Ground screws before installation

Ground screw installation in Chippenham

We install ground screw supports in Chippenham and nearby Wiltshire villages, with frame arrangements to suit the building. Where appropriate, screws reduce excavation across the base area and provide raised support without a full concrete slab.

Ground screw supports and frame choices

A ground screw foundation supports the building at specified positions. The floor and frame distribute its loads to those positions, where connections transfer them into the screws and ground. Getting the floor arrangement right is therefore part of choosing the foundation.

This approach can be useful when you want a raised floor and a smaller area of excavation. It also avoids waiting for a full poured slab to cure where screws are the agreed solution. We establish compatibility with the building's requirements before settling the support and connection details.

Supporting the building's own floor

If the building supplier provides the structural floor or frame, we can quote for installed screws ready for that arrangement. Obtain its support plan and connection requirements as the project develops. Our guides cover garden rooms and sheds, whose floor construction can vary between models.

Other frame arrangements

Steel, bespoke timber and other non-standard frames are individually quoted. For a workshop or log cabin, share the intended use and supplier's support requirements so the foundation and frame work can be considered together.

Browse 74 application guides

Ground screw prices in Chippenham

The guide below separates installed screws with a frame by others from screws with the stated timber frame. Decide which parts your building supplier is providing when comparing them; the appropriate package depends on how the building's floor will be supported.

The written quotation covers the agreed layout and installation, along with any commissioned preparation, connections or frame work. Access to the support positions, the required finished height and non-standard work can affect the price. Steel and bespoke frames need their own quotation.

Local guide prices start with our Ringwood prices, adding 0.1% for each one-way road mile to the town, then rounding up to a whole pound. Your written quotation confirms the price for your site and agreed work.

Building sizeInstalled ground screwsFrame by othersInstalled screws + timber frame
8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² From £1,245From £1,740
10' x 8' 3m x 2.4m 80 ft² / 7.43 m² From £1,350From £1,845
12' x 10' 3.6m x 3m 120 ft² / 11.15 m² From £1,476From £1,951
16' x 10' 4.8m x 3m 160 ft² / 14.86 m² From £1,582From £2,162
20' x 10' 6m x 3m 200 ft² / 18.58 m² From £1,687From £2,583

No VAT is added to the guide prices shown. Guide prices are subject to site conditions, access and the written quotation.

Get a ground screw quotation

Give us the postcode and tell us what you plan to put on the foundation. An approximate size or a link to the building is helpful if you have one. We can start the discussion now and identify any supplier details needed before the work is specified.

Use the form, WhatsApp Craig or call 01202 039753. Photos and drawings are welcome, but you do not need to arrange a technical submission before making contact.

Request your free quote

A short description of your building is enough to begin an installation enquiry.

Your enquiry

Ground screw installation in Chippenham

Please provide either an email address or a phone number.

Add site photos, video or a drawing (optional)

Upload up to 5 photos or a short video of your site to help us provide an accurate quote.

0/5 files. JPG, PNG, WebP, PDF, MP4, MOV accepted — up to 100MB each.

Free, no-obligation quote. Your details are used to respond to this enquiry; see our privacy policy.

Planning and installing the foundation

We coordinate the ground supports with the proposed floor. The agreed scope identifies the screw installation, any frame supplied and the work remaining for the building supplier.

Agree the floor and support requirements

Agree the floor and support requirements

The building information establishes where loads reach the foundation. We discuss the support positions, connections and finished floor height, alongside the site assessment needed to specify the screws. Required design information and responsibilities are settled as part of planning the work.

Set out and install the screws

Set out and install the screws

The agreed positions are set out on site and the working area is prepared for installation. Known services, access and obstructions are considered before work proceeds. Screws are installed to the specification and layout established for the project, with any separately commissioned monitoring or testing arranged at the relevant stage.

Complete the connections and handover

Complete the connections and handover

Where a frame is included, the quoted frame and its supporting connections are completed. Where it is by others, the handover needs to match the supplier's agreed requirements. We discuss the installation information being provided and when the next contractor can proceed with the building.

Access and preparation for the screw supports

The installation needs a workable route to the proposed base and room around the individual support positions. Mention gates, changes in level and anything that restricts entry. A few ordinary photos can help us discuss whether a site visit or further information is needed to plan the work.

If the area contains paving, an old base or other obstructions, tell us what is there and whether you want it retained. Any openings, removal or reinstatement must be agreed with the installation scope. Share available information about buried services so the checks and preparation can be planned safely.

Think about the top of the finished floor as well as the ground underneath. Its height affects the doorway, approach and connection to adjoining surfaces. We agree that relationship with the building details, including any steps or other work that needs to be arranged separately.

Ground screw testing in Chippenham

If testing has been requested for the design assessment, discuss the required evidence while the installation is being planned. We can coordinate separately commissioned tests with the relevant stage of work through our Chippenham testing service. Insertion torque monitoring and specialist torsional testing each have a price-on-application scope and are not automatically part of installation. Monitoring concerns turning resistance during insertion; torsional testing applies a twisting load.

Information for your building project

Wiltshire Council deals with planning applications for Chippenham and the surrounding villages. Use the property register to look up an address or reference, and seek planning advice where the proposal needs it. Building control is a separate enquiry about the regulations.

Ground screw enquiries around Chippenham

Enquiries are welcome from Chippenham centre, Cepen Park, Derriads, Hunters Moon, Hardenhuish, Hardens, Lowden, Rowden, Monkton Park, Pewsham, Sheldon, Frogwell, Queens Crescent, Redland, Englands, Bumpers Farm, Patterdown and Showell.

Around the Langley and Kington villages, we welcome enquiries from Langley Burrell, Kellaways, Kington Langley, Kington St Michael, Easton Piercy, Stanton St Quintin, Lower Stanton St Quintin, Draycot Cerne, Sutton Benger, Seagry, Upper Seagry, Lower Seagry, Christian Malford, Great Somerford, Little Somerford and Startley.

The surrounding enquiry area also includes Bremhill, Bremhill Wick, East Tytherton, Tytherton Lucas, Foxham, Charlcutt, Spirthill, Stanley, Avon, Ratford, Derry Hill, Old Derry Hill, Studley, the rural Pewsham area, Bowood, Sandy Lane and Calne.

Villages around the western side include Allington, Lanhill, Yatton Keynell, West Yatton, Giddeahall, Long Dean, Broomfield, Tiddleywink, Kents Bottom, Biddestone, Slaughterford, Castle Combe, Grittleton, Littleton Drew, Leigh Delamere, Sevington, Foscote, The Gibb, Hullavington, Bradfield, Nettleton, Burton and North Wraxall.

We also welcome enquiries from Lacock, Reybridge, Notton, Bowden Hill, Bewley Common, Lackham, Hartham, Thingley, Corsham, Pickwick, Gastard and Neston. Useful district examples are SN14 around western Chippenham and nearby villages, SN15 around the centre, east and many northern villages, SN13 around Corsham and SN11 around Derry Hill and Studley. Give us the full postcode and service required so we can confirm arrangements for the property.

Feedback on Craig’s earlier work

Feedback on Craig’s earlier groundwork and customer service.

"Craig and the team are absolutely fantastic. From courtesy, to standard of work, to tidiness — everything exceeded expectations. The job was arranged, booked and done extremely quickly and we are very happy with the results. Nothing was too much trouble, and communication was easy."
— Verified CustomerMyBuilder · SO · Cobble edge and gravel strip
"Craig and his crew were excellent from the first communication, quote, timing of work and quality of work. Highly recommended."
— Verified CustomerCheckatrade · BH20 · Garage base

Ground screw installation questions

What sort of floor can ground screws support?

The floor needs a structural arrangement that transfers the building's loads to the screw positions. A suitable framed floor can do this, using the required connections and support layout. Check what your chosen building includes: its floor may be supplied complete, need a separate supporting frame or require a different foundation. We can discuss the supplier's information with you and quote the appropriate supporting work.

Can you install the screws for a frame supplied by someone else?

Yes, installed screws with a frame by others are a distinct option. Before installation, the parties need to agree the bearing positions, connection details and levels so the frame fits the supports. Tell us who is providing it and send any available support information. The quotation can then make clear where our installation finishes and the frame supplier's work begins.

How is the building carried by the screws?

Loads from the building reach the floor or frame and pass through its supporting connections into the ground screws, then into the ground. The frame makes those individual supports work with the building's construction. Its design and connection details therefore matter alongside the screws themselves, particularly when the floor and foundation are being supplied by different contractors.

What does the screws-and-timber-frame option provide?

It combines the installed screws with the timber frame described in the package. Compare that description with the selected building's floor requirements, then check the written quotation for the actual frame, connections and preparation included. A supporting frame and a completed floor with all its layers are different parts of the construction, so confirm which are supplied with the building.

Can I ask about a steel or bespoke frame?

Yes. Steel and non-standard timber arrangements are individually quoted because the frame work and its connections need to suit the project. Let us know whether you already have a proposed frame or want to discuss one alongside the screws. Available drawings are useful later in agreeing that work; an outline of the building and its intended use is enough for the first conversation.

How are screw positions and specifications decided?

The support requirements come from the building's loads and floor arrangement, with the site assessment and screw system informing the foundation specification. The layout, product selection and connection responsibilities must be established before installation. Bring any supplier support plan to the discussion when available, and we can identify what further design or project information is needed.

What should I tell you about access?

Describe how the proposed position is reached from outside the property. Gate openings, steps and limited working space are useful things to mention; photographs can make the route easier to understand. We use that information to discuss the practical installation arrangements and any preparation required. You do not need to measure every part of the route before asking for a quotation.

What if there is paving or an old base where the screws would go?

We need to consider the existing surface together with the proposed support positions. Tell us what is there, whether it is to stay and what is known about services beneath it. The assessment establishes what access to the ground is required and whether removal or other preparation is needed. Any associated clearance and reinstatement should be identified in the quoted work.

Can the finished floor height be agreed with the doorway?

Yes, the intended floor height is part of planning the foundation. The supplier's floor depth, door detail and the level of the approach help establish the support height required underneath. Discuss steps, paths or adjacent finished surfaces at that stage, including who will provide any work beyond the foundation. It is easier to coordinate these details before the screw positions and frame are finalised.

When should my building supplier arrange assembly?

Coordinate assembly with the agreed foundation programme and the supplier's requirements for accepting the completed supports or frame. Where different contractors provide the screws, frame and building, each needs to know what will be ready at handover. Discuss delivery dates during the quotation process so access, preparation and the next stage of work can be arranged together.

Can testing be arranged as part of the project?

Yes, testing can be discussed alongside an installation proposal where evidence is required. The test method, positions, loading and acceptance requirements need their own agreement, with the reporting included in the scope. Our local testing page explains the options. Ask before installation if the project needs evidence at a particular stage so the relevant work can be planned.

Are torque monitoring and a torsional test the same service?

No. Monitoring records resistance as the screw turns into the ground during installation. Specialist torsional testing applies an agreed twisting load to investigate the screw's response. Each has a separate price-on-application scope and must be specifically requested. Neither automatically supplies the evidence from a physical pull, compression or lateral test.

How does the installation guarantee differ from the screw's lifespan?

Correctly specified hot-dip galvanised ground screws may have an expected lifespan of 50 years or more, subject to ground conditions and correct installation. The full ten-year JustBases guarantee covers installation workmanship and the screws or foundation materials we supply, subject to the written quotation. That is separate from product life and from any warranty the building supplier provides.

Can I enquire before I have the support drawings?

Yes. Tell us what you plan to install and give the postcode. An approximate size, building link or simple description lets us begin discussing the foundation. We can then explain which supplier details will be needed to confirm compatibility and prepare the installation scope. Send drawings or photos when available rather than delaying the first enquiry.

Speak to Craig about your installation

Tell us the building you are planning and where it will stand. We will discuss the supporting work, establish what is needed for the quotation and agree installation arrangements with you. Use the quotation form, WhatsApp or 01202 039753.