode before those details are complete.
What happens next
We can discuss the proposed floor and site, confirm the information needed for the construction and provide a written quotation. Once the scope is agreed, we arrange the work and the handover advice for your building programme. Ask for a concrete quote, call 01202 039753 or use WhatsApp.
