Specialist base installation

Static Field Shelter Foundations

A static field shelter needs secure wind-resistant support and a durable standing area that does not become deeply poached in wet weather.

Open-fronted timber field shelter on a firm drained base Illustrative image

50+ years

Family groundwork experience

Full 10-year

Written JustBases guarantee

Fully insured

Documents available

One clear price

Written foundation scope

Built for this application

What the foundation needs to do

Mobile shelters on skids and permanent static shelters are different projects. A fixed timber field shelter commonly uses a concrete base or a proprietary foundation pack, with planning implications that should be resolved first.

We install the approved permanent foundation and can discuss a hardened apron or drainage around the open front.

Options, assessed properly

Suitable foundation methods

The methods below are possibilities to assess—not interchangeable specifications. We match the foundation to the product, loads, support points, ground and access.

Concrete

Concrete foundation

A full slab and supplier-specified wall plinth provide permanent support and a durable internal floor.

Often worth considering for: Static shelters, hay bays and fixed paddock buildings

Ground screws

Ground screws and support frame

An engineered screw and frame system may support a suitable static shelter with limited wet concrete, subject to wind and animal-floor design.

Often worth considering for: Approved lightweight shelters on slopes or remote sites

A written price for the approved detail

Specialist foundations are quoted from the actual product, support plan and site information. No VAT is added to the guide prices shown.

View base prices

Before installation

Dimensions, approvals and responsibilities

A shelter fixed to a concrete foundation is generally treated differently from a genuinely mobile shelter. Confirm planning before committing to a static base.

The animal standing surface may extend beyond the structural footprint to manage entrance poaching; include it in the requested scope.

JustBases quotes the agreed foundation and groundwork. Product installation, specialist connections, commissioning and third-party design remain outside our scope unless the written quotation expressly includes them.

A simple route forward

From first call to ready base

  1. 1

    Talk through the plan

    Tell us about the static field shelter, approximate size and site. We will identify any useful supplier information.

  2. 2

    Agree the foundation

    We assess access, levels, support requirements and ground, then provide a clear written quotation.

  3. 3

    Install and hand over

    Our team installs the agreed base and leaves it ready for the approved building or equipment installer.

Genuine customer feedback

Reviews of our foundation work

"I couldn't recommend Craig highly enough! Communication prior to the job was outstanding even considering our ever changing goal posts. Craig and his team turned up exactly at the agreed time, were well presented, friendly and professional. The cleanliness, attention to detail and quality of the job was outstanding."

— Verified Customer, BH16Log cabin foundation · Checkatrade

"Good standard of workmanship. Friendly and efficient. Prompt response for estimate and fitted into our timescale. Will be using the firm in future and thoroughly recommend them."

— Verified Customer, SP6Concrete base for new summerhouse · Checkatrade

"Craig and his team were very professional throughout the job. They worked tirelessly and extremely hard. The job involved digging up a thick reinforced concrete base. Then creating a whole new base with precision engineering in preparation to accept a new building on top. The result was an excellent job all round."

— Verified Customer, BH24Building foundations and landscaping · Checkatrade

Easy to start, free to ask

Tell us about your static field shelter

You do not need drawings or a finished specification before getting in touch. Send what you have and Craig will explain the useful next step.

Helpful details, if available

  • Static shelter make and size
  • Supplier foundation plan
  • Open-front direction
  • Planning status
  • Apron and drainage area
Craig Phillips of JustBases

Talk to Craig

Craig will listen to what you are planning and help establish the foundation information that matters.

Call Craig 01202 039753 Message Craig on WhatsApp

Online quote requests are normally answered within 24 hours, excluding weekends.

Request your free quote

Just give us your contact details and a short description of what you want to build. We will guide you through the rest.

Your enquiry

Field Shelter Foundations installation

Please provide either an email address or a phone number.

Add site photos, video or a drawing (optional)

Upload up to 5 photos or a short video of your site to help us provide an accurate quote.

0/5 files. JPG, PNG, WebP, PDF, MP4, MOV accepted — up to 100MB each.

Free, no-obligation quote. Your details are used to respond to this enquiry; see our privacy policy.

Straight answers

Field Shelter Foundations FAQs

Usually a mobile shelter is designed to remain movable on skids. A permanent concrete base can change both its operation and planning status.