A poured concrete base before the building is fitted

Concrete base installation in Yeovil

JustBases installs poured concrete bases in Yeovil for sheds, workshops, garden rooms and other suitable garden buildings. We prepare the foundation and form a solid, level supporting surface, with the construction and finish matched to the building and its use.

Concrete bases for sheds and garden buildings

Concrete is useful when you need a continuous base beneath the building or want the slab to serve as the floor itself. The required size, ground preparation, concrete construction and surface finish are considered together. This provides a defined foundation for the next stage of the project, including any floor or building work by a separate supplier.

We discuss the loads and everyday use before agreeing the specification. A slab supporting a supplied shed floor has a different role from an exposed workshop floor. Reinforcement, thickness and edge details are included where the agreed design requires them.

Sheds

Sheds

The slab should support the shed's required bearings and suit its fixing details. Confirm the actual foundation dimensions and tell us what will be stored inside, particularly if heavy items or wheeled equipment will be used.

Learn more: Sheds
Workshops

Workshops

For an exposed concrete floor, the finish is part of the working environment. Discuss equipment positions, concentrated loads and how tools or materials will enter. These details help establish a suitable slab and practical threshold.

Learn more: Workshops
Garden rooms

Garden rooms

The room's floor build-up determines where the concrete should finish. We coordinate the slab with the supplied floor system and wall supports so insulation, finishes and the doorway can be handled by the appropriate installer.

Learn more: Garden rooms
Log cabins

Log cabins

Use the cabin supplier's foundation plan to establish the supporting outline, including any veranda or additional bearing. The slab edge and finished height are agreed with the cabin's wall and floor construction.

Learn more: Log cabins
Greenhouses

Greenhouses

Concrete can form the agreed greenhouse foundation or hard-floor arrangement. If planting beds are wanted, settle their layout before specifying the poured area, alongside the perimeter frame, anchoring and door opening.

Learn more: Greenhouses
Browse 74 application guides

Concrete base prices in Yeovil

The guide prices below give a starting point for comparing base options. A supplier's advertised building size is useful for an initial estimate. The final quotation and set-out need the actual foundation dimensions, intended floor arrangement and agreed level.

What affects your quotation

Your concrete quotation describes the required area and construction, the preparation and finish, and the practical means of getting materials to the site. Tell us about existing paving or concrete so any breaking out and disposal can be included explicitly. Any additional design, unusual loading or work outside the base package is identified before it is undertaken.

Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.

Rectangular poured bases: all guide sizes
SizeGuide price
8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² From £839
10' x 6' 3m x 1.8m 60 ft² / 5.57 m² From £997
10' x 8' 3m x 2.4m 80 ft² / 7.43 m² From £1,208
12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² From £1,314
12' x 10' 3.6m x 3m 120 ft² / 11.15 m² From £1,472
14' x 10' 4.2m x 3m 140 ft² / 13.01 m² From £1,577
16' x 10' 4.8m x 3m 160 ft² / 14.86 m² From £1,788
18' x 10' 5.4m x 3m 180 ft² / 16.72 m² From £1,894
20' x 10' 6m x 3m 200 ft² / 18.58 m² From £2,105
Corner, hexagonal and octagonal poured bases

Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.

Corner
SizeGuide price
7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² From £839
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £997
9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² From £1,208
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,314
Hexagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £850
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,298
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,678
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £2,026
Octagonal
SizeGuide price
6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² From £850
8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² From £1,298
10' x 10' 3m x 3m 100 ft² / 9.29 m² From £1,678
12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² From £2,026

No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.

Get a concrete base quotation

An idea for the building and its postcode is enough for your first enquiry. If you already know the approximate footprint, send it with a product link or photo of the proposed position. You can discuss the base before obtaining detailed drawings.

We will work through the preparation, access and building requirements with you, then provide a written quotation for the agreed installation. Use the form, phone 01202 039753 or contact Craig on WhatsApp.

Request your free quote

Just give us your contact details and a short description of what you want to build. We will guide you through the rest.

Your enquiry

Concrete bases in Yeovil

Please provide either an email address or a phone number.

Add site photos, video or a drawing (optional)

Upload up to 5 photos or a short video of your site to help us provide an accurate quote.

0/5 files. JPG, PNG, WebP, PDF, MP4, MOV accepted — up to 100MB each.

Free, no-obligation quote. Your details are used to respond to this enquiry; see our privacy policy.

How we build your concrete base

The installation covers more than placing the concrete. The ground beneath it, the supporting edges and the finished level all contribute to a base that suits the building. The work and any preparation by others are set out in the quotation.

Confirm the outline and levels

We establish the required footprint from the building information and agree the base position. The proposed top level is checked against the entrance, surrounding ground and the floor being fitted above it.

Prepare the ground and edges

The agreed clearance and excavation are completed, followed by the specified supporting preparation. Formwork sets the slab outline and height. Reinforcement and other construction details are put in place where required by the design.

Place and finish the concrete

Concrete is placed to the agreed construction and finished for its intended role. A base beneath a separate floor and an exposed working surface are considered on that basis, with the edges and any agreed details completed.

Protect, cure and hand over

The fresh slab needs suitable protection and time to develop strength. We explain when the proposed building and loads can be introduced, allowing for the concrete, conditions and agreed construction before the next installer takes over.

Access, old bases and finished levels

Show us the route from the unloading point to the base, including steps, narrow gates and turns. The available route helps us plan material handling and the concrete delivery method. Photographs taken along it are useful, and any shared access should be identified when we discuss the job.

An existing base can be assessed for the proposed building, or its removal can form part of the new work. We agree what is to be retained, broken out and taken away before pricing the preparation. If services are known to cross the site, provide the available information so safe working can be planned.

The top of the concrete and the finished indoor floor may be at different heights. We allow for the intended floor above the slab and discuss the route through the door, including any separate step or ramp. The surrounding ground should be considered with the building supplier's moisture and threshold details.

Poured concrete is a continuous slab. A paving slab base is made from individual slabs on a concrete or mortar bed and has a different construction and surface. We can explain either option if you are deciding what the building needs.

Planning your base and building

Agree the building's proposed position and use before fixing the base location. For Yeovil addresses, Somerset Council's planning guidance and conservation-area information provide the starting checks for the property. A permission or restriction may affect what can be built and where.

Check building regulations separately through Somerset Building Control or your appointed professional. If you are enquiring from a nearby Dorset village, the council postcode finder helps identify the relevant authority. Share any approved foundation requirement or condition that affects the slab.

Concrete base enquiries around Yeovil

Enquiries are welcome from Yeovil's BA20 and BA21 addresses, the surrounding BA22 villages and nearby parts of TA14, TA15, TA18, DT9 and DT2. Send the full postcode and location of the work so we can confirm the quotation and visit arrangements.

  • Yeovil neighbourhoods: town centre, Hendford, West Hendford, Penn Hill, Huish, Reckleford, Pen Mill, Newtown, Goar Knap, Milford Dip, Larkhill, St Michael's Avenue, Westfield, Summerlands, Westlands, Abbey Manor, Preston Plucknett, Houndstone, Lufton, Alvington, Brimsmore, Great Lyde, Wyndham Park, Yeovil Marsh, Combe Street Lane, Coppitts Hill and Johnson Park.
  • Nearby parish areas: Brympton d'Evercy, Chilthorne Domer, Mudford, Up Mudford, Mudford Sock, West Mudford, Hinton, Ashington, Chilton Cantelo, Marston Magna and Rimpton.
  • The Cokers and neighbouring villages: East Coker, North Coker, Burton, Holywell, Keyford, Naish, West Coker, Hardington Mandeville, Hardington Moor, Pendomer, Barwick, Stoford, Closworth and Sutton Bingham.
  • Montacute and Ham Hill villages: Higher Odcombe, Lower Odcombe, Montacute, Tintinhull, Stoke sub Hamdon, Norton sub Hamdon, Chiselborough, East Chinnock, West Chinnock and Middle Chinnock.
  • Ilchester and other nearby villages: Ilchester, Northover, Sock Dennis, Limington, Yeovilton, Podimore, Bridgehampton, Speckington, West Camel, Urgashay, Queen Camel and Corton Denham.
  • Dorset fringe enquiries: Bradford Abbas, Clifton Maybank, Over Compton, Nether Compton, Trent, Adber, Hummer, Sandford Orcas, Thornford, Beer Hackett, Knighton, Yetminster, Ryme Intrinseca, Chetnole, Leigh, Halstock, Halstock Leigh, Adams Green, Corscombe, East Chelborough and West Chelborough.

Feedback on Craig’s earlier work

"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
— Alan, ChristchurchMyBuilder · BH23 · Concrete base
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
— Paul Leister, BroadstoneMyBuilder · BH18 · 6m x 4m Concrete shed base

Frequently asked questions

A few decisions about size, floor and timing make a concrete base easier to plan. We can help you work through them before the building is ordered.

When is a concrete slab a useful choice for a garden building?

It is a useful option when the building needs continuous support or you want a hard floor underfoot. We consider the building's construction, expected loads and site preparation before specifying the slab. If the building includes a timber floor, its bearer and moisture details also need to be coordinated with the concrete.

How are the final concrete base dimensions agreed?

The selected building's foundation information sets the required supporting footprint and any additional bearings. We also agree the position and finished level on site. Send the model or advertised size initially; obtain the supplier's final dimensions before the concrete outline is confirmed and the work is booked.

Will the slab need reinforcement or a particular thickness?

Those details follow the proposed loads, building requirements and supporting ground. We establish the appropriate construction rather than asking you to specify it yourself. Where a structural design is required, the relevant details are agreed before installation and included in the scope used for the quotation.

How long after pouring can the building be installed?

The loading time depends on the concrete specification, curing conditions and loads being introduced. We agree an appropriate period and give handover advice for the installation. Tell us the building supplier's intended delivery date so there is time for preparation, pouring and curing before assembly starts.

Can you remove the old concrete or paving first?

Old-base removal can be included as agreed work. Describe its approximate size and condition and show the access for removing material. Breaking out, excavation and disposal are identified in the written quotation, along with any part that will remain or be dealt with by someone else.

Can you work with a narrow side passage?

We assess the available route and plan a suitable way to bring materials to the base. Include gate widths, steps, changes in direction and the distance from the unloading point. Access affects the handling involved, so photographs of the whole route help us establish a realistic method and price.

How do you set the level near the building's doorway?

We work back from the intended finished floor and the building's threshold detail. That accounts for any bearers, insulation or floor covering above the slab and the garden level outside. If a step or ramp is needed, its design and who supplies it should be agreed alongside the base.

Can the concrete be the finished workshop floor?

Yes, when its construction and finish are specified for that purpose. Tell us how the room will be used, including equipment loads and the movement of tools or stock. Any later coating or floor covering needs compatible preparation and moisture conditions, coordinated with its supplier.

Do I need a full concrete floor in a greenhouse?

The growing arrangement is your starting point. Some greenhouse layouts use soil beds and paths, while others suit a hard floor. We discuss the foundation and perimeter support required by the greenhouse model, then agree what is poured so the base serves both the structure and the intended planting.

Does having a concrete base settle the planning requirements?

Planning and building-control requirements relate to the proposed project and property. Check the building's position, dimensions and use with the relevant authority or professional, and share any requirements that affect the foundation. We can then price the concrete work against those agreed details.

What should I check when comparing concrete base quotes?

Look for the same footprint, construction and finished level, then compare preparation, disposal, access, surface finish and handover. Confirm whether the price is for the foundation only or includes anything above it. A clear scope makes it easier to see whether another quotation describes the same work.

Should I order the base before the building?

You can discuss and budget for the base while selecting the building. Once the model is settled, obtain its foundation requirements and coordinate the dates with us and its installer. That gives you a confirmed supporting outline and a practical curing period before the building arrives.

Arrange your concrete base

Send your Yeovil-area postcode and tell us about the building for a written quotation. For the wider choice, see our Yeovil services and Somerset coverage. A raised framed building may also suit ground screw installation; screw testing is available separately where evidence is required.