
Concrete base installation in Chippenham
JustBases prepares and installs poured concrete bases in Chippenham and nearby villages. We can provide a continuous base for your garden building, with its construction and finished surface agreed for the intended use.
Concrete bases for sheds and garden buildings
A poured base gives the building a continuous supporting surface. Where the concrete will also be used as the floor, its finish and intended use form part of the specification. We discuss those requirements alongside the footprint and the way the building is to be fixed or supported.
The guides below cover familiar uses. Individual paving slabs on a concrete or mortar bed, raised frames and screw supports are different arrangements, which you can compare on the Chippenham base services page if you are still deciding.

Shed bases
We plan the base around the shed's actual support dimensions. If the shed includes a timber floor, its position and fixing requirements need to be coordinated with the concrete beneath it.
Learn more: Shed bases
Garden room bases
A garden room may have a floor build-up or foundation detail specified by its supplier. Pass that on so the supporting construction, finished height and doorway can be considered together.
Learn more: Garden room bases
Workshop bases
Plan for the work and storage the workshop will hold, including the location of any heavy equipment. The slab and its surface need to be specified for those requirements as well as the building shell.
Learn more: Workshop bases_1768039694155.CrOLEM4N_1XJ4xe.webp?dpl=dpl_BC3QiZExVcAMF6meDzMb7s6ibQnq)
Greenhouse bases
Tell us whether a continuous concrete interior is wanted and what the frame needs at its perimeter. If you want to retain open growing areas, discuss the overall base arrangement before the footprint is agreed.
Learn more: Greenhouse bases
Log cabin foundations
The chosen cabin's base plan provides the supporting outline and bearer information. We can discuss the concrete work from that plan, including any shaped footprint and the level required for assembly.
Learn more: Log cabin foundationsBrowse 74 application guides
Garden & residential
Work & modular buildings
Garages & storage
Leisure & wellness
Energy & equipment
Renewable energy
Animal & agricultural
Commercial & community
Leisure accommodation
Concrete base prices in Chippenham
There are guide schedules for rectangular, corner, hexagonal and octagonal poured bases. Choose the closest outline and size for budgeting, then use the selected building's exact base plan when the work is priced. Nominal dimensions for a shaped building need confirming against that plan.
What affects your quotation
The base area and agreed construction are only part of the work to price. Preparation, the depth and handling of excavation, access for materials, old-base removal, waste disposal and changes of level also matter. Explain what is in the proposed area now and any additional work you want considered, so the written quotation describes the whole agreed job.
Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.
Rectangular poured bases: all guide sizes
| Size | Guide price |
|---|---|
| 8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² | From £839 |
| 10' x 6' 3m x 1.8m 60 ft² / 5.57 m² | From £997 |
| 10' x 8' 3m x 2.4m 80 ft² / 7.43 m² | From £1,208 |
| 12' x 8' 3.6m x 2.4m 96 ft² / 8.92 m² | From £1,313 |
| 12' x 10' 3.6m x 3m 120 ft² / 11.15 m² | From £1,471 |
| 14' x 10' 4.2m x 3m 140 ft² / 13.01 m² | From £1,577 |
| 16' x 10' 4.8m x 3m 160 ft² / 14.86 m² | From £1,787 |
| 18' x 10' 5.4m x 3m 180 ft² / 16.72 m² | From £1,893 |
| 20' x 10' 6m x 3m 200 ft² / 18.58 m² | From £2,104 |
Corner, hexagonal and octagonal poured bases
Hexagonal and octagonal sizes are nominal width-by-depth budgeting sizes. The final quotation follows the garden-building manufacturer's exact base plan.
| Size | Guide price |
|---|---|
| 7' x 7' 2.1m x 2.1m 49 ft² / 4.55 m² | From £839 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £997 |
| 9' x 9' 2.7m x 2.7m 81 ft² / 7.53 m² | From £1,208 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,313 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £849 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,297 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,677 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £2,025 |
| Size | Guide price |
|---|---|
| 6' x 6' 1.8m x 1.8m 36 ft² / 3.34 m² | From £849 |
| 8' x 8' 2.4m x 2.4m 64 ft² / 5.95 m² | From £1,297 |
| 10' x 10' 3m x 3m 100 ft² / 9.29 m² | From £1,677 |
| 12' x 12' 3.6m x 3.6m 144 ft² / 13.38 m² | From £2,025 |
No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.
Request a concrete base quote
Start with the site postcode and the kind of building. If you know the approximate dimensions, add them; you can send the manufacturer's base plan and photographs when convenient. We can talk about the project before those details are complete.
Use the form, WhatsApp Craig or call 01202 039753. We will discuss what needs preparing and what the completed base must provide, then establish the scope for a written price.
Request your free quote
Tell us what the concrete base is for. A project outline will start the conversation.
Your enquiry
Concrete bases in Chippenham
How we prepare and pour the base
The work is planned in stages so the concrete suits both the building and the area around it. Dimensions, levels and construction are settled before the pour, with the subsequent loading and assembly arrangements discussed at handover.
Confirm the outline and floor level
We establish the supporting footprint from the building information and agree the proposed top level. Doorways, floor layers, nearby paths and the intended use help define the base and any further details needed for its construction.
Agree and carry out ground preparation
The quotation sets out the preparation and any removal included. Once the site and known services have been assessed for the work, the area is prepared for the specified supporting layers, edges and any required membrane or reinforcement.
Pour and finish the concrete
The concrete is placed and finished for the agreed base. A slab intended as the exposed floor and one forming part of a supplier's floor construction may have different surface requirements; these are established when specifying the work.
Curing and building handover
We explain the appropriate curing and loading advice for the new concrete. The building's erection and any substantial loading must be coordinated with that advice, so discuss proposed delivery dates while planning the installation.
Access, old bases and the finished surface
We need to plan how the materials will reach the footprint and how any removed material will leave. Describe the available entry point and the route to the work, including changes in level or openings that affect it. A few photos can make that discussion easier without requiring you to survey the route before enquiring.
If you hope to use an old slab, its suitability needs assessment for the replacement building. If it is to be removed, the breaking out and disposal must form part of the agreed work. Let us know whether clearance or other preparation is being arranged separately so we can coordinate the base installation with it.
Consider what you want to walk or work on inside the completed building. This helps establish the floor finish, while the doorway and the adjacent garden surface help establish its height. Any specified floor layers above the concrete also need to be included when those levels are agreed.
Planning your Chippenham concrete base
Use the actual building proposal and property when asking Wiltshire Council for planning advice. The town and parish councils comment on applications; Wiltshire Council makes the planning decisions. Its public register is the route for finding application records by address, postcode or reference.
Building control is a separate advice route for building-regulations requirements. Share any confirmed foundation or floor requirements with us as the installation is developed. You can start discussing the base while choosing the building and checking these matters.
Compare raised support with a ground screw foundation if your building has a suitable floor.
Concrete base enquiries around Chippenham
Enquiries are welcome from Chippenham centre, Cepen Park, Derriads, Hunters Moon, Hardenhuish, Hardens, Lowden, Rowden, Monkton Park, Pewsham, Sheldon, Frogwell, Queens Crescent, Redland, Englands, Bumpers Farm, Patterdown and Showell.
Around the Langley and Kington villages, we welcome enquiries from Langley Burrell, Kellaways, Kington Langley, Kington St Michael, Easton Piercy, Stanton St Quintin, Lower Stanton St Quintin, Draycot Cerne, Sutton Benger, Seagry, Upper Seagry, Lower Seagry, Christian Malford, Great Somerford, Little Somerford and Startley.
The surrounding enquiry area also includes Bremhill, Bremhill Wick, East Tytherton, Tytherton Lucas, Foxham, Charlcutt, Spirthill, Stanley, Avon, Ratford, Derry Hill, Old Derry Hill, Studley, the rural Pewsham area, Bowood, Sandy Lane and Calne.
Villages around the western side include Allington, Lanhill, Yatton Keynell, West Yatton, Giddeahall, Long Dean, Broomfield, Tiddleywink, Kents Bottom, Biddestone, Slaughterford, Castle Combe, Grittleton, Littleton Drew, Leigh Delamere, Sevington, Foscote, The Gibb, Hullavington, Bradfield, Nettleton, Burton and North Wraxall.
We also welcome enquiries from Lacock, Reybridge, Notton, Bowden Hill, Bewley Common, Lackham, Hartham, Thingley, Corsham, Pickwick, Gastard and Neston. Useful district examples are SN14 around western Chippenham and nearby villages, SN15 around the centre, east and many northern villages, SN13 around Corsham and SN11 around Derry Hill and Studley. Give us the full postcode and service required so we can confirm arrangements for the property.
Feedback on Craig’s earlier work
"Work completed as agreed. Workers were friendly, polite and cleaned up on completion. Overall very pleased."
"If you're looking for reliable, friendly and quality tradesmen to do groundwork look no further than Craig and his team. Don't be dissatisfied by shabby work from cheap quotes, pay that tiny bit extra and get a professional job done well. I would recommend them without hesitation."
Concrete base questions
Can the poured base be the floor used inside the building?
Yes, where that is a suitable arrangement for the building and intended use. Tell us whether the concrete will be exposed inside, covered by another floor construction or beneath a floor supplied with the building. The surface and supporting construction can then be specified with that in mind, including any equipment or storage loads that need to be considered.
What building dimensions establish the slab outline?
Use the manufacturer's foundation or base plan when one is available. We need to establish the outline supporting the structure, including the intended fixings and doorway. An advertised building size is useful for an initial budget discussion, then the precise supporting footprint is confirmed before the work is set out.
Can you quote for a shaped footprint?
Yes. Rectangular, corner, hexagonal and octagonal guide schedules are available. The building's actual base plan establishes the concrete outline to price, particularly where nominal dimensions do not describe its sides and corners. If you have not selected a model yet, explain the shape and likely size and we can begin with that information.
How do you assess an old concrete base?
Start by comparing the old slab's outline and top level with the replacement building's base plan. Its condition and known construction also need assessment before reuse is agreed. Tell us what information you have about it; we can discuss an assessment and identify any work needed to make the new base arrangement suitable.
What clearance should be agreed before work?
Identify what occupies the footprint now and which clearance you would like included. If you are arranging dismantling or removal through someone else, let us know what will be left for the base work. The quotation and preparation arrangements should make those responsibilities clear so the area is ready for the planned installation.
How is the floor level set beside a path or doorway?
We discuss the building's entrance and complete floor construction together with the surrounding surface. The concrete top level must allow for anything fitted above it as part of the floor. Show us the existing approach and any planned changes, then the required level and any associated edge or surrounding work can be agreed before pouring.
What access information helps plan material delivery?
Describe the route from the available entry point to the base, including narrow openings, steps and changes of level. It is also useful to know what working space is available beside the footprint. We can discuss practical arrangements from that information and convenient photos, with further assessment if needed before the work is confirmed.
Which preparation and removal items affect the quotation?
Excavation, taking away soil or an old base, the supporting layers, access and the proposed finished level all affect the job. Additional clearance or surrounding surfaces need their own agreed scope. The written quotation sets out the preparation and concrete work included, so ask us about anything you want clarified before accepting it.
How is the slab construction established for its loading?
The specification needs the building and intended use, together with the site assessment and any supplier or designer's foundation requirements. That establishes the construction to agree, including any membrane or reinforcement required. Tell us about concentrated equipment or storage loads while discussing the project.
How do I coordinate delivery with curing?
Let us know the proposed assembly date while planning the base. We will discuss the concrete's curing and loading advice for the work and when the building can follow. Confirm that sequence with the building supplier before arranging erection, and follow the handover advice for access and loading after the pour.
Where do I obtain property and building-control advice?
Use Wiltshire Council's planning advice service for the proposed building and the public register for existing application records at the address. Building control deals separately with building-regulations advice. Send us any confirmed requirements that affect the base position, floor or construction.
What is enough information for the first enquiry?
Tell us the postcode and whether the base is for a new building or a replacement. If you already know the model or size, include it. We can use that outline to discuss the concrete work; a final supplier plan and any construction details can be settled as the quotation develops.
Discuss the base and preparation
Tell us about the building, the position and the work you want included. We can discuss the concrete base, provide a written quotation and agree the installation and handover arrangements with you.
