Secure mobility scooter storage shed on a level accessible base

Specialist foundation installation

Mobility Scooter Store Bases

A scooter-store base should provide secure anchorage and a smooth ramp transition without creating an awkward lip for the user.

Illustrative image

50+ years

Family groundwork experience

Full 10-year

Written JustBases guarantee

Call Craig directly

Friendly practical advice

One clear price

Written foundation scope

Three easy steps

From first call to a finished foundation

Getting started is simple. We will guide you through the choices and explain any information needed before installation.

01

Call, message or send the form

Tell Craig about the mobility scooter store, approximate size and postcode. You do not need a finished specification to start.

02

Talk through the options

We discuss the site and suitable foundations, identify any supplier information needed and provide a clear written quotation.

03

Install and hand over

Our team marks out and installs the agreed foundation, with the required checks before the next stage of your project.

Choose the foundation, not the complication

Foundation options for your mobility scooter store

These are the methods worth assessing for this application. The structure, support plan and actual ground determine the right choice—not a one-size-fits-all specification.

Prepared poured concrete base for a garden building
Concrete base example; a specialist foundation may need a different engineered detail.

Concrete

Concrete foundation

A level concrete base provides robust fixing for security enclosures and can integrate with a permanent access path.

Worth considering for: Steel stores with supplied anchors and regular scooter use

From £795 for 8' × 6' (48 ft² / 4.46 m²)

Ask about this option →
Example of a prepared paving-slab base
Paving-slab base example; only suitable where the supplier accepts this method.

Paving slabs

Paving-slab base

Suitable paving may support some stores when it meets the manufacturer’s firm, level and fixing requirements.

Worth considering for: Lighter enclosures on an existing accessible patio

From £620 for 9' × 5' (45 ft² / 4.18 m²)

Ask about this option →
Ground screws before installation
Ground-screw system example; product and support design are project-specific.

Installed ground screws

Ground screws and support frame

Ground screws and a structural platform may suit a timber mobility store, provided ramp and anchoring details remain accessible and secure.

Worth considering for: Selected raised timber storage buildings

Installed screws from £1,180 for 8' × 6' (48 ft² / 4.46 m²); frame quoted separately

Ask about this option →

Clear prices, agreed scope

Compare the base options

These examples come from our central standard-base price schedule. They are starting points for comparison, not confirmation that a particular size or specification is right for your application.

No VAT is added to the guide prices shown.

Get your exact written priceView the full base price guide
Standard guide prices for the foundation methods considered on this page
Base sizeConcretePaving slabsInstalled ground screws
9' x 5' 2.7m x 1.5m 45 ft² / 4.18 m² Ask for a quote£620Ask for a quote
8' x 6' 2.4m x 1.8m 48 ft² / 4.46 m² £795Ask for a quote£1,180
10' x 6' 3m x 1.8m 60 ft² / 5.57 m² £945Ask for a quote£1,220
9' x 7' 2.7m x 2.1m 63 ft² / 5.85 m² Ask for a quote£795Ask for a quote
11' x 7' 3.3m x 2.1m 77 ft² / 7.15 m² Ask for a quote£945Ask for a quote
10' x 8' 3m x 2.4m 80 ft² / 7.43 m² £1,145Ask for a quote£1,280

Ground-screw prices cover installed screws only; the support frame is quoted separately. Raised-timber prices use suitable concrete or composite posts. Access, ground, levels and the agreed design can change the price. Ask us for sizes without a published guide price.

Easy to start, free to ask

Tell us about your mobility scooter store

You do not need drawings or a finished specification before getting in touch. Send what you have and Craig will explain the useful next step.

Helpful details, if available

  • Store model and dimensions
  • Ramp projection
  • User path and threshold level
  • Anchor detail
  • Charging cable route
Craig Phillips of JustBases

Talk to Craig

Craig will listen to what you are planning and help establish the foundation information that matters.

Call Craig 01202 039753 Message Craig on WhatsApp

Online quote requests are normally answered within 24 hours, excluding weekends.

Request your free quote

Just give us your contact details and a short description of what you want to build. We will guide you through the rest.

Your enquiry

Mobility Scooter Store Bases installation

Please provide either an email address or a phone number.

Add site photos, video or a drawing (optional)

Upload up to 5 photos or a short video of your site to help us provide an accurate quote.

0/5 files. JPG, PNG, WebP, PDF, MP4, MOV accepted — up to 100MB each.

Free, no-obligation quote. Your details are used to respond to this enquiry; see our privacy policy.

Planned around its use

What matters for your mobility scooter store

Secure mobility scooter storage shed on a level accessible base
Illustrative image — an example of the application, not a foundation specification.

We size the base around the store and approach, coordinate finished levels with the ramp, and can include an agreed empty cable duct for the electrician.

Discuss your project with Craig →

Step-free approach

Base height, ramp length and path level need to work together for safe access.

Security anchorage

The floor fixings rely on a sound substrate of the required thickness.

Dry charging space

Falls direct rain away without tilting the enclosure or bringing water inside.

Electrical route

Any charging supply is planned by an electrician before a duct is buried.

When the design and ground are suitable

Why consider ground screws?

Year-round flexibility

A screw-only foundation avoids pouring and curing concrete, reducing one source of weather-related delays. Unsafe access, flooding, frozen or unsuitable ground can still mean postponing installation.

Less digging and mess

Localised supports can reduce excavation and spoil compared with extensive concrete foundations. Clearance, pre-drilling, service trenches and machinery access may still disturb the site.

A lower-impact approach

Using less concrete and moving less spoil can reduce material use and transport. Retaining vegetation may benefit habitats, but trees and wildlife still need protection. Steel manufacture and the full project design matter to any carbon comparison.

Before installation

Dimensions, approvals and responsibilities

Use the store's actual floor and ramp dimensions. The clear manoeuvring area can be larger than the enclosure itself.

Charging installation and fire-safety considerations should be confirmed by the enclosure supplier, battery guidance and electrician.

JustBases quotes the agreed foundation and groundwork. Product installation, specialist connections, commissioning and third-party design remain outside our scope unless the written quotation expressly includes them.

Genuine customer feedback

A full 10-year JustBases guarantee

Our full written guarantee covers installation workmanship and the foundation materials we supply, subject to your quotation. Read what customers say about our foundation work below, with the original job types and sources shown.

"I couldn't recommend Craig highly enough! Communication prior to the job was outstanding even considering our ever changing goal posts. Craig and his team turned up exactly at the agreed time, were well presented, friendly and professional. The cleanliness, attention to detail and quality of the job was outstanding."

— Verified Customer

Checkatrade · BH16 · 2020-05-27

Work listed by the source: Log cabin foundation

"Good standard of workmanship. Friendly and efficient. Prompt response for estimate and fitted into our timescale. Will be using the firm in future and thoroughly recommend them."

— Verified Customer

Checkatrade · SP6 · 2019-09-16

Work listed by the source: Concrete base for new summerhouse

"Craig and his team were very professional throughout the job. They worked tirelessly and extremely hard. The job involved digging up a thick reinforced concrete base. Then creating a whole new base with precision engineering in preparation to accept a new building on top. The result was an excellent job all round."

— Verified Customer

Checkatrade · BH24 · 2021-11-30

Work listed by the source: Building foundations and landscaping

Our service area

Foundation installation across the South

For this application we cover Dorset, Hampshire, South Wiltshire. Tell Craig the postcode and we will confirm the suitable installation options and travel requirements.

Straight answers before you decide

Mobility Scooter Store Bases FAQs

We can coordinate foundation and path levels to reduce the transition, subject to the store's required ramp geometry.

Still unsure? Send Craig a short enquiry and we will help with the next step.

Tell us what you want to build

An outline of the project and your postcode are enough to start.